51 Pcec 2018

51 Pcec 2018

PCEC Updates for 2018 2018 NASA Cost & Schedule Symposium August 15, 2018 Brian Alford Mark Jacobs Booz Allen Hamilton TGS Consultants Shawn Hayes Richard Webb TGS Consultants KAR Enterprises NASA MSFC Victory MIPSSSolutions Team SB Diversity Overview • PCEC Overview • Robotic Spacecraft Updates • Crewed & Space Transportation System Update • Summary Victory Solutions MIPSS Team 2 What is PCEC? • The Project Cost Estimating Capability (PCEC) is the primary NASA-sponsored parametric cost tool for spacecraft estimates – Developed and maintained by NASA at MSFC beginning in late 2013 – Excel Add-in that provides capabilities and cost estimating artifacts used to build a spacecraft cost estimate in Excel – Based on more than 70 missions/system elements, but with separate approaches for modeling different types of systems • Robotic Spacecraft (Robotic SC) • Crewed & Space Transportation Systems (CASTS) – Completely transparent tool: no code passwords, protected sheets, etc. – Available to the general public via ONCE and the NASA Software Catalog (https://software.nasa.gov/) Victory Solutions MIPSS Team 3 Current State of PCEC • PCEC v2.2.1 was released in May 2018 – Fixes minor bugs in some templates and a minor code revision – No updates to the Library other than latest New Start Inflation indices – Update provided via Excel updater file; includes routines for making corrections to user-installed Interface and existing v2.2 estimates • Current user counts as of late July 2018 – 490+ Users / Requestors – 45+ Countries represented – ~60 users added since last year’s Symposium Victory Solutions MIPSS Team 4 PCEC User Distribution Estimated based on user-provided data Victory Solutions MIPSS Team 5 PCEC ROBOTIC SPACECRAFT UPDATES 6 PCEC Robotic Spacecraft Topics 1. New Missions 2. Entry System CERs 3. Milestone-Specific Data Analyses Victory Solutions MIPSS Team 7 Current Robotic SC Missions & New Candidates • Missions 1-42 are used for PCEC v2.2.1 CERs • Additional Candidates 1-6 have been tested with PCEC v2.2.1; Overall results are generally good • Data normalization is complete for Additional Candidates 1-4 and nearly complete for 5-6 • Additional Candidates 7-11 should have launch CADRe data available soon (before the end of FY19) • PCEC CERs could be updated in FY19 incorporating at least the first 6 additional candidates Victory Solutions MIPSS Team 8 PCEC v2.2.1 Results for New Candidates Actual $)/Actual $ $)/Actual Actual – (Estimate • Results compare the PCEC estimate to unadjusted Launch CADRe cost data • PCEC Phase BCD estimates are within 20% for 4 missions (average error is -19%) • Several of these missions experienced ‘External Impacts’ that will be normalized out of the data used for the PCEC CERs • External Impacts are the primary driver for the bias towards low estimates for 3 of these missions (GPM, MMS, and GOES-R) Victory Solutions MIPSS Team 9 PCEC Entry System CERs NASA WBS Elements Included GOAL: Derive CERs to capture the cost of various atmospheric entry hardware systems for robotic spacecraft missions (Phases B-D) • The PCEC Entry System elements are included in the spacecraft (SC) portion of the WBS, but separate from the more typical subsystems. – Thermal Protections System (TPS) is WBS 6.5.1.8 – Parachute System is WBS 6.5.1.9 – AirbaG System is WBS 6.5.1.10 Victory Solutions MIPSS Team 10 Entry System CERs Approach & Mission Set • Costs for Thermal Protection Systems (TPS), Parachutes, and Air Bag Entry System elements are not included in PCEC v2.2.1 • Costs for these items have Been derived using data from 9 missions • PCA was used to help identify technical characteristics driving costs • CERs have Been developed for Non-recurring, Recurring, and Phase BCD Total costs Victory Solutions MIPSS Team 11 Entry System CERs Thermal Protection Systems (TPS), 1 of 2 • Definition: Covers design, fabrication, and I&T for all TPS material; Includes TPS on Heat Shield, Backshell, and Parachute; Does not include structure, adhesive, or other supporting elements TPS Non-Recurring Cost (NRC) TPS Recurring Cost (RC) • Input Parameters: • Input Parameters: – PD - Peak Deceleration (g) – PD - Peak Deceleration (g) – MPS - Mean Pressure at the Surface (kPa) – HD – Heatshield Diameter (m) • Cost Estimating Relationship (CER): – HPU – Heatshield Production Units 1236 × (!")0.3761 × (#!$)−0.1847 • Cost Estimating Relationship (CER): • Adjusted R^2: 0.52 1437 × (%!&) × (!")0.2625 × (%")0.6958 • Range of Error: -51 to 73% • Adjusted R^2: 0.70 Victory Solutions MIPSS Team • Range of Error: -32 to 77% 12 Entry System CERs Thermal Protection Systems (TPS), 2 of 2 • Definition: Covers design, fabrication, and I&T for TPS material; Does not include structure, adhesive, or other supporting elements TPS – Alternate CER (NRC+RC) • Input Parameters: – PD - Peak Deceleration (g) – SEM - System Entry Mass (kg) • Cost Estimating Relationship (CER): 230 × (!")0.4459 × (#$%)0.4045 • Adjusted R^2: 0.93 • Range of Error: -26 to 26% Victory Solutions MIPSS Team 13 Entry System CERs Parachutes, 1 of 2 • Definition: Covers design, Fabrication, and I&T For the Parachute System; Includes all Flight parachutes, lines, and mortar; Does not include support structure Parachutes Non-Recurring Cost (NRC) Parachutes Recurring Cost (RC) • Input Parameters: • Input Parameters: – MPD: Main Parachute Diameter (m) – PSM - Parachute System Mass (Chutes, • Cost Estimating Relationship (CER): Mortar) (kg) 8.5 × (!"#)1.9541 – MPS - Mean Pressure at the SurFace (kPa) – PPU – Parachute Production Units • Adjusted R^2: 0.50 • Cost Estimating Relationship (CER): • Range of Error: -51 to 119% 564 × (""$) × ("%!)0.4983 × (!"%)−0.0880 • Adjusted R^2: 0.83 Victory Solutions MIPSS Team 14 • Range of Error: -36 to 32% Entry System CERs Parachutes, 2 of 2 • Definition: Covers design, fabrication, and I&T for the Parachute System; Includes all flight parachutes, lines, and mortar; Does not include support structure Parachutes – Alternate CER (NRC+RC) • Input Parameters: – MPD: Main Parachute Diameter (m) – PPU – Parachute Production Units • Cost Estimating Relationship (CER): 37 × (!"#)1.7903 × (""$)0.91 • Adjusted R^2: 0.87 • Range of Error: -42 to 44% Victory Solutions MIPSS Team 15 Entry System CERs Air Bag Deceleration Systems • Definition: Covers design, fabrication, and I&T for an Air Bag Deceleration System; Includes all air bags, and inflation system; Does not include support structure Air Bag Deceleration – CER (NRC+RC) Development Cost vs Air Bag System Mass • Input Parameters: – ASM: Airbag System Mass (kg) – APU – Airbag Production Units • Cost Estimating Relationship (CER): 6338 + (72.459 × !"# × !$%) • AdjusteD R^2: 1 • Range of Error: -15 to 3% Victory Solutions MIPSS Team 16 Milestone-Specific Analyses Background • Question: Can we correlate cost model inputs known at the start of Phase B to Actual costs (at launch)? • Cost models are typically developed by correlating technical/programmatic inputs at launch to actual costs • If CERs were developed using Phase B inputs and Actual costs, would they perform better than typical cost models at the start of Phase B? GOAL: Improve understanding of how inputs known at the start of Phase B correlate to actual costs at launch; Approach utilizes the same cost data normalization process applied to PCEC Robotic Missions and explores correlations (new CERs) and relationships between changes in cost model inputs and costs (Project & PCEC estimates) Victory Solutions MIPSS Team 17 Milestone-Specific Analyses Phase B Cost Data Normalization • Cost data representing the start of Phase B has been normalized for 24 projects (same process as used for PCEC v2.2) • Most of these projects are AO missions (and CSR data was used) • Difficult to clearly identify/collect Phase B start data for many projects Victory Solutions MIPSS Team 18 Milestone-Specific Analyses CER Results Overview Case 1 CER Results: • Use the exact same CER inputs by subsystem as the v2.2.1 CERs • Error range at the Flight System Level – CBE: -72% to 66% CBE + Contingency: -73% to 67% • CERs are oversubscribed since the number of data points used to develop the new CERs are significantly less than the PCEC v2.2 CERs (~20 vs ~40 data points) Case 2 CER Results: • Use the same CER discovery process employed during the development of the PCEC v2.2.1 CERs; different inputs allowed • Error range at the Flight System Level – CBE: -59% to 36% CBE + Contingency: -59% to 39% • Some of the inputs are counter-intuitive; These CERs should be refined before considering release Victory Solutions MIPSS Team 19 Milestone-Specific Analyses Results Summary Based on Development (BCD) $ w/o Reserves, LV, Instruments, GDS, or Science Team • Results using the ‘New Phase B CERs’ appear a little better than using PCEC v2.2 for the 24 missions used in this analysis • ‘Robustness’ of the New Phase B CERs may be questionable based on results using missions outside this 24-mission data set Victory Solutions MIPSS Team 20 Milestone-Specific Analyses Interesting CER Variable Observations • Mass remains important across all CER cases • Heritage/Parts Rating variables become more important and schedule variables become less important when comparing Case 2 CERs to the original PCEC v2.2 CERs Victory Solutions MIPSS Team 21 Milestone-Specific Analyses Cost Growth Correlations to Input Changes Schedule Growth Mass Growth Change in Heritage • Correlations between cost growth from Phase B and changes in technical and programmatic inputs were explored; however, good correlations between changes

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    40 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us