Remediation of Le Letten Waste Disposal Site

Remediation of Le Letten Waste Disposal Site

Remediation of Le Letten waste disposal site Project details Region: Alsace / France Client: HIM GmbH (On behalf of GIDRB) Involved parties: ARE Deutzen GmbH Construction period: 2011 Contract value: 4.5m EUR Work completed • Pre-treatment of 35,000 tonnes of material at the soil treatment facility in Deutzen • Thermal treatment and subsequent disposal of a total of 35,000 tonnes of excavated material Background The former Le Letten waste disposal site in Hagenthal le Bas in the Alsace region of France is around 300m from the Swiss border and Schönenbuch in the Canton Basle-Country. In the 1950s and 1960s, excavated materials, rubble and waste from the various industries were disposed of here. HIM GmbH was contracted by GIDRB to remediate the former Le Letten waste disposal site. The main focus of the work was to remove the contaminated contents of the disposal site. The heterogeneous contents of the site were classified as “mixed layer“. An estimation of the amount of “mixed layer“ materials calculated there was around 20,600 m³ (approx. 35,000 t). Preliminary testing determined that the “mixed layer“ material mostly consisted of polluted mineral materials (soil, construction and demolition waste), mixed with production waste from the chemical industry. Depending on the level of contamination, the underlying alluvial soil had to be removed and disposed of as well. The amount of material from the waste disposal site and the surrounding areas was estimated to be around 3,000 m³ (approx. 5,100 t) Remediation work HIM GmbH’s disposal concept envisioned decontaminating the “mixed layer“ material and the contaminated alluvial soil, depending on the level of pollution, at the thermal soil treatment facilities of ARE Deutzen GmbH in Neukieritzsch OT Deutzen/ Saxony, Germany. The soil, excavated by a third party, was put into containers using a lock system and then transported for thermal treatment to the ARE Deutzen GmbH facilities near Leipzig. The transportation of the material from the Le Letten waste disposal site to Deutzen was intermodal (road-rail-road) using gastight containers in accordance with acceptance limits. 35,000 tonnes of soil were delivered and pre-treated between 02/2011 and 10/2011 and this was disposed of by the end of 2011. ARE Deutzen GmbH Telephone +49 3433 2719 - 0 Fabrikstrasse 7 Telefax +49 3433 2719 - 60 D-04575 Neukieritzsch E-Mail [email protected] .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us