Social Impact Assessment 12/2008

Social Impact Assessment 12/2008

SOCIAL IMPACT ASSESSMENT 12/2008 EUROPEAN UNION REPUBLIC OF MOLDOVA FEASIBILITY STUDY FOR THE REHABILITATION AND EXTENSION OF THE ROAD M3 CHISINAU – GIURGIULESTI/ROMANIAN BORDER Europe Aid/125919/C/SER/MD Koblenz, Germany Chisinau, Moldova Road M3 Chisinau — Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Social Impact Assessment Report (December 2008) REPORT COVER PAGE Project Title: Feasibility Study for the Rehabilitation and Extension of the Road M3 Chisinau - Giurgiulesti/Romanian Border Contract Number: 2008/156-690 Countries: Republic of Moldova Name: Local Recipient EC Consultant Republic of Moldova Kocks Consult GmbH & Ministry of Transport / Universinj Ltd State Road Administration Address: Bucuriei Street 12a Chisinau MD 2004 Republic of Moldova Tel. Number: +373 22 595849 +373 22 716655 Fax Number: +373 22 744442 Contact Person: Ulrich Sprick Carsten Griese Project Director Project Manager Signatures: Date of Report: December 2008 Reporting Period: September 2008 – December 2008 Author of the Kocks Consult GMBH Report: EC M & E team ______________ ______________ _____________ [name] [signature] [date] ÉU Delegation ______________ ______________ _____________ [name] [signature] [date] ______________ ______________ _____________ [name] [signature] [date] Joint Venture Kocks Consult GmbH, Koblenz – Universinj SRL, Chisinau i Road M3 Chisinau — Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Social Impact Assessment Report (December 2008) SYNOPSIS Project Title: Feasibility Study for the Rehabilitation and Extension of the Road M3 Chisinau - Giurgiulesti/Romanian Border Project 2008/156-690 Number: Country: Republic of Moldova Project Provide a bankable technical, financial, environmental and institutional feasibility objectives: study for the rehabilitation and extension of the M3 road Chisinau-Giurgiulesti / Romanian Border. Planned • Identification of Transport Needs outputs: • Assessment of technical, environmental, financial and economic feasibility • Assessment of institutional sustainability of the road rehabilitation • Detailed Technical Surveys and Engineering Design • Coordination with International Financial Institutions • Preparation of tender documents for the rehabilitation of one or two priority sections chosen Project • Conduct of traffic surveys and traffic forecasts activities: • Technical assessment of the present infrastructure • Road condition survey • Survey of factual pavement condition • Road safety assessment (black spots) • Road maintenance standards • Present traffic management • A review of the Status of institutional development and policy reforms • Evaluation criteria based on poverty indicators for rural roads and bridges • A socio-economic analysis and environmental and social impact assessment • Cost estimates for infrastructure and maintenance costs • Economic and financial cash flow calculations • Calculation of internal rates of return and net present values • Assessment of Institutional sustainability for carrying out the necessary works and maintenance tasks • Geo-technical and topographic surveys • Soil and Materials Investigations • Preliminary Design • Detailed Drawings • Technical Specifications • Design Report • Tender documents for the rehabilitation of one or two priority sections chosen based an the Feasibility study • Road Maintenance Plan including regular and periodic maintenance • Coordination with IFIs Joint Venture Kocks Consult GmbH, Koblenz – Universinj SRL, Chisinau ii Road M3 Chisinau — Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Social Impact Assessment Report (December 2008) TABLE OF CONTENT REPORT COVER PAGE…………………………………………………………….………….i SYNOPSIS……………………………………………………………………………………….ii ACRONYMS…………………………………………………………………….……………….v 1 INTRODUCTION................................................................................................................. 1 1.1 Background.................................................................................................................. 1 1.2 Project Objectives........................................................................................................ 1 1.3 Purpose and Scope of the Social Impact Assessment ................................................. 3 2 POLICY AND REGULATORY FRAMEWORK.................................................................... 5 2.1 National Environmental Assessment and Land Acquisition Procedures - Legal and Institutional Framework of the Republic of Moldova ..................................................... 5 2.2 European Bank for Reconstruction and Development – Environmental and Social Policy........................................................................................................................... 5 2.3 World Bank Safeguard Policies....................................................................................6 2.4 Millennium Challenge Corporation – Guidelines for Environment and Social Assessment ................................................................................................................. 8 3 APPROACH AND METHODOLOGY.................................................................................. 9 3.1 Introduction.................................................................................................................. 9 3.2 Review of Literature..................................................................................................... 9 3.3 Field Investigations .................................................................................................... 10 3.4 Consultation and Stakeholder Participation................................................................ 10 4 PROJECT DESCRIPTION ................................................................................................ 11 4.1 Project Location ......................................................................................................... 11 4.2 The Project Road....................................................................................................... 11 4.3 Proposed Interventions .............................................................................................. 14 4.4 Socioeconomic and Land Acquisition Issues and Concerns....................................... 16 5 SOCIOECONOMIC CONDITIONS OF THE PROJECT AREA ......................................... 17 5.1 National Context ........................................................................................................ 17 5.1.1 Geography and Land Use ..................................................................................... 17 5.1.2 Population and Demography................................................................................. 17 5.1.3 Administrative and Institutional Structure .............................................................. 18 5.1.4 Social Infrastructure .............................................................................................. 18 5.1.5 National Economy................................................................................................. 19 5.1.6 Poverty Profile....................................................................................................... 19 5.2 Local Context............................................................................................................. 20 5.2.1 Geography, Land Use and Population................................................................... 21 6 SOCIAL DEVELOPMENT ISSUES AND PROJECT IMPACTS........................................ 24 6.1 Potential Socioeconomic Benefits .............................................................................. 24 6.2 Impacts...................................................................................................................... 24 7 CONSULTATION AND PARTICIPATION......................................................................... 33 7.1 Methods and Process ................................................................................................ 33 7.2 Stakeholders’ Issues and Concerns........................................................................... 34 7.3 Project Appreciation................................................................................................... 35 Joint Venture Kocks Consult GmbH, Koblenz – Universinj SRL, Chisinau iii Road M3 Chisinau — Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Social Impact Assessment Report (December 2008) 7.4 Suggestions and Recommendations.......................................................................... 36 8 SUMMARY OF FINDINGS AND RECOMMENDATIONS ................................................. 37 8.1 Land Acquisition and Resettlement Planning ............................................................. 37 8.2 Gender Development Plan......................................................................................... 37 8.3 Participation Strategy................................................................................................. 37 8.4 HIV/AIDS Awareness................................................................................................. 37 8.5 IDP Plan .................................................................................................................... 38 8.6 Internal Monitoring System ........................................................................................ 38 LIST OF FIGURES Figure 1: Project Location Map……………………………………………………………………….12

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    76 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us