FY15 Capital Budget

FY15 Capital Budget

FY15 Capital Budget Overview of Capital Asset Management Themes Catching up on deferred capital maintenance & replacement FY14-FY16: • buses, LRV component overhauls Older system, increased maintenance • end of life - blue line east stations, elevators, operating facilities, fare system • mid life – blue line west stations, elevators Safety and security • pedestrian crossings, blue line station rehab. • bus, LRV CCTV replacement w/ digital technology MAP-21: $6 million per year additional State of Good Repair formula funds & $3 million per year additional SGR for bus and bus 2 facilities. FY15 Capital Asset Maintenance & Replacement Budget Maintenance & Operating Capital Maintenance & Project Budget Replacement Budget millions: millions: Bus $40 Bus $31 Light Rail $35 Light Rail $4 Facilities $14 Facilities $4 ATP $ 2 ATP $4 WES $ 1 IT $6 Fare system $ 2 Safety $3 Total $94 Fare System $17 Total $69 (95% of FY15 capital budget) 3 Capital Asset Management and Improvement Program (CAMIP) Brings together operating maintenance and capital replacement Five year plan, updated annually Incorporated into financial forecast Available online: http://trimet.org/pdfs/publications/TriMet- FY15-FY19-Proposed-CAMIP.pdf 4 Light Rail Maintenance Philosophy Light rail vehicles & railway maintained in “as new condition” for life, most expense in the operating budget Vehicles: • preventive maintenance, running repairs, component rebuilds, progressive overhaul, modifications MOW: track, signals, catenary, substations: • preventive, corrective and overhaul to maintain the railway in as new condition 5 Bus Maintenance Philosophy TriMet maintains buses to operate reliable service for a 16 year life cycle. Provides optimal vehicle life and lowest cost per mile 6 FY15 Highlights Buses • 64 low floor, low Average Bus Miles Between emission, air Roadcalls w/ Lost Service conditioned buses 16,000 • Replacing 22 to 24 14,000 year old buses 12,000 10,000 • Fewer breakdowns & 8,000 MILES 7-12% better fuel 6,000 4,000 efficiency 2,000 • Goal of average fleet 0 age of 8 years by FY16 7 FY15 Highlights Rail • 2nd year of 3 year LRV component overhaul catch-up • On-going track capital maintenance $13.5 million over 5 years • Blue line station elevator refurbishment $15 million over 5 years • Platforms areas Sunset Transit Center $1.7 million • Washington Park Station finishes $2.7 million Note: in FYs13-14: 4 LRV mechanics were added for progressive overhauls & 10 were added for LRV preventive maintenance 8 Embedded track wear & water damage 30 year old embedded track in downtown Portland 9 Sunset Transit Center Platform Areas 10 Washington Park Station 11 Robertson Tunnel & Marienplatz Station Munich 12 Safety • Blue line station rehabilitation $12.5 million over 5 years • Bus and LRV CCTV replacement $7.5 million over 5 years • Real time GPS location technology for LRVs to eliminate Control Center “blind spots” $1.2 million • WES Positive Train Control mandate $8.5 million 13 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us