District Taluk Gram Panchayat Year Work Name Type of Building

District Taluk Gram Panchayat Year Work Name Type of Building

Estimated Expenditure For District Taluk Gram Panchayat Year Work Name Type Of Building Expenditure Work status Amount SC/ST Chikkaballapura Bagepalli Billur 2006-07 Expenditure on Literacy Programme IEC 35000 35000 0 Completed Chikkaballapura Bagepalli Billur 2006-07 Constrcution of Godowns at Billur A.N.M Hostel to Panhath Building Construction of Gram Panchayat332000 Building 332000 0 Completed Chikkaballapura Bagepalli Billur 2006-07 Constrcution of Toilets at Billur Village Beside Veterinay Hospital Construction of Toilet 200000 200000 200000 Completed Chikkaballapura Bagepalli Billur 2007-08 I.E.C Programme at Billur IEC 85000 85000 0 Completed Chikkaballapura Bagepalli Billur 2007-08 Construction of Toilets Beside Vaternery Hospital at Billur Village Construction of Toilet 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2007-08 Constrcution of Hostel for A.N.M(Health) and Provision Stores at Billur Gram Panchayath Construction of Gram Panchayat393000 Building 393000 0 Completed Chikkaballapura Bagepalli Billur 2007-08 Constrcution of Provision Stores Beside A.N.M(Health) Panchayath other works 194000 194000 194000 Completed Chikkaballapura Bagepalli Billur 2008-09 I.E.C Programme IEC 16000 24000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Pending Toilet work at Billuru village from Behind the Veternary Hospital Construction of Toilet 30000 30000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Electronic Work at Billuru Gram Panchayath in Stores Construction of Gram Panchayat65000 Building 65000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Building Repair work ar Vyangyarlapalli Village in Anganavadi Building Repair 70000 70000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 L.Shape Drainage work at Kothuru Village from Behind the Hand bour Drainage 80000 80000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Cement Road work at Gorlavandlapalli Village from Narayana House to Nanjunadappa House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Cement road work at vyangyarlapalli Village from Chandrappa House to Rajareddy House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Pending Stores Work at Billuru Gram Panchayath from Behind the A.N.M.Hostel Construction of Gram Panchayat100000 Building 100000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 L.Shape Drainage work at Bandarlapalli Village from Dakku Venkataswamy House to Milk Dairy Drainage 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Construction of L.P.G.School Compound at Yaraganapalli Village Compound wall 70000 70000 70000 Completed Chikkaballapura Bagepalli Billur 2008-09 Cement Road work at Boyipalli village from Srirama Temple to Gandamvaripalli Village road CC Road 140000 140000 140000 Completed Chikkaballapura Bagepalli Billur 2008-09 Construction of drainage at Babenayakanapalli Village Drainage 150000 150000 150000 Completed Chikkaballapura Bagepalli Billur 2009-10 Construction of School Compound at Yerraganapalli L.P.S School Compound wall 50000 50000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Drainage work at Suryanarayanareddy House to Bhadrappa House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Expenditure on Literacy Programme IEC 73000 73000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Bandakindapalli Kuruva Erappa House to Temple Road CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Bandarlapalli Motherbee House to Phkruddhin House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Mallepalli Narayanreddy House to Nanjireddy House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Ugranampalli Yamanna House to Antarappa House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Billur A.K. Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Babenayakanapalli Egavathanda, Tippenaik House to Subbenaik House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Boyipalli Govindappa House to Pattalaramanna House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Billur Village infront of Padmamma House CC Road 40000 0 0 Not Started Cement Road work at Ghoravandlapalli Village from Rangappa House to chikkanarasimhappa Chikkaballapura Bagepalli Billur 2010-11 CC Road 40000 0 0 Not Started House Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Mallepalli Village Infront of Nanjireddy House CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Pending stores Work at Billur Gram Panchayath Construction of Gram Panchayat40000 Building 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Drainage work at Babenaikanahalli Village from Narasimhanaik House to Ramaswamy House Drainage 40000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Drainage work at Yarraganapalli Village Drainage 40000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 I.E.C Programme Purpose IEC 47000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Billur Village from Y.Venkataravana House to Anganavadi CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Vyanngyarlapalli Village from Temple to Shivareddy House CC Road 80000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Drainage work at billur Village from Kalil Sab House to Bashasab House Drainage 80000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Boyipalli Village from Narasimhappa House to Nareppa House CC Road 120000 0 0 Not Started Chikkaballapura Bagepalli Chakavelu 2006-07 Cement Road Work at Buddalavaripalli Village in S.C Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Chakavelu 2007-08 Construction of Anganavadi building at Buddalavaripalli Village Anganavadi building 50000 50000 0 Completed Cement Road work at Chakvelu Village from E.V.venkataravanappa House To ku||Kasirappa Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 50000 50000 0 Completed House Cement Road work at Papireddypalli Village From Balareddy Narasimhappa House to Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 50000 50000 0 Completed Ku||Ravanappa House Cement Road work at R.Nallagutlapalli Village From Garollanarayanappa House To Thalari Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 50000 50000 0 Completed Narasimhappa House Cement Road work at venkatareddypalli Village From Venkatareddy House To venkatarayappa Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 100000 100000 0 Completed House Cement Road work at Kondamvaripalli Village From S.C.Colony Yallappa House To Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 50000 50000 50000 Completed venkataravanappa House Chikkaballapura Bagepalli Chakavelu 2007-08 Cement Road work at Maddireddy Village from Balanamori to Nagenaik House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Chakavelu 2008-09 Construction of Anganavadi Building at Buddalavripalli Anganavadi building 60000 60000 0 Completed Chikkaballapura Bagepalli Chakavelu 2008-09 Cement Road work at R.Nallagutlpalli Village From Shanthamma house to Narasamma House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Chakavelu 2008-09 Cement Road work at Dasarivandlappali Village from Shankarappa house to Narasamma House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Chakavelu 2008-09 Cement Road work at Maddireddypalli Village CC Road 60000 60000 0 Completed Cement Road work at Vaddivandlapalli Village from Venkatravanappa House to Narasimhappa Chikkaballapura Bagepalli Chakavelu 2008-09 CC Road 60000 60000 0 Completed house Cement Road work at Vaddivandlapalli Village from Narasimhappa House to Store Narasimhappa Chikkaballapura Bagepalli Chakavelu 2008-09 CC Road 50000 50000 50000 Completed house Cement Road work at Venkatareddypalli thanda Village from Somlanaik house to Nagenaik Chikkaballapura Bagepalli Chakavelu 2008-09 CC Road 60000 60000 60000 Completed House Chikkaballapura Bagepalli Chakavelu 2008-09 Construction of B.C.M Hostel Gate at Chakvel Village Compound wall 60000 60000 60000 Completed Chikkaballapura Bagepalli Chakavelu 2009-10 Construction of Water Tank and Pipeline Work at Chakvel Village from B.C.M Hostel Pipeline 30000 30000 0 Completed Cement Road work at DasirivandlapalliVillage from Raghupathi House to Kongi Narasamma Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed House Cement Road work at Kondavaripalli Village from Mutturayappa House to Totti Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed Venkatravanappa House Chikkaballapura Bagepalli Chakavelu 2009-10 Cement Road work at Kottur Village from T.K. Venkatravanappa House to Tmeple CC Road 50000 50000 0 Completed Cement Road work at Maravapalli Village from Sakela Venkatravanappa House to Govindagowda Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed House Cement Road work at Papireddypalli Village from Guvvala Venkatramanna House to Balareddy Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed Narasimhappa House Cement Road work at R. Nallgutlapalli Village from Phakruddhinsaab House to Narasimhappa Chikkaballapura Bagepalli Chakavelu 2009-10

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us