Estimated Expenditure For District Taluk Gram Panchayat Year Work Name Type Of Building Expenditure Work status Amount SC/ST Chikkaballapura Billur 2006-07 Expenditure on Literacy Programme IEC 35000 35000 0 Completed Chikkaballapura Bagepalli Billur 2006-07 Constrcution of Godowns at Billur A.N.M Hostel to Panhath Building Construction of Gram Panchayat332000 Building 332000 0 Completed Chikkaballapura Bagepalli Billur 2006-07 Constrcution of Toilets at Billur Village Beside Veterinay Hospital Construction of Toilet 200000 200000 200000 Completed Chikkaballapura Bagepalli Billur 2007-08 I.E.C Programme at Billur IEC 85000 85000 0 Completed Chikkaballapura Bagepalli Billur 2007-08 Construction of Toilets Beside Vaternery Hospital at Billur Village Construction of Toilet 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2007-08 Constrcution of Hostel for A.N.M(Health) and Provision Stores at Billur Gram Panchayath Construction of Gram Panchayat393000 Building 393000 0 Completed Chikkaballapura Bagepalli Billur 2007-08 Constrcution of Provision Stores Beside A.N.M(Health) Panchayath other works 194000 194000 194000 Completed Chikkaballapura Bagepalli Billur 2008-09 I.E.C Programme IEC 16000 24000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Pending Toilet work at Billuru village from Behind the Veternary Hospital Construction of Toilet 30000 30000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Electronic Work at Billuru Gram Panchayath in Stores Construction of Gram Panchayat65000 Building 65000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Building Repair work ar Vyangyarlapalli Village in Anganavadi Building Repair 70000 70000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 L.Shape Drainage work at Kothuru Village from Behind the Hand bour Drainage 80000 80000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Cement Road work at Gorlavandlapalli Village from Narayana House to Nanjunadappa House CC Road 100000 100000 0 Completed

Chikkaballapura Bagepalli Billur 2008-09 Cement road work at vyangyarlapalli Village from Chandrappa House to Rajareddy House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Pending Stores Work at Billuru Gram Panchayath from Behind the A.N.M.Hostel Construction of Gram Panchayat100000 Building 100000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 L.Shape Drainage work at Bandarlapalli Village from Dakku Venkataswamy House to Milk Dairy Drainage 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2008-09 Construction of L.P.G.School Compound at Yaraganapalli Village Compound wall 70000 70000 70000 Completed Chikkaballapura Bagepalli Billur 2008-09 Cement Road work at Boyipalli village from Srirama Temple to Gandamvaripalli Village road CC Road 140000 140000 140000 Completed Chikkaballapura Bagepalli Billur 2008-09 Construction of drainage at Babenayakanapalli Village Drainage 150000 150000 150000 Completed Chikkaballapura Bagepalli Billur 2009-10 Construction of School Compound at Yerraganapalli L.P.S School Compound wall 50000 50000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Drainage work at Suryanarayanareddy House to Bhadrappa House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Expenditure on Literacy Programme IEC 73000 73000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Bandakindapalli Kuruva Erappa House to Temple Road CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Bandarlapalli Motherbee House to Phkruddhin House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Mallepalli Narayanreddy House to Nanjireddy House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Ugranampalli Yamanna House to Antarappa House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Billur A.K. Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Babenayakanapalli Egavathanda, Tippenaik House to Subbenaik House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Billur 2009-10 Cement Road work at Boyipalli Govindappa House to Pattalaramanna House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Billur Village infront of Padmamma House CC Road 40000 0 0 Not Started Cement Road work at Ghoravandlapalli Village from Rangappa House to chikkanarasimhappa Chikkaballapura Bagepalli Billur 2010-11 CC Road 40000 0 0 Not Started House Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Mallepalli Village Infront of Nanjireddy House CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Pending stores Work at Billur Gram Panchayath Construction of Gram Panchayat40000 Building 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Drainage work at Babenaikanahalli Village from Narasimhanaik House to Ramaswamy House Drainage 40000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Drainage work at Yarraganapalli Village Drainage 40000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 I.E.C Programme Purpose IEC 47000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Billur Village from Y.Venkataravana House to Anganavadi CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Vyanngyarlapalli Village from Temple to Shivareddy House CC Road 80000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Drainage work at billur Village from Kalil Sab House to Bashasab House Drainage 80000 0 0 Not Started Chikkaballapura Bagepalli Billur 2010-11 Cement Road work at Boyipalli Village from Narasimhappa House to Nareppa House CC Road 120000 0 0 Not Started Chikkaballapura Bagepalli Chakavelu 2006-07 Cement Road Work at Buddalavaripalli Village in S.C Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Chakavelu 2007-08 Construction of Anganavadi building at Buddalavaripalli Village Anganavadi building 50000 50000 0 Completed Cement Road work at Chakvelu Village from E.V.venkataravanappa House To ku||Kasirappa Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 50000 50000 0 Completed House Cement Road work at Papireddypalli Village From Balareddy Narasimhappa House to Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 50000 50000 0 Completed Ku||Ravanappa House Cement Road work at R.Nallagutlapalli Village From Garollanarayanappa House To Thalari Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 50000 50000 0 Completed Narasimhappa House Cement Road work at venkatareddypalli Village From Venkatareddy House To venkatarayappa Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 100000 100000 0 Completed House Cement Road work at Kondamvaripalli Village From S.C.Colony Yallappa House To Chikkaballapura Bagepalli Chakavelu 2007-08 CC Road 50000 50000 50000 Completed venkataravanappa House Chikkaballapura Bagepalli Chakavelu 2007-08 Cement Road work at Maddireddy Village from Balanamori to Nagenaik House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Chakavelu 2008-09 Construction of Anganavadi Building at Buddalavripalli Anganavadi building 60000 60000 0 Completed Chikkaballapura Bagepalli Chakavelu 2008-09 Cement Road work at R.Nallagutlpalli Village From Shanthamma house to Narasamma House CC Road 60000 60000 0 Completed

Chikkaballapura Bagepalli Chakavelu 2008-09 Cement Road work at Dasarivandlappali Village from Shankarappa house to Narasamma House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Chakavelu 2008-09 Cement Road work at Maddireddypalli Village CC Road 60000 60000 0 Completed Cement Road work at Vaddivandlapalli Village from Venkatravanappa House to Narasimhappa Chikkaballapura Bagepalli Chakavelu 2008-09 CC Road 60000 60000 0 Completed house Cement Road work at Vaddivandlapalli Village from Narasimhappa House to Store Narasimhappa Chikkaballapura Bagepalli Chakavelu 2008-09 CC Road 50000 50000 50000 Completed house Cement Road work at Venkatareddypalli thanda Village from Somlanaik house to Nagenaik Chikkaballapura Bagepalli Chakavelu 2008-09 CC Road 60000 60000 60000 Completed House Chikkaballapura Bagepalli Chakavelu 2008-09 Construction of B.C.M Hostel Gate at Chakvel Village Compound wall 60000 60000 60000 Completed Chikkaballapura Bagepalli Chakavelu 2009-10 Construction of Water Tank and Pipeline Work at Chakvel Village from B.C.M Hostel Pipeline 30000 30000 0 Completed Cement Road work at DasirivandlapalliVillage from Raghupathi House to Kongi Narasamma Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed House Cement Road work at Kondavaripalli Village from Mutturayappa House to Totti Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed Venkatravanappa House Chikkaballapura Bagepalli Chakavelu 2009-10 Cement Road work at Kottur Village from T.K. Venkatravanappa House to Tmeple CC Road 50000 50000 0 Completed Cement Road work at Maravapalli Village from Sakela Venkatravanappa House to Govindagowda Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed House Cement Road work at Papireddypalli Village from Guvvala Venkatramanna House to Balareddy Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed Narasimhappa House Cement Road work at R. Nallgutlapalli Village from Phakruddhinsaab House to Narasimhappa Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed House Cement Road work at Rajuvandlapalli Village from Uyyala Venkatravanappa House to Kottolla Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 0 Completed Venkatravanappa House Chikkaballapura Bagepalli Chakavelu 2009-10 Cement Road work at Vaddivandlapalli Village from Lakshmipathi House to Adireddy House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Chakavelu 2009-10 Construction of Mesentri Drainage at Chakvel Village from Amaranarayanswai House Drainage 50000 50000 0 Completed Cement Road work at Maravapalli Village from Gejjala Venkatravanappa House to Sakala Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 60000 60000 0 Completed Nandeppa Hpuse Chikkaballapura Bagepalli Chakavelu 2009-10 Expditure on Literacy Programme IEC 67000 67000 0 Completed Construction of Water Tank and Raod Work at Digavapyayalavaripalli Village from Chinna Chikkaballapura Bagepalli Chakavelu 2009-10 Water Tank 70000 70000 0 Completed Bayyappa House Chikkaballapura Bagepalli Chakavelu 2009-10 Cement Road work at Kondamvaripalli Village from Subbarayappa House top Yallappa House CC Road 50000 50000 50000 Completed Cement Road work at Paireddypalli Village from A.D. Colony Uttamma House to Chinna Chikkaballapura Bagepalli Chakavelu 2009-10 CC Road 50000 50000 50000 Completed Narasimhappa House Chikkaballapura Bagepalli Chakavelu 2009-10 Cement Road work at Venkatreddypalli Thanda Sakkarenaik House to Bhimle Naik House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Chakavelu 2009-10 Construction of Mesentri Drainage at Chakvel Village from Navodaya School Drainage 50000 50000 50000 Completed Chikkaballapura Bagepalli Chakavelu 2010-11 I.E.C Programme IEC 21000 0 0 Not Started Chikkaballapura Bagepalli Chakavelu 2010-11 Box Type Drainage at Papireddypalli Village from Besaid venkatareddy house Village Road Said Drainage 38000 0 0 Not Started Chikkaballapura Bagepalli Chakavelu 2010-11 Cement Road Work at Vaddivandlapalli Village from Nagamma House to Temple Said CC Road 38000 0 0 Not Started Chikkaballapura Bagepalli Chakavelu 2010-11 Cement Road Work at Dasirivandlapalli Village from Dasari Subbarayappa House to Street Said CC Road 38000 0 0 Not Started Chikkaballapura Bagepalli Chakavelu 2010-11 Cement Road Work at Maddireddypalli Village from Reddappa House to Anganavdi CC Road 38000 0 0 Not Started Cement Road Work at Yagavapyayalapalli Village from S.C.Colony From Besaid Cheemannagari Chikkaballapura Bagepalli Chakavelu 2010-11 CC Road 38000 0 0 Not Started Gangulappa House Drainage Work at Rajavandlapalli Village from Venkataravanappa House to Chikkaballapura Bagepalli Chakavelu 2010-11 Drainage 38000 0 0 Not Started Chinnavenkatravanappa House Drainage Work at Kondamvaripalli Village from kondamvaripalli Village road to Bhajanthry Chikkaballapura Bagepalli Chakavelu 2010-11 Drainage 38000 0 0 Not Started Narayanaswamy House Said Chikkaballapura Bagepalli Chakavelu 2010-11 Plasting Work at Buddalavaripalli Village from Stores other works 38000 0 0 Not Started Chikkaballapura Bagepalli Chakavelu 2010-11 Pipeline and Water Tank Work at Papireddypalli Village from Well Said Pipeline 38000 0 0 Not Started Construction of Pipe line and Water Tank work at Venkatareddythanda from Peddabaddenaik Chikkaballapura Bagepalli Chakavelu 2010-11 Water Tank 38000 0 0 Not Started house to Sriram Temple Chikkaballapura Bagepalli Chakavelu 2010-11 Cement Road Work at R.Nallagutlapalli Village From Venkataravanappa house to husenbi House CC Road 48000 0 0 Not Started Pipe line work ar Chakvel village from Maddyreddypalli Road to Miny Water Suply Project Well Chikkaballapura Bagepalli Chakavelu 2010-11 CC Road 76000 0 0 Not Started Said Chikkaballapura Bagepalli Chakavelu 2010-11 Drainage Work at Chakvel Village from 1st Block Sanjeevayya house to husen Khan House Drainage 76000 0 0 Not Started Cement Road Work at Village from 1st Block Rajamma House to Bettakonda Rasulkhan Chikkaballapura Bagepalli Chelur 2006-07 CC Road 50000 50000 0 Completed House Cement Road Work at Chelur Village from 3rd Block to Gandla Narayanappa House to Chikkaballapura Bagepalli Chelur 2006-07 CC Road 50000 50000 0 Completed Narasimhappa House Chikkaballapura Bagepalli Chelur 2006-07 Cement Road Work at Daravaripalli Village from Krishnareddy House to Subbarayappa House CC Road 50000 50000 0 Completed

Chikkaballapura Bagepalli Chelur 2006-07 Cement Road Work at Pathuru Village from Narayanswamy House to Thimmanna House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Chelur 2006-07 Construction of Computer Room at Chelur Gram Panchayath Construction of Gram Panchayat50000 Building 50000 0 Completed Drainage work at Chelur Village from 1st Block from Driver Maboo House to Kottampalli Chikkaballapura Bagepalli Chelur 2006-07 Drainage 50000 50000 0 Completed Narayanappa House Chikkaballapura Bagepalli Chelur 2006-07 Drainage work at Chelur Village 3rd Block Venktappa House to Jeevan Master House Drainage 100000 100000 0 Completed Cement Road Work at Chelur Village from 2nd Block Venkatravanappa House to Chinnappa Chikkaballapura Bagepalli Chelur 2006-07 CC Road 50000 50000 50000 Completed House Cement Road Work at Village from Bandaru Muniyappa House to Venkatramana Chikkaballapura Bagepalli Chelur 2006-07 CC Road 50000 50000 50000 Completed House Drainage Work at Chelur Village from Second Block Bodanna House to Driver Venkataramapa Chikkaballapura Bagepalli Chelur 2007-08 Drainage 30000 30000 0 Completed House Cement road work at Chelur Village from Second Block M.N. Narasimhareddy House to Chikkaballapura Bagepalli Chelur 2007-08 CC Road 40000 40000 0 Completed Anwarsaab House Cement road work at Chelur Village From Second Block T.D. Shankarayya House to B. Gopala Chikkaballapura Bagepalli Chelur 2007-08 CC Road 50000 50000 0 Completed House Cement road work at Hosahudya Village from Bomme Chowdappa House to gummishetty Chikkaballapura Bagepalli Chelur 2007-08 CC Road 60000 60000 0 Completed Srinivas House Chikkaballapura Bagepalli Chelur 2007-08 Cement road work at Byrappanahalli Village from V. Muneppareddy House to Water Tank CC Road 80000 80000 0 Completed Cement road work at Hosahudya Village From Masthan Bayyappa House to Chinna Veeranna Chikkaballapura Bagepalli Chelur 2007-08 CC Road 80000 80000 0 Completed House Chikkaballapura Bagepalli Chelur 2007-08 Drainage Work at Chelur Village from Agasara Venkatramanappa House to Jeevan Master House Drainage 120000 120000 0 Completed Cement road work at Chelur Second Block from Srirampura Venkatanarayanapa House V.N. Chikkaballapura Bagepalli Chelur 2007-08 CC Road 50000 50000 50000 Completed Rasool Saab House Cement road work at Chelur Village from Second Block Y. Ramachandra House to Chikkaballapura Bagepalli Chelur 2007-08 CC Road 60000 60000 60000 Completed Kammacheruvu Redappa House Chikkaballapura Bagepalli Chelur 2007-08 Cement road work at Pathur Village Tippanna House to Subbarayappa House CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Chelur 2007-08 Cement road work at Nimmakayalapalli Village from Sarojamma House to Golla Erappa House CC Road 70000 70000 70000 Completed Cement road work at Chelur Village from Second Block Muniswamishetty house to Chakkali Chikkaballapura Bagepalli Chelur 2007-08 CC Road 120000 120000 120000 Completed imamsaab House Chikkaballapura Bagepalli Chelur 2008-09 Drainage Work at Chelur Village from bus sheltre Drainage 40000 40000 0 Completed Chikkaballapura Bagepalli Chelur 2008-09 Building Repair Work at Chelur Gram Panchayath Builsing Building Repair 92000 92000 0 Completed Cement Road work at Chelur Village 1st block Muslim Colony from Imam Sab House to Rajamma Chikkaballapura Bagepalli Chelur 2008-09 CC Road 150000 150000 0 Completed house Chikkaballapura Bagepalli Chelur 2008-09 Cement Road work at Gerigireddypalya Village from Lakshminarasamma House to Water tank CC Road 150000 150000 0 Completed Cement Road work at Sherkhankote Village From Lakshmidevamma House to Raguttapalli Chikkaballapura Bagepalli Chelur 2008-09 CC Road 150000 150000 0 Completed Venkatrayappa House Chikkaballapura Bagepalli Chelur 2008-09 Darinage Work at Chelur Village from 2nd block Drainage 170000 170000 0 Completed Cement Road work at Chelur village 3rd block A.K.Colony From teacher Gangulappa house to Chikkaballapura Bagepalli Chelur 2008-09 CC Road 40000 40000 40000 Completed Kothurupalli House Cement Road work at Chelur Village from 3rd block Kasturappa House to Manegalla Gangulappa Chikkaballapura Bagepalli Chelur 2008-09 CC Road 70000 70000 70000 Completed House Chikkaballapura Bagepalli Chelur 2008-09 Cement Road work at Daravaripalli Village from Srirama Temple to C.B.Rayaiha House CC Road 150000 150000 150000 Completed Chikkaballapura Bagepalli Chelur 2009-10 Cement Road work at Patur Village from Gengireddypalli House to Venugopalareddy House CC Road 30000 30000 0 Completed Cement Road work at Nimmakayalapalli Village from Sarojamma House to Avula Maddireddy Chikkaballapura Bagepalli Chelur 2009-10 CC Road 50000 50000 0 Completed House Cement Road work at Chelur Village from 2nd Block R, Subramanyam Ayyar House to Kandukur Chikkaballapura Bagepalli Chelur 2009-10 CC Road 90000 90000 0 Completed Road Chikkaballapura Bagepalli Chelur 2009-10 Cement Road work at Hosahudya Village from Main Road to Pedda Narasappp House CC Road 90000 90000 0 Completed Constrcution of Compound and Gate at Chelur Village from Old Panchaythi Building(Old Police Chikkaballapura Bagepalli Chelur 2009-10 Compound wall 90000 90000 0 Completed Station) Chikkaballapura Bagepalli Chelur 2009-10 Cement Road work at Chelur Village from 2nd Block from Abulappa House to Wate Tank CC Road 100000 100000 0 Completed

Chikkaballapura Bagepalli Chelur 2009-10 Cement Road work at Chelur Village from 21st Block Babusaab House to Botu Saab House CC Road 120000 120000 0 Completed

Chikkaballapura Bagepalli Chelur 2009-10 Drainage work at Gengireddypalaya Village from Water Tank ato Avula Tippanna House Drainage 30000 30000 30000 Completed Chikkaballapura Bagepalli Chelur 2009-10 Cement Road work at Sherkhankote Village from School to P.Narasimhappa House CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Chelur 2009-10 Cement Road work at Gemgireddypalaya Village from Bhovi Eshwappa House to Pullappa House CC Road 50000 50000 90000 Completed Cement Road work at Hosahudya Village from Bhovi Venkatrayappa House to Chikkaballapura Bagepalli Chelur 2009-10 CC Road 90000 90000 90000 Completed Lakshminarasamma House Chikkaballapura Bagepalli Chelur 2010-11 Cement road work at Chelur Village from 1st Block Mumthaj house to Jaheerkhan House CC Road 30000 0 0 Not Started Cement road work at Chelur Village from Ambedkar Colony Venkatamma House to Chikkaballapura Bagepalli Chelur 2010-11 CC Road 30000 0 0 Not Started Udathala Narasimhappa House Cement road and Draine work at Sherkhankote Village from S.T.Colony Lakshmana House to Chikkaballapura Bagepalli Chelur 2010-11 CC Road and Drainage 60000 0 0 Not Started Billa Bayyappa House Cement road work at Daravaripalli Village from K.Marappareddy House to K.Venkatayappa Chikkaballapura Bagepalli Chelur 2010-11 CC Road 60000 0 0 Not Started House Chikkaballapura Bagepalli Chelur 2010-11 Drainage Work at Chelur Villlage infront School Drainage 60000 0 0 Not Started Cement road work at Hosahudya Village from Chinthamani road to S.T.Colony Thalary Kadirappa Chikkaballapura Bagepalli Chelur 2010-11 CC Road 67000 0 0 Not Started House Cement road work at Chelur Village From 1st Block Shanthi Nagara Mahaboob Sab house to Chikkaballapura Bagepalli Chelur 2010-11 CC Road 90000 0 0 Not Started Venkataramaiha House Cement road work at Chelur Village from 3rd block Subbarayappa House to M.Gangadhara Chikkaballapura Bagepalli Chelur 2010-11 CC Road 90000 0 0 Not Started House Draine and Cement road work at Chelur Village from besaid of 2nd Block Police Bagepalli Main Chikkaballapura Bagepalli Chelur 2010-11 CC Road and Drainage 120000 0 0 Not Started road to Kurakula Narayana House Chikkaballapura Bagepalli Devaragudipally 2006-07 Cement Road at Motakapalli Village from Chennaramappa House CC Road 30000 30000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2006-07 Cement Road at Nallasanampalli Village from Venkatashivareddy house to Temple CC Road 81000 81000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2006-07 Nallapareddypalli Gram Panchayath Building Work Construction of Gram Panchayat150000 Building 150000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2006-07 Cement Road at Chennarayanapalli Village near Maramma Temple CC Road 81000 81000 81000 Completed Chikkaballapura Bagepalli Devaragudipally 2006-07 Cement Road at Malachinnepalli Village near sappalamma Temple CC Road 81000 81000 81000 Completed Chikkaballapura Bagepalli Devaragudipally 2006-07 Installation of Sodium Lights at Devaragudipali Village Panchayath Solar System 600000 600000 200000 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement Road at Motakapalli Village Near M.Shankarareddy House CC Road 47000 47000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement road work at Jinkapalli Village from Ramappa House to Adeppa House CC Road 50000 50000 0 Completed Cement road work at Kammaravaripalli Village from Kondappa House to Peddavenkatrayappa Chikkaballapura Bagepalli Devaragudipally 2007-08 CC Road 50000 50000 0 Completed House Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement road work at Parashuramanapalli Village from Karkurappa House to Ashwathappa House CC Road 50000 50000 0 Completed

Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement road work at Peddatunkepalli Village from jayaramireddy house to Karkoorappa House CC Road 50000 50000 0 Completed Cement road work at Sadlavaripalli Village from Timmanna House to Angadi Venkatrayappa Chikkaballapura Bagepalli Devaragudipally 2007-08 CC Road 50000 50000 0 Completed House Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement Road at Motakapalli Village Near Venkatashivareddy House CC Road 63000 63000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement Road from Shivareddy House to Temple Bajar at Malakacheruvupalli Village CC Road 71000 71000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement road work at Devaragudipalli Village from Jayaramireddy House to Kondappa House CC Road 100000 100000 0 Completed

Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement road work at Kadirannagaripalli Village from Rajendra House to Shankachari House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement road work at Kondavaripalli Village infront of Srirama Temple CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement Road at Nallapareddypalli Village From Papireddy House to Srinivasareddy House CC Road 141000 141000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement Road from Maramma temple at Channarayanapalli Village CC Road 141000 141000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement road work at Mallasandara Village from Kullayappa House to Gangarajappa House CC Road 200000 200000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Anganavadi Compound Work at Channarayanapalli Village Compound wall 50000 50000 50000 Completed Undergound Drainage at Makireddypalli Village Nanjundappa House to Adinarayanaswami Chikkaballapura Bagepalli Devaragudipally 2007-08 Drainage 50000 50000 50000 Completed House Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement Road at Jilajirlu Village from Narappagari Lakshmayya House CC Road 54000 54000 54000 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Cement road work at Karkur Village from Gundu Narayanappa House to Srirama Temple CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Devaragudipally 2007-08 Drainage Work at M.Charlopalli Village From Srirama Temple To Main Road Drainage 71000 71000 71000 Completed Cement road work at Gundlapalli Village from A.K. Colony Venkatrayappa House to Kuruvapalli Chikkaballapura Bagepalli Devaragudipally 2007-08 CC Road 100000 100000 100000 Completed Venkatayappa House Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Jilakarapalli Village from Vaddi Adeppa House to Ramalingareddy House CC Road 50000 50000 0 Completed Cement road work at Kammaravaripalli Village from Peddavenkataravanappa House to Chikkaballapura Bagepalli Devaragudipally 2008-09 CC Road 50000 50000 0 Completed Ashwathappa House Cement road work at Karukuru Village from Bommanna son Venkateshappa House to Chikkaballapura Bagepalli Devaragudipally 2008-09 CC Road 50000 50000 0 Completed Sriramareddy House Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Karukuru Village from Srirama House to Myakala venkaramappa House CC Road 50000 50000 0 Completed

Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Kondamvaripalli Village from Rangamma House Subramani House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Makireddypalli village CC Road 50000 50000 0 Completed Cement road work at Village from Kamsala Venkaramappa house to Sanjeevareddy Chikkaballapura Bagepalli Devaragudipally 2008-09 CC Road 50000 50000 0 Completed House Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Muddalapalli Village Nethyreddy House to Murthalappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Parashuramanapalli Village from Systen To Gangulappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Parashuramanapalli Village from Temple To Bestha Krishnappa House CC Road 50000 50000 0 Completed

Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Peddathunkepalli Village from Krishnareddy House Jayaramireddy House CC Road 50000 50000 0 Completed L.Shape drainage at Kondamvaripalli Village from Ramanjinappa House to Chikkaballapura Bagepalli Devaragudipally 2008-09 Drainage 50000 50000 0 Completed Su||Venkataravanappa House Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement Road work at Jilajirlu Village from Ramireddy house to Gangireddy House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2008-09 Drainage work at Malakacheruvupalli Village from narayanappa House Drainage 60000 60000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement Road work at Jilajirlu Village from Gangireddy House to Narasimhappa House CC Road 94000 94000 0 Completed Cement road work at Devaragudipalli Village from Shivaramareddy House to Tailer Chikkaballapura Bagepalli Devaragudipally 2008-09 CC Road 100000 100000 0 Completed Venkataravanappa House Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Mallasandra Village from Sanjeevareddy House to Oblappa House CC Road 100000 100000 0 Completed Cement Road work at Motakapalli Village rom anganavadi Shivareddy house to Nanjireddy Chikkaballapura Bagepalli Devaragudipally 2008-09 CC Road 110000 110000 0 Completed House Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement road work at Kadirannagaripalli Village from Chinnavenkataravanappa House CC Road 130000 130000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement Road work at Nallapareddypalli Village from Gowramma house to N.Krishnappa House CC Road 180000 180000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2008-09 Construction of anganavadi Building at Motakapalli Village Anganavadi building 297000 297000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement Road work at Chinnepalli Village S.T.Colony infront of Nanjundappa House CC Road 60000 60000 60000 Completed Cement road work at Sadlavaripalli Village from S.C.Colony Store Venkatappa House to Chikkaballapura Bagepalli Devaragudipally 2008-09 CC Road 80000 80000 80000 Completed Pillagangappa House Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement Road work at Channarayanapalli Village from Maramma Temple to Bhovi Colony Road CC Road 100000 100000 100000 Completed Cement road work at Gundlapalli Village from G.M.Nagraju House to Venkatalakshmamma Chikkaballapura Bagepalli Devaragudipally 2008-09 CC Road 100000 100000 100000 Completed House Chikkaballapura Bagepalli Devaragudipally 2008-09 Cement Road work at jilajirlu from S.T.Colony infront of Kotlapalli Narasimhappa House CC Road 100000 100000 100000 Completed Cement Road work and Drainage at channarayanapalli Village from S.C.Colony Infront of Chikkaballapura Bagepalli Devaragudipally 2008-09 CC Road 120000 120000 120000 Completed Balapppagari Krishnappa House Chikkaballapura Bagepalli Devaragudipally 2009-10 Construction of Compound in Nallapareddypalli Village from Water Tank Water Tank 30000 0 0 Not Started Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at M.Cherlopalli Village from Korachi Venkateshappa House CC Road 55000 0 0 Not Started Cement Road work at Nallapareddypalli Village from Chennakeshava Temple to Subbappa Chikkaballapura Bagepalli Devaragudipally 2009-10 CC Road 55000 0 0 Not Started Swamy House Chikkaballapura Bagepalli Devaragudipally 2009-10 Drainage work at Kapuchinnepalli Village from Yarrappa House Drainage 55000 0 0 Not Started Chikkaballapura Bagepalli Devaragudipally 2009-10 Pipeline Work at Malakacheruvupalli Village from Borewell Pipeline 55000 0 0 Not Started Chikkaballapura Bagepalli Devaragudipally 2009-10 Expenditure on Literacy Programme IEC 100000 0 0 Not Started Cement Road work at Nallapareddypalli Village from A.N.M Quartres to Lingala Narayanappa Chikkaballapura Bagepalli Devaragudipally 2009-10 CC Road 110000 0 0 Not Started House Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at JilakarapalliRamappa House to Ramalingareddy House CC Road 35000 35000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Kondamvaripalli Subramanyam House to Anjinappa House CC Road 35000 35000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Drainage at Madireddypalli Venkateshappa House to Old Tank Drainage 35000 35000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Expenditure on Literacy Programme IEC 39000 39000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Parashuramanahalli Nanjundappa House to Beerappa House CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Sadlavaripalli Prabhakareddy House to Srinivasareddy House CC Road 45000 45000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Kadirannagaripalli Shankarachari House to Lakshmanna House CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Peddatunkepalli Nanjundappa House tp Adimurthy House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Gundlapalli Jayappa House to Venkatalakshmamma House CC Road 70000 70000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Chigaregundlapalli Rangappa House to Shankarappa House CC Road 85000 85000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Peddatunkepalli Village from Janatha Bazar to Ashwathappa House CC Road 115000 115000 0 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Pipeline Work at Nallapareddypalli S.T Colony to Polavaripalli Pipeline 50000 50000 50000 Completed Cement Road work at Devaragudipalli Village from Uttappa House to Tailor Venkatravanappa Chikkaballapura Bagepalli Devaragudipally 2009-10 CC Road 70000 70000 70000 Completed House Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Karkur Chowdappa House to Venkatronappa House CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Makireddypalli Thanda from Main Road to Water Tank CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Ugalanagepalli Adimurthy House to Nanjundappa House CC Road 105000 105000 105000 Completed Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Chennarayanapalli Village from S.C. Colony Balappagari Krishnappa house CC Road 170000 170000 170000 Completed

Chikkaballapura Bagepalli Devaragudipally 2009-10 Cement Road work at Motakapalli Village from A.K. Colony Auto Venkatrayappa house CC Road 272000 272000 272000 Completed Cement road work at Balareddypalli Village from Colony Chinnachoudappa House to Chikkaballapura Bagepalli Devaragudipally 2010-11 CC Road 30000 0 0 Not Started Adinarayanappa House Cement Road Work at Kadirannagaripalli Village Lakshmanna House to Ashwathanarayana Chikkaballapura Bagepalli Devaragudipally 2010-11 CC Road 30000 0 0 Not Started House Cement Road Work at Karukuru Village from Lakshmipathy House to Bogepalli Venkatarayappa Chikkaballapura Bagepalli Devaragudipally 2010-11 CC Road 30000 0 0 Not Started House Chikkaballapura Bagepalli Devaragudipally 2010-11 Mesentry Draine At Makireddypalli Village from Beside of Main road CC Road 30000 0 0 Not Started Box type drainage work at Sadlavaripalli Village from Venkatarayappa House to Choudi Chikkaballapura Bagepalli Devaragudipally 2010-11 Drainage 30000 0 0 Not Started Venkataramappa House Chikkaballapura Bagepalli Devaragudipally 2010-11 Mesentry Draine Beside Karukuru Temple Drainage 30000 0 0 Not Started Cement Road Work at Chigaregundlapalli Village from Rangappa House to Venkaramappa Chikkaballapura Bagepalli Devaragudipally 2010-11 CC Road 60000 0 0 Not Started House Chikkaballapura Bagepalli Devaragudipally 2010-11 Cement Road Work at Devargudipalli Village from Srinivas House to Krishnappa House CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Devaragudipally 2010-11 Cement Road Work at Gundlapalli Village from jayappa house to Ramanji House CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Devaragudipally 2010-11 Cement road work at Kammaravaripalli Village from Nanjappa House to Gangulamma House CC Road 60000 0 0 Not Started

Chikkaballapura Bagepalli Devaragudipally 2010-11 Cement Road Work at Kondomvaripalli Village from Ramaswamy Temple to Anganavadi CC Road 60000 0 0 Not Started

Chikkaballapura Bagepalli Devaragudipally 2010-11 Cement road work at Mallasandra Village from Narasimhappa House to Yallakka House CC Road 90000 0 0 Not Started

Chikkaballapura Bagepalli Devaragudipally 2010-11 Cement Road Work at Peddathunkepalli Village from janatha Bajar Main road to Jayappa House CC Road 126000 0 0 Not Started Chikkaballapura Bagepalli Devaragudipally 2010-11 Bourwell and Pipe line work at malachinnepalli Village In Drinking Water Purpose Drinking Water Supply 300000 0 0 Not Started Chikkaballapura Bagepalli Devaragudipally 2010-11 Construction of Panchayath building in Nallapareddypalli Village Construction of Gram Panchayat414000 Building 0 0 Not Started Chikkaballapura Bagepalli Ghantamvaripalli 2006-07 Purchasing Of Water Supply Pump And Motor In Hosahudya Village Drinking Water Supply 100000 100000 0 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2006-07 Pipeline Work In Gantamvaripalli Village Pipeline 100000 100000 0 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2006-07 Purchasing of Street Lights In Gantamvaripalli Gram Panchayath for all Villages Construction of Gram Panchayat382000 Building 385000 185000 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2007-08 Cement Road at Puttaparthy Village From Obannagari Adeppa House to sriramareddy House CC Road 100000 100000 0 Completed Pipe line and 4 Water Tanks for the drinking Water Fecility at Puttaparthy Village For O.H.T New Chikkaballapura Bagepalli Ghantamvaripalli 2007-08 Drinking Water Supply 100000 100000 0 Completed Houses Chikkaballapura Bagepalli Ghantamvaripalli 2007-08 Pipe line and Water fecility For the Public at Yagavabandlakere Pipeline 130000 130000 0 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2007-08 Cement Road at hosahudya Village From Vasanthappa House to Gollara Shivappa House CC Road 181000 181000 0 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2007-08 Cement Road At abakavripalli From S.C.Gangappa Colony To Adinarayanappa House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2007-08 Cement Road at Pathabagepalli Village From Bhajana Mandira to A.K.Colony CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2007-08 Cement Road In Pothepalli Village From Narasimhappa House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2008-09 Cement Road Work at Etigaddapalli Village from Narayanappa House to Yamareddy house CC Road 100000 100000 0 Completed Cement Road Work at hosahudya Village Gangamma Tample To bajar road Ramachandrappa Chikkaballapura Bagepalli Ghantamvaripalli 2008-09 CC Road 100000 100000 0 Completed House Drainage Work at Gounipalli Village from Somu House to Near Anjaneyaswamy Temple Chikkaballapura Bagepalli Ghantamvaripalli 2008-09 Drainage 100000 100000 0 Completed Nagalakatte Mesentry Drainage Work at Hosahuya Village from Chinnananjappagari Anjinappa House to Chikkaballapura Bagepalli Ghantamvaripalli 2008-09 Drainage 300000 300000 0 Completed Krishnappa House Cement Road Work at Gantamvaripalli Village from A.K.Colony Srirama house to Gangamma Chikkaballapura Bagepalli Ghantamvaripalli 2008-09 CC Road 100000 100000 100000 Completed Temple Drainage Work at Naremaddepalli Village from Bhovi Colony Water Tank to Hanumanthappa Chikkaballapura Bagepalli Ghantamvaripalli 2008-09 Drainage 100000 100000 100000 Completed House Chikkaballapura Bagepalli Ghantamvaripalli 2008-09 Cement Road Work at Gantamvaripalli Village from S.T.Colony Srirama house to T.B.Road CC Road 300000 300000 300000 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2009-10 Expediture on Literacy Programme IEC 85000 85000 0 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2009-10 Pipeline Work at Puttaparthy Village from H.P.S School Pipeline 100000 100000 0 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2009-10 Cement Road work at Pothepalli Village from Main Road to Chowdeshwari Temple CC Road 120000 120000 0 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2009-10 Cement Road work at Gantumvaripalli Village from Akkulappa House CC Road 220000 220000 0 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2009-10 Cement Road work at Narepalli Village from Nadipiadeppa House to Ramappa House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Ghantamvaripalli 2009-10 Drainage work at Adiganahalli Village from Yallappa House to Anjinappa house Drainage 100000 100000 100000 Completed Cement Road work at Putttaparthy Village from A.K. Colony Adinarayanappa House to Patholla Chikkaballapura Bagepalli Ghantamvaripalli 2009-10 CC Road 160000 160000 160000 Completed Venkateshappa House Chikkaballapura Bagepalli Ghantamvaripalli 2010-11 Drainage work at Narepalli Village from Bovi Colony Drainage 64000 0 0 Not Started Cement road work at abakavaripalli Village from Thurpu Narayanappa House to Dam Chikkaballapura Bagepalli Ghantamvaripalli 2010-11 CC Road 100000 0 0 Not Started Venkatappagari Narayanamma House Chikkaballapura Bagepalli Ghantamvaripalli 2010-11 Cement road work at Pulagurapalli Village Krishnareddy House to Ranappa House CC Road 150000 0 0 Not Started Chikkaballapura Bagepalli Ghantamvaripalli 2010-11 Drainage work at Adiganapalli Village from Chinnayappa House to abakavaripalli Village road Drainage 150000 0 0 Not Started Chikkaballapura Bagepalli Ghantamvaripalli 2010-11 C.C.Road work at Hosahudya Village from Narayanaswamy house to Main road CC Road 200000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2006-07 Construction of Drinking Water Ploride Tube In Gorthapalli Village Drinking Water Supply 100000 100000 0 Completed Chikkaballapura Bagepalli Gortapally 2006-07 Purchase site for L.P.S School at Gorthapalli Village (For Play Ground) School Compound and Buildings103000 103000 0 Completed Chikkaballapura Bagepalli Gortapally 2006-07 Cement road work at Sriramapur Village From Maremma Temple To ankayya House CC Road 126000 126000 0 Completed Chikkaballapura Bagepalli Gortapally 2006-07 Cement road work at Sajjupalli Village from Bus Stand Colony CC Road 160000 160000 0 Completed Chikkaballapura Bagepalli Gortapally 2006-07 Drainage Work at D.Kothapalli Village infront of Angadi narasimhappa House Drainage 130000 130000 130000 Completed Chikkaballapura Bagepalli Gortapally 2008-09 Cement roaf work at Kothuru Village from Infront of Venkataravanappa house CC Road 0 0 0 Completed Cement roaf work at Gorthapalli Village from A.K.Colony Thippepalli bavanna House to Chikkaballapura Bagepalli Gortapally 2008-09 CC Road 55000 55000 0 Completed Ganganna House Chikkaballapura Bagepalli Gortapally 2008-09 Drainage work at G.Charlopalli Village from A.K.Colony Drainage 200000 200000 0 Completed Under Draine and Cement roaf work at Village from Narasimhappa House to School Chikkaballapura Bagepalli Gortapally 2008-09 CC Road 346000 346000 0 Completed Road Chikkaballapura Bagepalli Gortapally 2008-09 Cement roaf work at D.Kothapalli Village from Main Road To New Village CC Road 93000 93000 93000 Completed Chikkaballapura Bagepalli Gortapally 2008-09 Cement road work at Sajjupalli Village from Bus stand road CC Road 246000 246000 246000 Completed Chikkaballapura Bagepalli Gortapally 2008-09 Construction of First aid veternity Hospital at Gorthapalli Village Hospital work 296000 296000 296000 Completed Chikkaballapura Bagepalli Gortapally 2009-10 Cement Road work at Donakonda Basha House tp Systen CC Road 120000 120000 0 Completed Chikkaballapura Bagepalli Gortapally 2009-10 Expenditure on Literacy Programme IEC 191000 191000 0 Completed Chikkaballapura Bagepalli Gortapally 2009-10 Cement Road work at D.Kottapalli Main Road to Navagrama CC Road 329000 329000 0 Completed Chikkaballapura Bagepalli Gortapally 2009-10 Cement Road work at Gorthapalli A.K. Colony Pedda Mallappa House CC Road 175000 175000 175000 Completed Chikkaballapura Bagepalli Gortapally 2009-10 Cement Road work at Gorthapalli Pedda Muniyappa House to Bus Stand CC Road 175000 175000 175000 Completed Chikkaballapura Bagepalli Gortapally 2010-11 Cement road work at Boyipalli Village Infront of Vigruha CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 Cement road work at Gorthapalli Village From A.K.Colony CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 Cement road work at Grothapalli Village Infront of G.Krishnappa House CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 Cement road work at Sajjupalli Village infront of Nagabhushana House CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 Drainage work at Jikavandlapalli Village beside Ramappa House Drainage 50000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 Drainage work at Sriramapur Village Infront of balaji House Drainage 50000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 Drainage work at D.Kothapalli Village Infront of Shivashankarappa House Drainage 100000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 Drainage work at G.charlopalli Village infront of Lakshminarayana House Drainage 100000 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 Installation of Street Lights For all Villages In Gorthapalli Gram Panchayath Construction of Gram Panchayat116000 Building 0 0 Not Started Chikkaballapura Bagepalli Gortapally 2010-11 I.E.C Programme Purpose IEC 154000 0 0 Not Started Chikkaballapura Bagepalli Gulur 2006-07 Cement Road at Egavaivarlapalli Village from Kodagi Narsimhappa House to Water Tank CC Road 90000 90000 0 Completed Chikkaballapura Bagepalli Gulur 2006-07 Installation of Street Lights for all Villages in Gulur Gram Panchayath Construction of Gram Panchayat99000 Building 99000 0 Completed Chikkaballapura Bagepalli Gulur 2006-07 Cement Road at Gulur Venkatramayya Shetty House to Venkatachalapathy House CC Road 200000 200000 0 Completed Chikkaballapura Bagepalli Gulur 2006-07 Road work at Koyyagutta Thanda Main Road CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Gulur 2006-07 Drainage work at Saddupalli Village from S.C. Colony to Water Tank Drainage 60000 60000 60000 Completed Chikkaballapura Bagepalli Gulur 2007-08 Minidrainage work at channarayanapalli Village Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Gulur 2007-08 Compound Work And kitchen room Repair Work at DigavaIvarlapalli School Compound wall 100000 100000 0 Completed Chikkaballapura Bagepalli Gulur 2007-08 Box Type Drainage Work at Parvathipura thanda Drainage 100000 100000 0 Completed Chikkaballapura Bagepalli Gulur 2007-08 V.Shape Drainage Work at Guluru Village From JabbarKhan House to Sanchalara Ramayya House Drainage 100000 100000 0 Completed Chikkaballapura Bagepalli Gulur 2007-08 Yarrakunte Lake Development Work At Saddupalli Village other works 100000 100000 0 Completed Chikkaballapura Bagepalli Gulur 2007-08 V.Shape Drainage Work at Guluru Village From Ramayya House to Venkataramappa House Drainage 133000 133000 0 Completed

Chikkaballapura Bagepalli Gulur 2007-08 V.Shape Drainage Work at Guluru Village From S.C.Colony To Bodappa House to Mini Tank Drainage 100000 100000 100000 Completed Chikkaballapura Bagepalli Gulur 2007-08 Road Development Work at Guluru Village from S.T.Colony to Pathakotamma Well CC Road 150000 150000 150000 Completed Chikkaballapura Bagepalli Gulur 2008-09 Cement Road Work From Main road at Chinnakayalapalli Village CC Road 65000 65000 0 Completed Road Development Work at Anjinapura Village from anjinapura road to Jodiroddampalli Villagr Chikkaballapura Bagepalli Gulur 2008-09 CC Road 65000 65000 0 Completed road Chikkaballapura Bagepalli Gulur 2008-09 Road Development Work at Parvathipura Thanda Village CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Gulur 2008-09 Road Development Work at Guluru From Milk Dairy to Saddupalli Village Road CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Gulur 2008-09 Well Work at Saddupalli Village Open Well 130000 130000 0 Completed Chikkaballapura Bagepalli Gulur 2008-09 Box type Drainage work at Gulur Village Drainage 139000 139000 0 Completed Chikkaballapura Bagepalli Gulur 2008-09 Duggwell Work at Guluru Village Open Well 173000 173000 0 Completed Chikkaballapura Bagepalli Gulur 2008-09 Cement Road Work at Guluru Village from S.C.Colony From Temple to Gangulappa House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Gulur 2008-09 Box type Drainage work at Koyyaguttathanda Village Drainage 100000 100000 100000 Completed Chikkaballapura Bagepalli Gulur 2008-09 Road Development Work at eguvaIvaripalli CC Road 130000 130000 130000 Completed Chikkaballapura Bagepalli Gulur 2009-10 L.Shape Drainage at Gulur Jabbarsaab house to Abdulsaab House Drainage 100000 0 0 Not Started Chikkaballapura Bagepalli Gulur 2009-10 Cement Road work at Jodiroddampalli Village from Gownikere Bridge CC Road 100000 100000 0 Completed Construction of Box Type Drainage at Gulur Village from Egavaivarlapalli Gangulappa House to Chikkaballapura Bagepalli Gulur 2009-10 Drainage 100000 100000 0 Completed Kodihalli Chikkaballapura Bagepalli Gulur 2009-10 Expenditure on Literacy Programme IEC 100000 100000 0 Completed Chikkaballapura Bagepalli Gulur 2009-10 Drianage and Rivitment Work at Lakshmanathanda Village from Koyyigutta Thanda Drainage 199000 199000 0 Completed Chikkaballapura Bagepalli Gulur 2009-10 Cement Road work at Saddupalli Village from Kunte CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Gulur 2009-10 Cement Road work at Gulur Village at Pathakotamma Temple CC Road 50000 50000 50000 Not Started Chikkaballapura Bagepalli Gulur 2009-10 Cement Road work at Gulur Village from Cinema Hall to Lakshminarayanappa House CC Road 50000 50000 50000 Not Started Chikkaballapura Bagepalli Gulur 2009-10 Construction of Box Type Drainage at Ivarlapalli Village from Narayanappa House to Main Road CC Road and Drainage 50000 50000 50000 Not Started Chikkaballapura Bagepalli Gulur 2009-10 Canal and Drainage work at Gulur Village from VenkataramaShetty House Drainage 100000 100000 100000 Not Started Chikkaballapura Bagepalli Gulur 2010-11 C.C.Road work at Guluru Village From S.C.Colony infront of Narasimhappa House CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Gulur 2010-11 C.C.Road work at Kuruvadinnapalli Village From S.T.Colony infront of Adinarayanappa House CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Gulur 2010-11 C.C.Road work at Lakshmanathanda Village CC Road 74000 0 0 Not Started Chikkaballapura Bagepalli Gulur 2010-11 Construction of L.P.S.school Compound at Saddupalli Village Compound wall 100000 0 0 Not Started Chikkaballapura Bagepalli Gulur 2010-11 Box Type Drainage work ar Egavaivaripalli Village from infront of gangamma House Drainage 100000 0 0 Not Started Chikkaballapura Bagepalli Gulur 2010-11 C.C.Road work at Gulur Village from Jarappa House to Narasimhappa house CC Road 280000 0 0 Not Started Chikkaballapura Bagepalli Kottakote 2006-07 Cement Road Work at Honnampalli Village from Suryanarayana House to Narasamma House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Kottakote 2006-07 Cement Road Work at Maadappalli Village infront of Srirama Temple. CC Road 60000 60000 0 Completed Cement Road Work at Ramanoddampalli Village from Venkatrayappa House to Narasimhappa Chikkaballapura Bagepalli Kottakote 2006-07 CC Road 60000 60000 0 Completed House Chikkaballapura Bagepalli Kottakote 2006-07 Cement Road Work at Chinnepalli Village from Somashekarreddy House to Krishnareddy House CC Road 80000 80000 0 Completed Cement Road Work at Ramanoddampalli Village from S.T Bhagavanthappa House to Banyan Chikkaballapura Bagepalli Kottakote 2006-07 CC Road 50000 50000 50000 Completed Teree Chikkaballapura Bagepalli Kottakote 2006-07 Cement Road Work at Kolipalli Village from Chinnappayya House to School Ground CC Road 80000 80000 80000 Completed Chikkaballapura Bagepalli Kottakote 2006-07 Cement Road Work at Kothakote Village from Main Road to S.T Rangappa House CC Road 80000 80000 80000 Completed Chikkaballapura Bagepalli Kottakote 2007-08 L.P.S school Repair at Kothakote Gram Panchayath Construction of Gram Panchayat20000 Building 20000 0 Completed Chikkaballapura Bagepalli Kottakote 2007-08 Cement road Work at Honnampalli Village from Bidi venkataramappa House To Shivamma House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Kottakote 2007-08 Cement road Work at Madappalli From Erappa house To S.C.Ashwathappa House CC Road 50000 50000 0 Completed Cement road Work at Mamidikayalapalli Village From Chikkavenkaramappa House to Srirama Chikkaballapura Bagepalli Kottakote 2007-08 CC Road 50000 50000 0 Completed temple Chikkaballapura Bagepalli Kottakote 2007-08 Roofing work and flouring work in Library at Kothakote Village Construction Of Library 50000 50000 0 Completed Chikkaballapura Bagepalli Kottakote 2007-08 Drain Work At Mummadivaripalli Village From Suryanarayanareddy House To Rama Temple Drainage 50000 50000 0 Completed

Chikkaballapura Bagepalli Kottakote 2007-08 Cement road Work at kothakote Village from Sathyamma House To ungarala Krishnappa House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Kottakote 2007-08 Cement road Work at Kolimpalli Village From Obalappa House To Chinnapaiha house CC Road 50000 50000 50000 Completed Cement road Work at Krishnapura Village from S.T.Golla Venkatarayappa House To Chikkaballapura Bagepalli Kottakote 2007-08 CC Road 50000 50000 50000 Completed Narasimhappa House Chikkaballapura Bagepalli Kottakote 2007-08 Cement road Work at Ramanoddampalli Village From Main Road to Srirama Temple CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Kottakote 2008-09 Cement Road work at Chinnepalli Village from Main road to Ramohanreddy House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Kottakote 2008-09 Cement Road work at Madakavripalli Village from Dhobi Akkulappa House to School road CC Road 50000 50000 0 Completed Cement Road work at Pesalaparthy Village From Adinarayanareddy House to S.T.anjinappa Chikkaballapura Bagepalli Kottakote 2008-09 CC Road 50000 50000 0 Completed House Chikkaballapura Bagepalli Kottakote 2008-09 Cement Road work at Honnampalli Village from Near Sanjeevappa house CC Road 65000 65000 0 Completed Cement Road work at Pesalaparthy Village From Shankaramurthy house to Venkatarayappa Chikkaballapura Bagepalli Kottakote 2008-09 CC Road 87000 87000 0 Completed House Drainage work at Road Development Work at Mamidikayalapalli Village from Ramanoddampalli Chikkaballapura Bagepalli Kottakote 2008-09 Drainage 87000 87000 0 Completed Road Chikkaballapura Bagepalli Kottakote 2008-09 Drainage work at Krishnapura Village from Chinnepalli Village Road Drainage 87000 87000 0 Completed Chikkaballapura Bagepalli Kottakote 2008-09 Pitching Work at Kolimpalli from Near Samudaya Bhavana Pitching Work 87000 87000 0 Completed Chikkaballapura Bagepalli Kottakote 2008-09 Furniture and Construction of Computer Room at Kothakote Gram Panchayath Construction of Gram Panchayat95000 Building 95000 0 Completed Cement Road work at Chinnepalli Village from Rajamohanreddy house to Chikkaballapura Bagepalli Kottakote 2008-09 CC Road 87000 87000 87000 Completed S.T.Nakkalnarasimhappa House Chikkaballapura Bagepalli Kottakote 2008-09 Cement Road work at Kothakote Village from E.K.Chinnarayappa House to Rangappa house CC Road 87000 87000 87000 Completed Chikkaballapura Bagepalli Kottakote 2008-09 Cement Road work at Madapalli Village S.T.kondappa House to Ashwathakatte Road CC Road 87000 87000 87000 Completed Cement Road work at Mummadivaripalli Village from S.T.Narasimhappa house to venkatrayappa Chikkaballapura Bagepalli Kottakote 2008-09 CC Road 87000 87000 87000 Completed house Chikkaballapura Bagepalli Kottakote 2008-09 Cement Road work at Ramanoddampalli Village from S.T.Narasamma house to Srirama Temple CC Road 87000 87000 87000 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Expenditure on Drinking water Facility Drinking Water Supply 21000 21000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Cement Road work at Kottakote Village from Anjaneya Temple to Bayya Gudi Road CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Cement Road work at CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Cement Road work at Krishnapur village from Venkatrav House to water Tank CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Cement Road work at Madakavaripalli Village from Anganavadi School CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Cement Road work at Madappalli Village from Kondappa House to Ashwatha Katte CC Road 60000 60000 0 Completed Cement Road work at Pesalaparthy Village from Subramanyam house to Kumbara Nagamma Chikkaballapura Bagepalli Kottakote 2009-10 CC Road 60000 60000 0 Completed House Chikkaballapura Bagepalli Kottakote 2009-10 Drainage Work at Rmanoddampalli Village from Shankareddy House to Ashwata Katte Drainage 60000 60000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Mesentri Drainage Work at Honnampali Village from School Drainage 60000 60000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Pittching and Cement Road work at Kolimpalli Village from Ashwathakatte CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Expenditure on Literacy Programme IEC 90000 90000 0 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Cement Road work at Chinnepalli S.T. Nareppa House to Mangala Narayanaswami House CC Road 60000 60000 60000 Completed Cement Road work at Mamidimakalapalli Village from Government School to S.C Chikkaballapura Bagepalli Kottakote 2009-10 CC Road 60000 60000 60000 Completed Ramakrishnappa House Chikkaballapura Bagepalli Kottakote 2009-10 Cement Road work at Mummadivariapalli S.T Venkatramappa House to Main Road CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Kottakote 2009-10 Cement Road work at Kottakote Main Road to S,T Cheemala Ramappa House CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Kottakote 2010-11 Cement Raod work at Madakavaripalli Village from infront of anganavadi CC Road 161000 0 0 Not Started Chikkaballapura Bagepalli Kottakote 2010-11 Cement Raod work at Ramanoddampalli Village from Konappa House to Ashwathamma house CC Road 80000 40000 0 Completed Cement Raod work at Mummadivaripalli Village from Pullayareddy House to Venkatareddy Chikkaballapura Bagepalli Kottakote 2010-11 CC Road 40000 40000 40000 Completed House Cement Raod work at Krishnapur Village from S.T.Nanjundappa House to Gantla Chikkaballapura Bagepalli Kottakote 2010-11 CC Road 80000 40000 40000 Completed ShivaShankarareddy House Cement Raod work at pesalaparthy village from A.K.Colony Main road To Pedda Rangappa Chikkaballapura Bagepalli Kottakote 2010-11 CC Road 87000 67000 67000 Completed House Cement Raod work at Ramanoddampalli Village from S.C.Colony Venkataramappa House to Chikkaballapura Bagepalli Kottakote 2010-11 CC Road 167000 67000 67000 Completed S.C.Konappa house Chikkaballapura Bagepalli Kottakote 2010-11 Cement Raod work at honnampalli Village from S.T.Colony to Gunakala Ramappa CC Road 60000 80000 80000 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work at Jogireddypalli Village CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work at Marganakunte Village CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work at Marganakunte Village CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work at Picchalavaripalli Village CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work in Marganukunte CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Drainage work at Marganakunte Village Drainage 40000 40000 0 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work In Nanjireddypalli CC Road 80000 80000 0 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work at Marganakunte Village CC Road 40000 40000 40000 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work at Narayanswamikote Village CC Road 40000 40000 40000 Completed Chikkaballapura Bagepalli Marganukunte 2006-07 Cement Road Work at Devikunte Village. CC Road 80000 80000 40000 Completed Chikkaballapura Bagepalli Marganukunte 2007-08 Cement Road at Chinathamakaladinne Village CC Road 52000 52000 0 Completed Chikkaballapura Bagepalli Marganukunte 2007-08 Cement Road at Narasapura Village CC Road 104000 104000 0 Completed Chikkaballapura Bagepalli Marganukunte 2007-08 Cement Road at Maraganukunte Village CC Road 156000 156000 0 Completed Chikkaballapura Bagepalli Marganukunte 2007-08 Cement Road at Maraganukunte Village CC Road 156000 156000 0 Completed Chikkaballapura Bagepalli Marganukunte 2007-08 Cement Road at Pichalavaripalli Village CC Road 52000 52000 52000 Completed Chikkaballapura Bagepalli Marganukunte 2007-08 Cement Road at Pokamakalapalli Village CC Road 52000 52000 52000 Completed Chikkaballapura Bagepalli Marganukunte 2007-08 Cement Road at Devikunte Village CC Road 104000 104000 104000 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Pipeline Work at Marganukunte Village Pipeline 60000 60000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Cement Road Work at Maraganukunte Village CC Road 70000 70000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Cement Road Work at Maraganukunte Village CC Road 70000 70000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Cement Road Work at Marganukunte Village CC Road 70000 70000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Cement Road Work at Narasapura Village CC Road 70000 70000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Drainage Work at Marganukunte Village Drainage 70000 70000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Cement Road Work at Jogireddypalli Village CC Road 71000 71000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Pipeline Work at Marganukunte Village Pipeline 71000 71000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Cement Road Work at Marganukunte Village CC Road 210000 210000 0 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Cement Road Work at Narayanswamykote Village CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Marganukunte 2008-09 Cement Road Work at Devikunte CC Road 140000 140000 140000 Completed Chikkaballapura Bagepalli Marganukunte 2009-10 Cement Road work at Marganakunte Village from Bavajisaab house to Kalandarsaab Village CC Road 55000 55000 0 Completed

Chikkaballapura Bagepalli Marganukunte 2009-10 Cement Road work at Marganakunte Village from Haneef Saab House to C. Shivappa House CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Marganukunte 2009-10 Cement Road work at Marganakunte Village from Nagarajappa House CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Marganukunte 2009-10 Cement Road work at MarganakunteVillage from Mohammad Houe to Peerusaab House CC Road 55000 55000 0 Completed Cement Road work at Nanjireddypalli Village from Nagireddy House to Neeraganti Venkatappa Chikkaballapura Bagepalli Marganukunte 2009-10 CC Road 55000 55000 0 Completed House Chikkaballapura Bagepalli Marganukunte 2009-10 Cement Road work at Narasapur Village From Nagabhushana Village to Venkataramappa House CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Marganukunte 2009-10 Cement Road work at Picchalavaripalli Village from mAin Road to School. CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Marganukunte 2009-10 Cement Road work at Pokamakalapalli Village from Main Road to School Road CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Marganukunte 2009-10 Drainage work at Devikunte Village from Temple to Chapala Chinnappayya House Drainage 55000 55000 0 Completed Chikkaballapura Bagepalli Marganukunte 2009-10 Expenditure on Literacy Programme IEC 66000 66000 0 Completed Chikkaballapura Bagepalli Marganukunte 2009-10 Construction of Compound at Marganakunte Village from Gram Panchayath Office Compound wall 100000 100000 0 Completed Cement Road work at Chintamakaladhinne Village from Venkatanarasappa House to Peddanna Chikkaballapura Bagepalli Marganukunte 2009-10 CC Road 55000 55000 55000 Completed House Cement Road work at Devikunte Village from Poola Hanu,anthappa House to Talari Chikkaballapura Bagepalli Marganukunte 2009-10 CC Road 55000 55000 55000 Completed Venkataramappa House Chikkaballapura Bagepalli Marganukunte 2009-10 Cement Road work at Marganakunte Village from A.K. Bavanna House to K. Ramanna House CC Road 55000 55000 55000 Completed Construction of Mesentri Drainage at Marganakunte Village from A.K. Bavanna House to Chikkaballapura Bagepalli Marganukunte 2009-10 Drainage 55000 55000 55000 Completed Shivappa House Chikkaballapura Bagepalli Marganukunte 2010-11 I.E.C.Programme IEC 71000 0 0 Not Started Cement road work at Marganukunte Village from 2nd Block infront of Gadidim Venkataramappa Chikkaballapura Bagepalli Marganukunte 2010-11 CC Road 145000 0 0 Not Started House Cement road work at Marganukunte Village from 2nd Block infront of Ottichapala Kalndar Sab Chikkaballapura Bagepalli Marganukunte 2010-11 CC Road 145000 0 0 Not Started House Cement road work at Marganukunte Village from 1st block Mechanic Fakruddin House to Chikkaballapura Bagepalli Marganukunte 2010-11 CC Road 300000 0 0 Not Started Kittanna store Chikkaballapura Bagepalli Mittemari 2006-07 Cement road work at Mittemari Village infront of Post narasimhappa House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Mittemari 2006-07 Pitching work at Chokkampalli Village infront ot Nege Venkataramappa House Pitching Work 100000 100000 0 Completed Chikkaballapura Bagepalli Mittemari 2006-07 Construction of Samudaya Bhavan at Chokkampalli Village Community Hall 121000 121000 0 Completed Chikkaballapura Bagepalli Mittemari 2006-07 Road Development work at Mittemar Village infront of Teacher Ramaiha House CC Road 150000 150000 0 Completed Chikkaballapura Bagepalli Mittemari 2006-07 Pitching work at Malligurki Village from gangulappa House to Venkatappa House Pitching Work 100000 100000 100000 Completed Cement road work at Chinnaobayyagaripalli Village from Narasimhappa House to C.M. Chikkaballapura Bagepalli Mittemari 2007-08 CC Road 210000 210000 0 Completed Narayanswami House Chikkaballapura Bagepalli Mittemari 2007-08 Cement road work at Mittemari Village from Maddireddy house to Mallakka House CC Road 225000 225000 0 Completed Chikkaballapura Bagepalli Mittemari 2007-08 Cement road work at Malligurki Village from A.K. Lakshminarasappa House CC Road 66000 66000 66000 Completed Chikkaballapura Bagepalli Mittemari 2007-08 Road Development Work at Mittemari Village Near Janatha Colony to Hospital Compound CC Road 175000 175000 175000 Completed Chikkaballapura Bagepalli Mittemari 2008-09 Maintenance Charges other works 5000 5000 0 Completed Chikkaballapura Bagepalli Mittemari 2008-09 Drainage and Cement work at ChinnaObayyagaripalli Village Drainage 490000 490000 0 Completed Chikkaballapura Bagepalli Mittemari 2008-09 Cement road and Drainage work Gubbollapalli Village from S.T.Colony CC Road and Drainage 430000 430000 430000 Completed Chikkaballapura Bagepalli Mittemari 2009-10 Expenditure on Literacy Programme IEC 40000 40000 0 Completed Chikkaballapura Bagepalli Mittemari 2009-10 Cement Road work at Chokkampalli Village CC Road 400000 400000 0 Completed Chikkaballapura Bagepalli Mittemari 2009-10 Cement Road work at Patravaripalli S.C/S.T Colony CC Road 300000 300000 300000 Completed Chikkaballapura Bagepalli Mittemari 2010-11 I.E.C.Programme Purpose IEC 50000 0 0 Not Started Chikkaballapura Bagepalli Mittemari 2010-11 Cement road work at Chokkampalli Village from S.C.Colony CC Road 100000 0 0 Not Started Chikkaballapura Bagepalli Mittemari 2010-11 Cement road work at Chinnampalli Village CC Road 200000 0 0 Not Started Chikkaballapura Bagepalli Mittemari 2010-11 Cement road work at malligurki Village CC Road 200000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2006-07 other works other works 0 0 0 Chikkaballapura Bagepalli Nallappareddy Palli2006-07 other works other works 0 0 0 Chikkaballapura Bagepalli Nallappareddy Palli2006-07 other works other works 0 0 0 Chikkaballapura Bagepalli Nallappareddy Palli2006-07 other works other works 0 0 0 Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Bajjapura Village from Main Road to Malaganti Venkatravanappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Beeragivaripalli Village Near Temple CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Iddilavaripalli Village from Temple to Beerangi Venkatravanappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Moogireddypalli Village CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Nallgutlapalli Village from Bayyappa House to Adinarayana House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Pasapalavaripalli Village CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Peddur Village Main Road CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Rajuvandlapalli Village from School to Water Systen CC Road 50000 50000 0 Completed Cement road work at Venkatapura Village from Peddabayyappa House to Venkatravanappa Chikkaballapura Bagepalli Nallappareddy Palli2007-08 CC Road 50000 50000 0 Completed House Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Channel Work at Bhattalavaripalli Village Drinking Water Supply 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Guntoorpalli Village A.K. Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Guntoorpalli Village from Mangalamma Subbanna House to Lake CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Jilipigaripalli Village from A.K. Colony infront pf Temple CC Road 50000 50000 50000 Completed Cement road work at Moogireddypalli Egavathanda Village from Narasimha naika house to Chikkaballapura Bagepalli Nallappareddy Palli2007-08 CC Road 50000 50000 50000 Completed Krishna naik House Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Cement road work at Moogireddypalli Village from Govindanaika House to Babenaika House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2007-08 Drainage work at Jilipigaripalli Thanda near Hemanaika House Drainage 100000 100000 100000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement Road work at Gundlapalli Village From infront of Gattu Narayanappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement road work at Pasapulavaripalli Village from behind Narasimhappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement Road Bajjapura Village from Maligantivenkatravana House to Srinivasa House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement road work at Nallagutlapalli Village from Adinarayana House to Agasara Ramappa House CC Road 60000 60000 0 Completed

Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement road work at Rajuvandlapalli Village from Venkataramireddy House to School Road CC Road 60000 60000 0 Completed

Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement Road work at Venkatapura Village from Chikkabaiyappa House Sriramareddy House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Drainage Work at Iddilavaripalli Village from Venkatareddy House to Water Tank Road Drainage 60000 60000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Duggwell Work at Gunthurupalli Village from Infront of Village Open Well 60000 60000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Duggwell Work at Venkatapura Village from Infront of Village Open Well 60000 60000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Drainage work at Jilipigaripalli Village from behind Narayanappa House Drainage 68000 68000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement road work at Jiligaripalli Village from Behind The Systen CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement road work at Jilipigaripalli Village from A.D.Colony CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Duggwell Work at Bathalavaripalli Village in Amarakunte Open Well 100000 100000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement Road work at Pedduru Village from A.K.Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement Road work at Gunthurupalli Village from School to Temple CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2008-09 Cement Road work at Kuntlapalli Village from Ramaswamynaik House to Thippenaik House CC Road 60000 60000 60000 Completed Cement Road work at Mugireddypalli Village from thavarenaik house to Saddamnarayanareddy Chikkaballapura Bagepalli Nallappareddy Palli2008-09 CC Road 60000 60000 60000 Completed House Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Expenditure on Literacy Programme IEC 44000 44000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Bajjapuara S. Narayanappa House to Yalagalapalli Venkatareddy House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Battalavaripalli A.K. Colony CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Jilipigaripalli Thanda CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Nallagutlapalli Anjaneyareddy House to Palyakere Road CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Venkatapura Shivareddy house to N.S Prabhakarao House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Developemt of Road Work at Gunturpalli Village CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Drainage work at Beerangivandlapalli infront of Shivanna House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Drainage work at Iddilivaripalli Eshwareddy house to Venkatareddy House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Drainage work at Jilipigaripalli Thanda Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Canal work at Gundlapalli Village other works 50000 50000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Jilipigaripalli CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Gunturpalli A.K. Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Mugireddypalli M.W.S water Tank to Peerenaik House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Peddur A.K. Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Cement Road work at Rajuvandlapalli Seenanaik House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2009-10 Drainage Wrok at Mugireddypalli Yagavathanda Water Tank to Tolasenaik House Drainage 50000 50000 50000 Completed Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Venkatapur Village fron Golla Venkataravana House to Dairy CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Pitching work at Kothakotavandlapalli Village infront of Baireddy House Pitching Work 40000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Nallagutlapalli Village from agasara Ramappa House CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Pedduru Village From Muniyappa House CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Jilipoigaripalli Village from Pirenaik House CC Road 71000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Bajjapur Village beside of mory CC Road 80000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Bathalavaripalli Village from Morasu Venkataramappa House CC Road 80000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Gunturupalli Village from achari House CC Road 80000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Mugireddypalli Village from Babenaika House to Govindanaik CC Road 80000 0 0 Not Started Chikkaballapura Bagepalli Nallappareddy Palli2010-11 Cement Road work at Jilipigaripalli Village from A.K.Colony CC Road 100000 0 0 Not Started Cement Road Work at Village Bhajanthrei Venkatayappa House to Narasappa Chikkaballapura Bagepalli Naremaddepalli 2006-07 CC Road 60000 60000 0 Completed House Chikkaballapura Bagepalli Naremaddepalli 2006-07 Cement Road Work at Naremaddepalli Village from Bus Stand to Kumbara Muniswamy House CC Road 60000 60000 0 Completed

Chikkaballapura Bagepalli Naremaddepalli 2006-07 Drainage work at Rechenayakanapalli Village from Bayyamma House to Chennappa House Drainage 60000 60000 0 Completed

Chikkaballapura Bagepalli Naremaddepalli 2006-07 Cement Road Work at Doddipalli Village from Middinti Venkatravanappa House to A.K. Colony CC Road 90000 90000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2006-07 Constrcution of Compound to H.P.S school at Naremaddepalli Village Compound wall 105000 105000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2006-07 Cement Road Work at Shivapura Village from Milk Dairy to Chowdamma House CC Road 124000 124000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2006-07 Cement Road Work at Jangalapalli Village from Gowramma House to Kutala Jayachandra House CC Road 60000 60000 60000 Completed Cement road work at Indukoorollapalli Village from Chinnadeppa house to Venkatravanappa Chikkaballapura Bagepalli Naremaddepalli 2007-08 CC Road 50000 50000 0 Completed House Chikkaballapura Bagepalli Naremaddepalli 2007-08 Cement road work at Dugginayakanapalli Village (infront of Temple) CC Road 55000 55000 0 Completed Cement road work at Indukoorollapalli Village from Nagireddy House to K.S. Venkatareddy Chikkaballapura Bagepalli Naremaddepalli 2007-08 CC Road 55000 55000 0 Completed House Chikkaballapura Bagepalli Naremaddepalli 2007-08 Pitching work at Kalluronikunte Village from Tailor Muttappa House to Narasimhappa House Pitching Work 55000 55000 0 Completed Cement road work at Jangalapalli Village from Yalam Narasimhappa House to Kantala Chikkaballapura Bagepalli Naremaddepalli 2007-08 CC Road 90000 90000 0 Completed Jayachandra House Chikkaballapura Bagepalli Naremaddepalli 2007-08 Cement road work at Shivapura Village from S.C. Venkatareddy house to Water Tank CC Road 90000 90000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2007-08 Drainage Work at Kurubarapalli Village from B.Shivareddy House to G.S Gangulappa House Drainage 90000 90000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2007-08 Drainage Work at Bestalapalli Village from Water Systen to Ramayya House Drainage 90000 90000 90000 Completed Chikkaballapura Bagepalli Naremaddepalli 2007-08 Pitching work at Kalluronikunte Village venkatappa House to A.K. Narasappa House Pitching Work 90000 90000 90000 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Indukorollapalli Village from Shankarareddy to Water Burwell CC Road 45000 45000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at jangalapalli Village from Srirama House to Chandrappa House CC Road 45000 45000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Kamatampalli Village from Jayappa House Jangalapalli Road CC Road 45000 45000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at besthalapalli Village from Srirama Temple to S.Venkaravamanappa House CC Road 55000 55000 0 Completed

Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Jangalapalli Village from Kavvala Jayachandra House to Srinivasa House CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Kamatampalli Village from Infront of Temple CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Kuruvapalli Village from Maseedi to filter machine CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Kuruvapalli Village from Moulasabi House to Temple Road CC Road 55000 55000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Shivapura Village from Dairy to Shankara House CC Road 55000 55000 0 Completed Cement Road work at Doddivaripalli Village from Middinti Venkataravanappa House to Chikkaballapura Bagepalli Naremaddepalli 2008-09 CC Road 93000 93000 0 Completed Ku||Venkataramana House Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Naremaddepalli Village from Eshwara Temple Road CC Road 110000 110000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at Doddivaripalli Village from Ankalappa House to Rama Temple CC Road 55000 55000 55000 Completed Chikkaballapura Bagepalli Naremaddepalli 2008-09 Cement Road work at gyadivandlapalli Village From Infront of Temple CC Road 55000 55000 55000 Completed Cement Road work at Gyadivandlapalli Village From A.K.Colony Narasimhappa House Ramappa Chikkaballapura Bagepalli Naremaddepalli 2008-09 CC Road 90000 90000 90000 Completed House Chikkaballapura Bagepalli Naremaddepalli 2008-09 Pitching Work at Rechanayakanapalli Village from Venkataronappa House to Gowramma House Pitching Work 90000 90000 90000 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Constrction of Toilet in Naremaddepalli Gram Panchayath Bhilding Construction of Toilet 30000 30000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Constrcution of Water Pond at Kamatumpalli Village Drinking Water Supply 50000 50000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Drainage work at Bestalapalli L.P.S School Drainage 54000 54000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Cement Road work at Jangalapalli Chandra House to Shivanna House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Cement Road work at Shivapura K.B. Krishnareddy House tp Narasimhappa House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Pittching Work at Doddivaripalli School to Narayanappa House School Compound and Buildings60000 60000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Constrction of Toilet in Naremaddepalli Gram Panchayath Bhilding Construction of Toilet 83000 83000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Cement Road work at Kurubarapalli Lakshmappa House to Gangulappa House CC Road 90000 90000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Constrcution of High School Compound at Naremaddepalli Village Compound wall 110000 110000 0 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Pittching work at Dugginayakanapalli Venkatappa(SC Colony) house to Jayaram House Pitching Work 50000 50000 50000 Completed Chikkaballapura Bagepalli Naremaddepalli 2009-10 Cement Road work at Kurubarapalli Maboosaab House to A.K. Colony Venkatravana House CC Road 60000 60000 60000 Completed Cement Road work at Naremaddepalli Mhammad Husen House to A.K. Colony Sappalamma Chikkaballapura Bagepalli Naremaddepalli 2009-10 CC Road 60000 60000 60000 Completed Temple Chikkaballapura Bagepalli Naremaddepalli 2010-11 Cement road work at Besthalapalli Village Infront of Y.Niranjan House CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Cement road work at Indukorollapalli Village Infront of Temple CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Cement road work at Kamatampalli Village CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Cement Road work at Kurubarapalli Village infront of Mahaboobsab CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Pitching work at Doddivaripalli Village In S.C.Colony Pitching Work 30000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Pitching work at Kurubarapalli Village Sappalamma Temple to S.C.Colony Pitching Work 30000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Pitching work at Kallurayanakunte Village From C.T.Colony Pitching Work 30000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Cement road work at Shivapura village from Dairy to Thulavanuru Shankarappa House CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Compound Work at Naremaddepalli Village L.P.S.School Compound wall 60000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 Compound work at Panchayatha Building In Naremaddepalli Compound wall 95000 0 0 Not Started Chikkaballapura Bagepalli Naremaddepalli 2010-11 I.E.C.Programme Purpose IEC 150000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2006-07 Kere Topu Kattada Work at Ramojipalli Village other works 64000 64000 0 Completed Chikkaballapura Bagepalli Palyakere 2006-07 Cement Road at Muddalapalli Village from Srirama Temple to Main Road CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Palyakere 2006-07 Cement Road Work at Poolakuntlapalli Village from Srirama Temple CC Road 70000 70000 0 Completed Pittching work and Drainage work at Polanayakanapalli Village from Dobi Venkatanarasappa Chikkaballapura Bagepalli Palyakere 2006-07 CC Road 70000 70000 0 Completed House to M.C Road Chikkaballapura Bagepalli Palyakere 2006-07 Drainage work at Narasapura Village from Prabhakareddy house to Venkatravanappa House Drainage 70000 70000 0 Completed Chikkaballapura Bagepalli Palyakere 2006-07 Drainage work at Nadumpalli Village from Well to Z.P Road Drainage 70000 70000 0 Completed Chikkaballapura Bagepalli Palyakere 2006-07 Drainage and Pitching Work at Balehosahalli Village from Main Road to Manohara House Pitching Work 70000 70000 0 Completed

Chikkaballapura Bagepalli Palyakere 2006-07 Pittching Work at Dugginayakanapalli Village from Chikkagangappa House to Kadirappa House Pitching Work 70000 70000 0 Completed

Chikkaballapura Bagepalli Palyakere 2006-07 Cement Road at Kotturpalli Village from Avula Venkatappa to Gorla Venkatrayappa House CC Road 111000 111000 0 Completed Chikkaballapura Bagepalli Palyakere 2006-07 Construction of Godowns at Palyakere Gram Panchayath Construction of Gram Panchayat118000 Building 118000 0 Completed Chikkaballapura Bagepalli Palyakere 2006-07 Cement Road at Gollapalli Village from Lakshmipathi Naik house to Narayanswamy House CC Road 56000 56000 56000 Completed Cement Road Work at Dugginayakanapalli Village from M. Venkatravanappa House to Pedda Chikkaballapura Bagepalli Palyakere 2006-07 CC Road 70000 70000 70000 Completed Poualappa House Chikkaballapura Bagepalli Palyakere 2006-07 Cement Road Work at Paipalya Village from H.P.S to Lakshminarasappa House CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Palyakere 2006-07 Drainage work at Kannmpalli Village from Guddappanna House to Main Road. Drainage 70000 70000 70000 Completed Chikkaballapura Bagepalli Palyakere 2006-07 Box Type Drainage work at Machanapalli A.D.colony Drainage 84000 84000 84000 Completed Chikkaballapura Bagepalli Palyakere 2007-08 Channel Work at Kuntakindapalli Village Systen to Main Road CC Road 35000 35000 0 Completed Chikkaballapura Bagepalli Palyakere 2007-08 Provision Stores at Palyakere Gram Panchayath Construction of Gram Panchayat58000 Building 58000 0 Completed Chikkaballapura Bagepalli Palyakere 2007-08 Box Type Drainage at Ramojipalli Village from Ramalingareddy house to Ramireddy House Drainage 76000 76000 0 Completed Box type drainage Work at Jinkapalli Village from Chinnanarasimhappa House to Guard Chikkaballapura Bagepalli Palyakere 2007-08 Drainage 80000 80000 0 Completed Narasimhappa House Cement road work at Ramojipalli Village from Gudiyappa Temple To Gejji Venkataravanappa Chikkaballapura Bagepalli Palyakere 2007-08 CC Road 86000 86000 0 Completed House cement Road Work at kuntlapalli Village from muddalapalli Lachumakka House to Chikkaballapura Bagepalli Palyakere 2007-08 CC Road 100000 100000 0 Completed venkataravanappa House Chikkaballapura Bagepalli Palyakere 2007-08 Cement Road Work at Motakapalli Village from Venkateshappa Bhattar House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Palyakere 2007-08 Cement Road work at Yagavamarappagaripalli Village from Narayanappa House to Main road CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Palyakere 2007-08 Draine Work at Paipalya Village (Kere kodi) Drainage 100000 100000 0 Completed Pitching work at Bodikadirepalli Village from Ashwathkatte to Main Road (Jayapalanayudu Chikkaballapura Bagepalli Palyakere 2007-08 Pitching Work 100000 100000 0 Completed House) Chikkaballapura Bagepalli Palyakere 2007-08 Compound Work and anganavadi building repair Work around L.P.S at Cheegatigalagutta Village Compound wall 114000 114000 0 Completed Cement Road work at Neeragantipalli from Chinna Erappagari Muniyappa house To guttamida Chikkaballapura Bagepalli Palyakere 2007-08 CC Road 150000 150000 0 Completed Muniyappa House Chikkaballapura Bagepalli Palyakere 2007-08 Provision Stores at Palyakere Gram Panchayath Construction of Gram Panchayat152000 Building 152000 0 Completed Chikkaballapura Bagepalli Palyakere 2007-08 Cement Road Work at Palyakere A.K.Colony Main Road To Batlapalli Venkatarayappa House CC Road 49000 49000 49000 Completed

Chikkaballapura Bagepalli Palyakere 2007-08 Box Type Drainage at Gounipalli from Bovi Narayanappa House to muninarasimhappa House Drainage 76000 76000 76000 Completed

Chikkaballapura Bagepalli Palyakere 2007-08 Box Type Drainage at mandyampalli Village from S.C.Colony Gangulappa House to A.D.Colony Drainage 76000 76000 76000 Completed Chikkaballapura Bagepalli Palyakere 2007-08 Gram Panchayath Building Repair work at Joolapalya Gram Panchayath Building Repair 90000 90000 90000 Completed Cement Road work at Joolapalya Village from S.T.Colony Buradaganti Venkataravanappa House Chikkaballapura Bagepalli Palyakere 2007-08 CC Road 100000 100000 100000 Completed to chinnayappa House Chikkaballapura Bagepalli Palyakere 2007-08 Cement Draine work at Sridharavaripalli From A.K.Colony Gopalappa House to Gangappa House Drainage 100000 100000 100000 Completed

Chikkaballapura Bagepalli Palyakere 2008-09 Drainage Work at Palyakere Village from Nagraju house to sakalavenkataravanappa house Drainage 34000 34000 0 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road work at Choudapalli Village kukkalaramaiha house to siddappa house CC Road 43000 43000 0 Completed Cement Road work at machanapalli Village from ndumpalli bayyappa house to myakala Chikkaballapura Bagepalli Palyakere 2008-09 CC Road 50000 50000 0 Completed bayyappa house Chikkaballapura Bagepalli Palyakere 2008-09 Construction of Computer Room at Joolapalya Gram Panchayath Construction of Gram Panchayat52000 Building 52000 0 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Water Suply Project Work Drinking Water Supply 60000 60000 0 Completed Cement Road work at mandyampalli Village from kendenarayanappa house to chinna erappa Chikkaballapura Bagepalli Palyakere 2008-09 CC Road 76000 76000 0 Completed house Chikkaballapura Bagepalli Palyakere 2008-09 Drainage work at Jinkapalli Village from chikkanarasimhappa House (In front of) Drainage 90000 90000 0 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road work at Peddarajapalli Village from kukklapalli Venkatesh house to Main road CC Road 100000 100000 0 Completed

Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road work at Muddalapalli Village from pyayala venkatappa house to Water tank road CC Road 105000 105000 0 Completed Box type drainage at Palyakere Village from Provision Stores to infront of gram panchayath Chikkaballapura Bagepalli Palyakere 2008-09 Drainage 132000 132000 0 Completed office Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road at Pulakuntlapalli From Reddappa House to Govt roof CC Road 135000 135000 0 Completed Cement Road Work and Drainage at Village from Rangarai House to venkatarayappa Chikkaballapura Bagepalli Palyakere 2008-09 CC Road 135000 135000 0 Completed House Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road Work at Budadagaddapalli Village from Srirama Temple to Jadamadugappa House CC Road 135000 135000 0 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road Work at Kalaparallapalli Village from Anjinappa house to Main road CC Road 135000 135000 0 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road Work at Paipalya Village from main Road to Dobi Narasimhappa House CC Road 135000 135000 0 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Pitching Work at Vasapparallapalli Village from Chinnapillappa House to Gejjappa House Pitching Work 135000 135000 0 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road work at Palyakere Village from masthanasab house to main road CC Road 152000 152000 0 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road work at Gounipalli Village from Bovi Narayanappa house to Gangulappa House CC Road 57000 57000 57000 Completed

Chikkaballapura Bagepalli Palyakere 2008-09 Cement Road work at Ramojipalli Village from Venkataravana house to N.Krishnappa House CC Road 90000 90000 90000 Completed

Chikkaballapura Bagepalli Palyakere 2008-09 box type drainage at Gollapalli from Bannurapalli House behind to Venkataravanappa House Drainage 105000 105000 105000 Completed Cement Road Work at Polanayakanapalli Village from A.K.Colony Durgamma Temple to Chikkaballapura Bagepalli Palyakere 2008-09 CC Road 135000 135000 135000 Completed M.C.Road Chikkaballapura Bagepalli Palyakere 2008-09 Drain and roof work at Vadigere Village from Narayanamma house to School Drainage 135000 135000 135000 Completed Chikkaballapura Bagepalli Palyakere 2008-09 Pitching Work at Venkatapura Village from Main road to Srirama Temple Pitching Work 135000 135000 135000 Completed Chikkaballapura Bagepalli Palyakere 2009-10 Construction of R.C.C Drainage at Palayakere Village CC Road and Drainage 35000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2009-10 Construction of Canal and Drainage work at Palayakre Village from Telephone Office Drainage 70000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2009-10 Cement Road work at Banalapalli Village from Ramakrishna Temple to Nagireddy House CC Road 74000 0 0 Not Started

Chikkaballapura Bagepalli Palyakere 2009-10 Pittching Work at Ramaojipalli Village from Dodda Narasimhappa House to Anjaneyappa House Pitching Work 99000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2009-10 Expenditure on Literacy Programme IEC 72000 72000 0 Completed Chikkaballapura Bagepalli Palyakere 2009-10 Construction of Godowns at Joolapalya Village from Old Bus stand Bus Stand 100000 100000 0 Completed Cement Road work at Achaganahalli Village From Talari Ramappa House to Eddula Chikkaballapura Bagepalli Palyakere 2009-10 CC Road 100000 100000 0 Completed Venkatachalapathi House Chikkaballapura Bagepalli Palyakere 2009-10 Cement Road work at Paipalya Village from Krishnareddy House to P.C Ramayya House CC Road 100000 100000 0 Completed Cement Road work at Polanayakanapalli Village from Kalikamba Temple to Chikkaballapura Bagepalli Palyakere 2009-10 CC Road 100000 100000 0 Completed P.Ramachandraswamy House Chikkaballapura Bagepalli Palyakere 2009-10 Pittching Work at Gummollapalli Village from Ashwathappa House to Main Road CC Road 100000 100000 0 Completed Construction of Box Type Drainage at Palyakere Village fom Maddireddy House to Kadirappa Chikkaballapura Bagepalli Palyakere 2009-10 Drainage 100000 100000 0 Completed House Chikkaballapura Bagepalli Palyakere 2009-10 Expenditure on Literacy Programme IEC 60000 60000 60000 Completed Chikkaballapura Bagepalli Palyakere 2009-10 Cement Road work at Kotturpalli Village from Anganavadi Building CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Palyakere 2009-10 Cement Road work at Muddalapalli Thanda from Shankaranaik House CC Road 72000 72000 72000 Completed Chikkaballapura Bagepalli Palyakere 2009-10 Cement Road work at Kuntakindapalli Village from Kadirappa House to Venkatrayappa House CC Road 74000 74000 74000 Completed

Chikkaballapura Bagepalli Palyakere 2009-10 Cement Road work at Gundumvaripalli Village from Krishnappa House to Gangulappa House CC Road 79000 79000 79000 Completed Cement Road work at Hosahudya Village from S.C Colony Lakshminarasimhaswamy Temple to Chikkaballapura Bagepalli Palyakere 2009-10 CC Road 100000 100000 100000 Completed Timmanna House Chikkaballapura Bagepalli Palyakere 2009-10 Cement Road work at Neeragantipalli Village from MainRoad to Ramanji House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Palyakere 2009-10 Pittching Work at Bandollapalli Village from Pedda Jadugumadugappa House to Maddann House Pitching Work 100000 100000 100000 Completed Pittching Work at Thattalapalli Village from Yanamala Pedda Narayanappa House to Srirama Chikkaballapura Bagepalli Palyakere 2009-10 Pitching Work 100000 100000 100000 Completed Temple Chikkaballapura Bagepalli Palyakere 2009-10 Pipeline work at Ramojipalli Village from Government School to A.D.A.T.S Office Pipeline 120000 120000 120000 Completed Chikkaballapura Bagepalli Palyakere 2010-11 Cement road work at Muddalapalli Thanda Village CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2010-11 Cement road work at Kothurupalli Village from Enumala Venkataravappa House to Temple CC Road 66000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2010-11 Cement road work at Nagarlu Village from infront of Erappa House CC Road 81000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2010-11 Cement road work at Paipalya Village from Veerabhadrappa house to Ko||Mallappa House CC Road 81000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2010-11 Cement road work at Venkatapura Village From S.T.Colony infront of Peddapaiha House CC Road 81000 0 0 Not Started Road Devepoment of work at Kannampalli Village from S.T.Colony Adeppa house to Sakala Chikkaballapura Bagepalli Palyakere 2010-11 CC Road 81000 0 0 Not Started Lachumakka House Chikkaballapura Bagepalli Palyakere 2010-11 Construction of Godown Work at Joolapalya Panchayath Construction of Gram Panchayat81000 Building 0 0 Not Started Pitching work at achaganapalli Village from Doddolla Venkataravanappa House to Chikkaballapura Bagepalli Palyakere 2010-11 Pitching Work 81000 0 0 Not Started Narasimhamurthy House Chikkaballapura Bagepalli Palyakere 2010-11 Pitching work at Polanayakanapalli & Village from Main Streets Pitching Work 81000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2010-11 Pitching Work at Joolapalya Village from Yarrapareddy House to nanjappa House Pitching Work 81000 0 0 Not Started Pitching Work at Polanayakanapalli Village from Chinnareddori Ramappa House to Yarrappagari Chikkaballapura Bagepalli Palyakere 2010-11 Pitching Work 81000 0 0 Not Started Narayanappa House Chikkaballapura Bagepalli Palyakere 2010-11 Cement road work at Kuntakindapalli Village from Kadirappa House to Venkatarayappa house CC Road 84000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2010-11 Govt School Compount work at Palyakere Village from A.K.Colony School Compound and Buildings89000 0 0 Not Started Cement road work at Ramojipalli Village from S.Gopal House to allapalli Venkataravanappa Chikkaballapura Bagepalli Palyakere 2010-11 CC Road 106000 0 0 Not Started House Chikkaballapura Bagepalli Palyakere 2010-11 Cement road work at Ramojipalli Village from Erappa House to Goulla Ramanjineya House CC Road 112000 0 0 Not Started Chikkaballapura Bagepalli Palyakere 2010-11 Cement road work at Gundampalli Village From main Road to gangulappa House CC Road 132000 0 0 Not Started Chikkaballapura Bagepalli Paragodu 2006-07 I.E.C. Programme IEC 20130 20130 0 Completed Chikkaballapura Bagepalli Paragodu 2006-07 Box type Drainage Work at Devareddypalli Village from Yarrappa House to Youth Fedaration Drainage 62776 62776 0 Completed Construction of Cement road work at kondireddypalli Village from Nagaraju House to Chikkaballapura Bagepalli Paragodu 2006-07 CC Road 94164 94164 0 Completed muginarasimhappa House Construction of Cement road work at Kothapalli Village From Srirama Temple to Krishnappa Chikkaballapura Bagepalli Paragodu 2006-07 CC Road 94164 94164 0 Completed House Chikkaballapura Bagepalli Paragodu 2006-07 Box type drainage work at paragodu Village from Govt school to S.C.Colony Narasimhappa house Drainage 94164 94164 0 Completed Construction of Cement road work at Hosakote Village from Ko||Ramappa House to Chikkaballapura Bagepalli Paragodu 2006-07 CC Road 125555 125555 0 Completed H.S.Subbareddy House Construction of Cement road work at Pulavaripalli Village from narayanaswamy Hoursr to Chikkaballapura Bagepalli Paragodu 2006-07 CC Road 94164 94164 94164 Completed Ramachandrappa House Chikkaballapura Bagepalli Paragodu 2007-08 I.C.S Programme(Gram Swaraj) IEC 26642 26642 0 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Anganavadi Building Repair at Devareddypalli Village Building Repair 40000 40000 0 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Box Type Draine from Sathyamma House to Narayanappa House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Box Type Draine from Srinivasa House to Ashwathappa House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Cement road work at Hosakote Village from Jayappa House to Nagaminuyappa House CC Road 55348 55348 0 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Cement road work at Kashapur Village from Yamannagari House to Poojari Narsimhappa House CC Road 70000 70000 0 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Cement road work at Dodda Narasimhappa House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Cement road work at Urammana House CC Road 107982 107982 0 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Cement road work at Kondareddypalli Village from S.C. Colony CC Road 49350 49350 49000 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Cement road work at Devareddypalli Village fro Gangappa House to Chinnappayya House CC Road 72988 72988 73000 Completed Chikkaballapura Bagepalli Paragodu 2007-08 Cement road work at Paragodu Village from Maddayya House CC Road 119350 119350 119000 Completed Chikkaballapura Bagepalli Paragodu 2008-09 Cement Road work at Ramaswamypalli Village CC Road 90000 90000 0 Completed Chikkaballapura Bagepalli Paragodu 2008-09 Cement Road work at Hosakote Village from Colony Nagappa site To Gangamma house CC Road 120000 120000 0 Completed Chikkaballapura Bagepalli Paragodu 2008-09 Cement Road work at Hosakote Village from Anjinappa house to Nanjamma House CC Road 128352 128352 0 Completed Construction of Box Type drainage at Pulavaripalli Village from dadeppa house to Narayanappa Chikkaballapura Bagepalli Paragodu 2008-09 Drainage 136482 136482 0 Completed House Cement Road work at Paragodu Village from basha House to Mangasandra Narayanamma Chikkaballapura Bagepalli Paragodu 2008-09 CC Road 150848 150848 0 Completed House Cement Road work at Bhuvennelathanda Village from S.C.Colony Eshwarappa House to Chikkaballapura Bagepalli Paragodu 2008-09 CC Road 46482 46482 46000 Completed anandamma House Cement Road work at Devareddypalli Village from Narayanappa House to S.T.Colony Chalapathy Chikkaballapura Bagepalli Paragodu 2008-09 CC Road 139988 139988 140000 Completed House Cement Road work at Kondareddypalli Village from S.T.Colony nanjappa house to Kalla Chikkaballapura Bagepalli Paragodu 2008-09 CC Road 150848 150848 150848 Completed Adinarayanappa House Chikkaballapura Bagepalli Paragodu 2009-10 Drainage work at Kottapalli Anjinappa House to Amanulla House Drainage 45000 45000 0 Completed Chikkaballapura Bagepalli Paragodu 2009-10 Expenditure on Literacy Programme IEC 50000 50000 0 Completed Chikkaballapura Bagepalli Paragodu 2009-10 Cement Road work at Srinivaspura Nanjundappa House to Narayanareddy House CC Road 51000 51000 0 Completed Chikkaballapura Bagepalli Paragodu 2009-10 Drainage work at Kottapalli Narayanappa House to Narasimhappa House Drainage 53000 53000 0 Completed Chikkaballapura Bagepalli Paragodu 2009-10 Cement Road work at Hosakote Vnkatravanappa House to Husensaabi House CC Road 95000 95000 0 Completed Chikkaballapura Bagepalli Paragodu 2009-10 Canal Work at Devareddypalli Mangasandra Lake other works 107000 107000 0 Completed Chikkaballapura Bagepalli Paragodu 2009-10 Construction of Box Type Drainage at Kondareddypalli sadashiva House to Mopurappa House Drainage 45000 45000 45000 Completed

Chikkaballapura Bagepalli Paragodu 2009-10 Cement Road work at Kondareddypalli Nanjundappa House to Sathyanarayanappa House CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Paragodu 2009-10 Cement Road work at Devaeddypalli Subramani House to Kondappa House CC Road 68000 68000 68000 Completed Chikkaballapura Bagepalli Paragodu 2009-10 Cement Road work at Vaddarapalya Anjinappa House to Tenemmagari Narayanamma House CC Road 101000 101000 101000 Completed

Chikkaballapura Bagepalli Paragodu 2009-10 Cement Road work at Pargodu S.C. Colony Tota Budagappa House to P.V. Narayanappa House CC Road 110000 110000 110000 Completed Chikkaballapura Bagepalli Paragodu 2010-11 Cement Road work at Kosakote Village from Gafer sab House to Ramireddy House CC Road 55000 0 0 Not Started Chikkaballapura Bagepalli Paragodu 2010-11 Cement Road work at Hosakote Village from Ramakrishnappa House Nadipayappa House CC Road 55000 0 0 Not Started Chikkaballapura Bagepalli Paragodu 2010-11 Cement Road work at Thimakalapalli Village from Srirama temple To Nareppa house CC Road 85000 0 0 Not Started Chikkaballapura Bagepalli Paragodu 2010-11 Cement Road work at Yandrikayalapalli Village from Ashwatha House to Mahaboob House CC Road 94000 0 0 Not Started

Chikkaballapura Bagepalli Paragodu 2010-11 Cement Road work at Pulavaripalli Village from anjinappa House to Pa||Narayanaswamy House CC Road 100000 0 0 Not Started

Chikkaballapura Bagepalli Paragodu 2010-11 Cement Road work at Devikunte Village from Chinnapaiha House to S.C.Peddanna House CC Road 100000 0 0 Not Started

Chikkaballapura Bagepalli Paragodu 2010-11 Box Type drainage at Kondireddypalli Village from Prabhakara House Shankarappa House Drainage 100000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Singappagaripalli Village CC Road 30000 30000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Solamakalapalli Village from Kukala Narasimhappa House to Temple Road CC Road 30000 30000 0 Completed Cement Road Work at Varadayyagaripalli Village from Chinnapareddy House to Chikkaballapura Bagepalli Pathapalya 2006-07 CC Road 30000 30000 0 Completed Chikkanarayanbappa house Chikkaballapura Bagepalli Pathapalya 2006-07 Drainage Work at Buttivaripalli Village from Chikkasiddappa House to Srinivasappa House Drainage 30000 30000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Systen and Drainage work at Muthinapalli Village Drainage 30000 30000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Gujjepalli Villge infront of School CC Road 32000 32000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Construction of Bridge at Guntiganapalli Village from Rathnamma House Bridge work 60000 60000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Kamatampalli Village from Ravichandra House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Kangamakalapalli Village from Main Road to Narasimhareddy House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Drainage Work at Giriyappalli Village from Anjaneyaswamy Temple Drainage 60000 60000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Devarajapalli CC Road 74000 74000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Gudipalli Village CC Road 75000 75000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Pathakote Village CC Road 80000 80000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Drainage work at Pahtapalya Village Behind Police Quartres Drainage 80000 80000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Pathpalya Village CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Village from Kajjanna House to Narayanappa House CC Road 30000 30000 30000 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Nadimapalli Village from Nanjappa House to Dhobi Narasimhappa House CC Road 30000 30000 30000 Completed Cement Road Work at Thummepalli Village from Angadi Lakshmayya house to Narasamma Chikkaballapura Bagepalli Pathapalya 2006-07 CC Road 30000 30000 30000 Completed House Constrcution of Double Side Dainage at Buttivaripali Village from A.D Colony Kolla Narayanappa Chikkaballapura Bagepalli Pathapalya 2006-07 Drainage 30000 30000 30000 Completed House Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Pathapalya Village(A.K. Colony) CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Kothakote Village from Main Road to Papamma House CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Pathapalya 2006-07 Cement Road Work at Buragamadugu Village from A.K. Colony to Main Road CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Singappagaripalli Village from Muttanna House to Temple Road CC Road 35000 35000 0 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Byrappagaripalli Village from Venkatappa House to Well. CC Road 44000 44000 0 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Gondipalli Village CC Road 44000 44000 0 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Sangatapalli Village from Gopalareddy House to tattappa House CC Road 44000 44000 0 Completed Cement road work at Buttavaripalli Village from Arla Venkatrayappa House to Onappagari Chikkaballapura Bagepalli Pathapalya 2007-08 CC Road 50000 50000 0 Completed Papanna House Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Nallasanampalli Village CC Road 67000 67000 0 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Giriyappanahalli Village from Mainroad to Venkatappa House CC Road 100000 100000 0 Completed Cement road work at Kanagamakalapalli Village from Narasimhappa House to Grampanchayath Chikkaballapura Bagepalli Pathapalya 2007-08 CC Road 100000 100000 0 Completed Building Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Maddalakhane Village from Krishnappa House to Narasimhappa House CC Road 100000 100000 0 Completed

Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Varadayyagaripalli Village from Krishnappa House to Narasimhappa House CC Road 100000 100000 0 Completed

Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Nadumpalli Village from Narasimhappa House to Srinivasappa House CC Road 150000 150000 0 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Gujjepalli infront of Police Chennappa House CC Road 44000 44000 44000 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Bukkanapalli Village from Ramachandrappa House to Nanjappa House CC Road 67000 67000 67000 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Bridge Construction Work at Guntiganapalli Village(S.C. Colony) Bridge work 100000 100000 100000 Completed Chikkaballapura Bagepalli Pathapalya 2007-08 Cement road work at Boorugumadagu Village A.D. Colony Mainroad to Nanjappa House CC Road 164000 164000 164000 Completed

Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Devarajapalli Village from S.C.Colony Peddanna House to temple CC Road 0 0 0 Completed Cement Road work at Gujjepalli Village from A.K.Colony Maddinarayanappa House Chikkaballapura Bagepalli Pathapalya 2008-09 CC Road 0 0 0 Completed Ramakrishnappa House Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Pathakote Village from Rangappa House to Kumbara Erappana House CC Road 0 0 0 Completed

Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Pathapalya Village from A.K.Colony Gangaraju house to Gundappa House CC Road 0 0 0 Completed

Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Pathapalya Village from Maseedi to Coffee Pouder Chalapathy House CC Road 0 0 0 Completed Road development Work at Pathapalya Village from Eshwaragattu Ameer house to Tailer Chikkaballapura Bagepalli Pathapalya 2008-09 CC Road 0 0 0 Completed Rahimsabhi house Road Development Work at Sakkanappagaripalli Village from A.K.Colony Cha||Venkatramappa Chikkaballapura Bagepalli Pathapalya 2008-09 CC Road 0 0 0 Completed House Thimmanna House Chikkaballapura Bagepalli Pathapalya 2008-09 Road Work at Kothuru Village from S.K.Colony CC Road 0 0 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Pitching and drainage work at Pathapalya Village from Yarrajenugutta Drainage 0 0 0 Completed Drainage And Pitching Work at Pathapaly Village from Teliphone Exchange venkatachalapathy Chikkaballapura Bagepalli Pathapalya 2008-09 Pitching Work 0 0 0 Completed House to Manju House Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Burugamadugu Village from Main Road to Nanjappa House CC Road 20000 20000 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Singappagaripalli Village from Honnurappa House to Venkatareddy House CC Road 58000 58000 0 Completed

Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Buttivaripalli Village from Gangamma house to Pothulappa House CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Giriyappalli Village from Main Road to Nanjappa house CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Kanagamakalapalli Village from Main road to Dasappa House CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Nadumpalli Village from Main Road to School CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Solamakalapalli Village from Kukkala Narasimhappa House to temple CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at thummepalli Village From Srinivasa House to Krishnappa House CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Construction of Stores at Pathapalya Gram Panchayath Construction of Gram Panchayat121100 Building 121100 0 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Muthinapalli Village from Narayanappa House to Chinnakadirappa House CC Road 60000 60000 60000 Completed

Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Kanagamakalapalli Village from Venkatalakshmamma House to A.D.Colony CC Road 65000 65000 65000 Completed

Chikkaballapura Bagepalli Pathapalya 2008-09 Cement Road work at Nallamallepalli Village from A.K.Rangappa House to Anjinapa House CC Road 65000 65000 65000 Completed Chikkaballapura Bagepalli Pathapalya 2008-09 Reveetment Work at Guntiganapalli Village from A.K.Colony other works 65000 65000 65000 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Constrcution of School Building at Gudipalli Village School Compound and Buildings30000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Singappagaripalli Village from Main Road to Sriramappa House CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2009-10 Drainage work at Gujjepalli Village from Gengireddy House to Maddireddy House Drainage 40000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Kottur village CC Road 130000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2009-10 Constrcution of Anganavaadi Building at KamasanampalliVillage Anganavadi building 40000 40000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Kogarollapalli Village CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Giriyappalli Main Road to Narayanappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Gondipalli Village CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Muddalakhane Village from School to Shivareddy House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Somakalapalli Village from Erappa House to Pimp House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Tummepalli Village from Main Road to Venkatrayappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Varadayyagaripalli Main Road to Venkatappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Drainage work at Sangatapalli Village from Tipparaju House to Banyana Tree Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Expenditure on Literacy Programme IEC 59000 59000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Guntiganapalli Village from Seenappa House to Ramappa House CC Road 65000 65000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Buttivariapalli Village from Adinarayanappa House to Ashwathappa House CC Road 75000 75000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Constrcution of Anganavaadi Building at Pathakote Village Anganavadi building 80000 80000 0 Completed Cement Road work at Kanagamakalapalli Village from venkatramappa House to Adimurthy Chikkaballapura Bagepalli Pathapalya 2009-10 CC Road 100000 100000 0 Completed House Chikkaballapura Bagepalli Pathapalya 2009-10 Constrcution of Godowns at Pathapalya village Construction of Gram Panchayat150000 Building 150000 0 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Guttamidapalli Village CC Road 40000 40000 40000 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Buttivaripali Village from S.C Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Nallamallepalli Village from A.K. Rangappa House to Anjinappa House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at PeddaThanda from Systen to Maddilamma House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Pathapalya 2009-10 Cement Road work at Pathapalya Village from Yerra Jenugutta to Subhan House to Water Systen CC Road 123000 123000 123000 Completed

Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Buttivaripalli Village from lakshmipathy House to Narayanappa House CC Road 30000 0 0 Completed Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at giriyappalli Village Main Road To Narasimhappa House CC Road 30000 0 0 Completed Cement road work at Kanagamakalapalli Village from Chikkanarasimhappa store to Mopurappa Chikkaballapura Bagepalli Pathapalya 2010-11 CC Road 30000 0 0 Completed House Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Muthanapalli Village from Peddanna house to kogaramarappa House CC Road 30000 0 0 Completed Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Nadumpalli Village Infront of Village CC Road 30000 0 0 Completed Cement road work at Nallamallepalli Village from S.K.Colony Sanjeevappa House to Chikkaballapura Bagepalli Pathapalya 2010-11 CC Road 30000 0 0 Completed Pillavenkatappa House Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Solamakalapalli Village from S.C.Colony CC Road 30000 0 0 Completed Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Thummepalli Village from Main road Gangamma Temple CC Road 30000 0 0 Completed Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Varadayyagaripalli Village from Anandappa House to Chinnappa House CC Road 30000 0 0 Completed Construction of Drainage work at Maddalakhane Village from infront of Bubudake Ramanna Chikkaballapura Bagepalli Pathapalya 2010-11 Drainage 30000 0 0 Completed House Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Singappagaripalli Village from Venkatareddy House to Ramappa House CC Road 30000 0 0 Not Started Road development work at bairannagaripalli Village from Sriramappa House to Narasimhappa Chikkaballapura Bagepalli Pathapalya 2010-11 CC Road 30000 0 0 Not Started house Chikkaballapura Bagepalli Pathapalya 2010-11 Water Tank And Pipe Line work at Pathapalya Village for T.B Water Tank 30000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Drainage work at Nallasanampalli Village infront of Govt. School Drainage 32000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Buttivaripalli Village from S.C.Colony CC Road 40000 0 0 Completed Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Guntiganapalli Village from Sanjeevappa House Chowdappa House CC Road 40000 0 0 Completed Cement road work at Kanagamakalapalli Village From Tailer Venkatarama House to Chikkaballapura Bagepalli Pathapalya 2010-11 CC Road 40000 0 0 Completed Krishnamurthy House Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Gondipalli Village CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Gujjepalli Village from Ramakrishna House to amarappa House CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Kothuru Village CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Gudipalli Village CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Installation of Water systen at Pathapalya Village infront of Rama Temple Drinking Water Supply 50000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Compound work at Pathapalya Village from Govt. School Compound wall 58000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Kamasanampalli Village from venkatareddy House to Gummareddy House CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Construction of Roof at Pathapaly Village in Stores Repair Works 70000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 I.E.C. Programme IEC 80000 0 0 Not Started Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Buragamadugu Village From Gangamma Temple to A.D.Chinnappa House CC Road 92000 0 0 Completed Chikkaballapura Bagepalli Pathapalya 2010-11 Cement road work at Kemppayyathanda Village from Hanumenaik to Sevenaik House CC Road 133000 0 0 Completed Chikkaballapura Bagepalli Puligal 2006-07 Cement Road Work at Pulagantivaripalli Village infront of Samudaya Bhavana CC Road 50000 50000 0 Completed Cement Road Work at Sajjulavaripalli Village from Eshwarappa House to Balreddypalli Chikkaballapura Bagepalli Puligal 2006-07 CC Road 50000 50000 0 Completed Narasimhappa House Chikkaballapura Bagepalli Puligal 2006-07 Constrcution of School Compound at Puligal Village at H.P.S School Compound wall 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2006-07 Constrcution of School Compound at Srinivasapura Village from H.P.S School Compound wall 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2006-07 Cement Road Work at Puligal Village from Venkatravanappa House to Eshwara Temple CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Puligal 2006-07 Installation of Electronic Tube lights for all Villages in Puligal Gram Panchayath Construction of Gram Panchayat248000 Building 248000 0 Completed Chikkaballapura Bagepalli Puligal 2006-07 Cement Road Work at Oodavaripali Village from Eshwarappa House to Main Road CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2006-07 Pittching work at Ramanupadi Village from G.V. Subbareddy House to Mulla Mulla Road CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2007-08 Cement road work at Puligal Erappa House to Balareddypalli Narasimhappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2007-08 Cement road work at Puligal Village from Erappa House to Main Road CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2007-08 Pittching Work at Puligal Village from G.V. Subbareddy House to Main Road CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2007-08 Constrcution of L.P.S School Compund in Puligal Grama panchayath Compound wall 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2007-08 Purchasing of instruments for repair of Water Pipelines(for All Gramas) Pipeline 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2007-08 Cement road work infront of Samudaya Bhavana (Puligal Gram Panchayath) CC Road 54000 54000 0 Completed Chikkaballapura Bagepalli Puligal 2007-08 Cement road work at Puligal Village from Manandi Venkatravanappa House to Eshwar Temple CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Puligal 2007-08 Electronic Tube Lights for All Gramas in Puligal Gram Panchayath Construction of Gram Panchayat300000 Building 300000 0 Completed Chikkaballapura Bagepalli Puligal 2007-08 Cement road work at Puligal Village from Temple to Tippanna House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2007-08 Pittching Work at Puligal Village from Venkatravana House to Byreddy House Pitching Work 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2007-08 Cement road work at Puligal Village from Tippanna House to Ravi House CC Road 75000 75000 75000 Completed Chikkaballapura Bagepalli Puligal 2008-09 Cement Road work at Seethareddypalli Village from Govt.school to Erappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2008-09 Cement Road work at Nallasanampalli Village Gorla Lakshmanareddy house to Temple CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2008-09 Cement Road work at Uduvaripalli Village from Satharsab House to Vemanna House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2008-09 Construction of school kitchen room at Ramanupadi Village Kitchen Room 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2008-09 Pitching work at Gollapalli Village from Ramachandrappa House to Myakala Ramappa House Pitching Work 50000 50000 0 Completed

Chikkaballapura Bagepalli Puligal 2008-09 Pitching work at Bellampalli Village from yagavinti Beerappa House to B.N.Shankarappa House Pitching Work 50000 50000 0 Completed

Chikkaballapura Bagepalli Puligal 2008-09 Pitching work at Srinivsapura Village from K.R.Eshwarayya House to Bestha Narasimhappa House Pitching Work 57000 57000 0 Completed Chikkaballapura Bagepalli Puligal 2008-09 Cement Road work at Sajjulavaripalli Village from Systen to Billur Achari House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Puligal 2008-09 Construction of Gram Panchayath Building at Puligal Gram Panchayath Construction of Gram Panchayat380000 Building 380000 0 Completed Chikkaballapura Bagepalli Puligal 2008-09 Drainage work at Gandipura Village from Narasimhappa House to Yallappa House Drainage 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2008-09 Pitching work at uduvaripalli Village from Erappa House to avula Peddayappa House Pitching Work 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2008-09 Pitching work at Puligal Village from Ganesh House to Main road Pitching Work 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2008-09 Pitching work at Ramanupadi Village from Rajappa House to Myakala Subbanna House Pitching Work 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2008-09 Pitching work at Myakalapalli Village from Patala Yamagari House to Venkataramappa House Pitching Work 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Puligal Main Road CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Ragimakalapalli Village From Battala Venkatareddy House CC Road 50000 0 0 Not Started Chikkaballapura Bagepalli Puligal 2009-10 Drainage work at gandhipur village from Yellapa House to Main Road Drainage 50000 0 0 Not Started Chikkaballapura Bagepalli Puligal 2009-10 Expenditure on Literacy Programme IEC 79000 0 0 Not Started Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Ooduvaripalli Village from Main Road to Ravi House CC Road 100000 0 0 Not Started Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Sajjulavaripalli from Avula Venkatrayappa House CC Road 100000 0 0 Not Started Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Bellampalli S.T Colony Anjaneyappa House to Patel Ramanna House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Gollapalli Maddireddy House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Piligal Kallu Venkatrayappa House to Water Tank CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Ramachandrapur S.C. Colony Venkatrayappa House to Shivanna House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Ramanupadi Main Road to Myakalapalli Maranna House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Seethareddypalli Near Bhovi Colony CC Road 50000 50000 0 Completed Drainage work at Myakalapalli S.C.Colony D.N Venkatravanappa House to Venkatravanappa Chikkaballapura Bagepalli Puligal 2009-10 Drainage 50000 50000 0 Completed House Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Nanjundappa House to Bhajnathri Kittanna House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2009-10 Cement Road work at Vantarivandlapalli Main Road to Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Puligal 2010-11 I.E.C.Programme Purpose IEC 52000 0 0 Not Started Chikkaballapura Bagepalli Puligal 2010-11 Construction of Gram Panchayath Building In Puligal Construction of Gram Panchayat600000 Building 0 0 Not Started Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Development at KallorollapalliVillage CC Road 30000 30000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Work at Mamidimaklapalli Village from Main Road CC Road 30000 30000 0 Completed Cement Road Work at Digavagollapalli Village from Reddy Bayyappa House to Gari Ramappa Chikkaballapura Bagepalli Rashcharavu 2006-07 CC Road 35000 35000 0 Completed House Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Work at Somakalapalli Village from Main Road CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Work at Somaklapalli Village from Main Road to Venkatappa House CC Road 60000 60000 0 Completed Cement Road Work at Narayanapalli Village from Kamasala Krishnappa House to Seethamma Chikkaballapura Bagepalli Rashcharavu 2006-07 CC Road 75000 75000 0 Completed House Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Work at Rashcheruvu Village CC Road 91000 91000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2006-07 Electrinic Goods Repair in Rascherruvu Gram Panchayath Construction of Gram Panchayat99000 Building 99000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Work at Kadirannagarikote Village from Water Systen to Papanna House CC Road 30000 30000 30000 Completed Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Work at Devarmakalapalli Village in S.C Colony CC Road 35000 35000 35000 Completed Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Work at Gaddampalli Village from Ramaswamy Temple to A.K. Colony CC Road 35000 35000 35000 Completed Chikkaballapura Bagepalli Rashcharavu 2006-07 Cement Road Work at Majunathapura Village from Hanumanthu House CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Pipe line and water tank at Doranalapalli Village near Babusab House Water Tank 40000 40000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Cement road work at Digavagollapalli Village From Ramireddy house to S.C.Colony CC Road 40000 40000 0 Completed Cement road work at Mamidimakalapalli Village from Shankarareddy houde to Manjunatha Chikkaballapura Bagepalli Rashcharavu 2007-08 CC Road 40000 40000 0 Completed House Chikkaballapura Bagepalli Rashcharavu 2007-08 Cement road work at Musliganapalli Village Chelur Gangulappa House CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Cement road work at Thurekeshipalli Village Infront of Maddireddy House CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Cement road work at ramaswamypalli Village from Main Road to Temple CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Cement road work at Kurubavandlapalli Village from Nagappa House to Gamgulappa House CC Road 80000 80000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Shelter Roof for travellers and Provision Stores from Bus stand at Rascheruvu Bus Stand 166523 166523 0 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Cement road work at Devaramakalapalli Village from S.C.Colony infront of narasimhappa House CC Road 40000 40000 40000 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Cement road work at kondoorpalli village from S.C. Colony G.R. Srinivasalu house CC Road 40000 40000 40000 Completed Chikkaballapura Bagepalli Rashcharavu 2007-08 Cement road work at Turkeshpalli Village from S.C. Gangulappa House CC Road 40000 40000 40000 Completed Cement road work at Narayanapalli Village from S.C. Colony Seethamma House to C.Krishnappa Chikkaballapura Bagepalli Rashcharavu 2007-08 CC Road 60000 60000 60000 Completed House Chikkaballapura Bagepalli Rashcharavu 2008-09 Water Suply Work at Rascheruvu Gram Panchayath from All Villages Construction of Gram Panchayat36000 Building 36000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2008-09 Cement Road work at Digavagollapalli Village from Infront of Ramireddy House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2008-09 Cement Road work at Doranalapalli Village from Srinivasa House to Vaddi Venkatappa house CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2008-09 Cement Road work at Kothapalli Villge from Tyarappa house to Maddireddy House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2008-09 Cement Road work at Kurubarapalli Village from Infront of Nagappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2008-09 Cement Road work at Musliganapalli Village from Infront of Chelu Gangulappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2008-09 Construction of Drain at Manjunathapura Village from Near Near Gangappa House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2008-09 Cement Road work at Ramaswamypalli Village from Main road ro Temple CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2008-09 Drainage work at Rascheruvu Village from Khajasab House to Ameersab House Drainage 70000 70000 0 Completed Drainage Work at Rascheruvu Village from Pula Mahaboobi Sabi House to Chikkaballapura Bagepalli Rashcharavu 2008-09 Drainage 80000 80000 0 Completed M.Venkatanarayanappa House Cement Road work at Arigevaripalli Village from Vishwanathareddy House to Kunti Maramma Chikkaballapura Bagepalli Rashcharavu 2008-09 CC Road 100000 100000 0 Completed temple Chikkaballapura Bagepalli Rashcharavu 2008-09 Cement Road work at Rascheruvu Village from S.C.Colony CC Road 50000 50000 50000 Completed Cement Road work at Somakalapalli Village from D.N.Srinivasappa house to Ramakrishnappa Chikkaballapura Bagepalli Rashcharavu 2008-09 CC Road 50000 50000 50000 Completed house Chikkaballapura Bagepalli Rashcharavu 2008-09 Construction of Drain at Turukeshipalli Village from Near School Drainage 50000 50000 50000 Completed Cement Road work at Narayanapalli Village from S.C.Colony T.reddappa house to T.Siddappa Chikkaballapura Bagepalli Rashcharavu 2008-09 CC Road 90000 90000 90000 Completed House Chikkaballapura Bagepalli Rashcharavu 2009-10 Remaining Work of Constrcting of Godowns at Rashcheruvu Village Construction of Gram Panchayat50000 Building 0 0 Not Started Chikkaballapura Bagepalli Rashcharavu 2009-10 Cement Road work at Digavagollapalli Village from Reddappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2009-10 Cement Road work at Narayanapalli Village from C. Krishnappa House CC Road 50000 50000 0 Completed Cement Road work at Ramaswamipalli Village from Agasa Phakeerappa House to Pedda Chikkaballapura Bagepalli Rashcharavu 2009-10 CC Road 50000 50000 0 Completed Venkatravana House Chikkaballapura Bagepalli Rashcharavu 2009-10 Cement Road work at Somakalapali Village from Ramakrishnappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2009-10 Construction of School Compound at Gaddapalli Village Compound wall 50000 50000 0 Completed Chikkaballapura Bagepalli Rashcharavu 2009-10 Drainage work at Rashcheruvu Village from Venkatravanappa House to Ameer saabi House Drainage 69000 69000 0 Completed Cement Road work at Devaramakalapalli Village from Venkataswamy House to Lakshminarayana Chikkaballapura Bagepalli Rashcharavu 2009-10 CC Road 50000 50000 50000 Completed House Chikkaballapura Bagepalli Rashcharavu 2009-10 Cement Road work at Doranalapalli Village from Vaddi Peddavenkatrayappa House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Rashcharavu 2009-10 Cement Road work at Kadirannagarikote Village from Narasappa House to Ramappa House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Rashcharavu 2009-10 Cement Road work at Musiliganapalli Village from Narasanaik House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Rashcharavu 2009-10 Expditure on Literacy Programme IEC 60000 60000 60000 Completed Chikkaballapura Bagepalli Rashcharavu 2009-10 Drainage Work at Reddyganahalli Village infront of Balaram House Drainage 90000 90000 90000 Not Started Chikkaballapura Bagepalli Rashcharavu 2010-11 Gram Panchayath Building Repair Work at Rascheruvu village Building Repair 30000 0 0 Not Started Chikkaballapura Bagepalli Rashcharavu 2010-11 Cement Road work at Kondorpalli Village Infront of A.K.Colony CC Road 35000 0 0 Not Started Chikkaballapura Bagepalli Rashcharavu 2010-11 Cement Road work at Thurikeshipalli Village from Mangama House to Peddakka House CC Road 35000 0 0 Not Started Cement Road work at Digavagollapalli Village from Ankireddy Shivareddy House Venkatrayappa Chikkaballapura Bagepalli Rashcharavu 2010-11 CC Road 35000 0 0 Not Started House Chikkaballapura Bagepalli Rashcharavu 2010-11 Cement Road work at Pyayalavaripalli Village from Ramireddy House to Manjunathareddy House CC Road 35000 0 0 Not Started

Chikkaballapura Bagepalli Rashcharavu 2010-11 Cement Road work at Ramaswamypalli Village From S.C.Colony infront of Samudaya Bhavan CC Road 40000 0 0 Not Started Cement Road work at Devaramakalapalli Village from Main Road to infront of Chikkaballapura Bagepalli Rashcharavu 2010-11 CC Road 40000 0 0 Not Started D.R.Lakshminarayana house Chikkaballapura Bagepalli Rashcharavu 2010-11 Cement Road work at Musliganapalli Village from infront of Gangulappa House CC Road 40000 0 0 Not Started Chikkaballapura Bagepalli Rashcharavu 2010-11 Cement Road work at Doranalapalli Village from Temple to Narayanareddy House CC Road 50000 0 0 Not Started Cement Road work at Narayanapalli Village from Nadumpalli Venkatrayappa House to Chikkaballapura Bagepalli Rashcharavu 2010-11 CC Road 60000 0 0 Not Started K.Seenappa House Chikkaballapura Bagepalli Rashcharavu 2010-11 Cement Road work at Reddyganapalli Village Infront of Balaram House CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Rashcharavu 2010-11 Drainage work at Rascheruvu Village from sabi House to ameer sab House Drainage 80000 0 0 Not Started Chikkaballapura Bagepalli 2006-07 Cement Road Work and construction of School Compound at Digavanettakuntapali Village CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Somanathapura 2006-07 Cement Road Work at Cheemannnagaripalli Village CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Somanathapura 2006-07 Cement Road Work at Rachavaripalli Village CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Somanathapura 2006-07 Cement Road Work at Sheegalapalli Village CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Somanathapura 2006-07 Cement Road Work at Somanathapura Gram Panchayath CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Somanathapura 2006-07 Constrcution of Box Type Drainage at M.M. Palli Drainage 60000 60000 0 Completed Chikkaballapura Bagepalli Somanathapura 2006-07 Construction of Gram Panchatha Buildinat at Somanathapur Gram Panchayath Construction of Gram Panchayat118000 Building 118000 0 Completed Chikkaballapura Bagepalli Somanathapura 2006-07 Cement Road Work at Egavanettakuntlapalli Village CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Somanathapura 2006-07 Construction of Samudaya Bhaana at Doddipalli Community Hall 60000 60000 60000 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Road Development work to Doddipalli Village(Devaripalli) CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Cement road work at Boodalapalli Village infront of Ramappa House CC Road 50000 50000 0 Completed V.Shape Drainage and Cement Road Construction at Somanathapur Village from Nanjundappa Chikkaballapura Bagepalli Somanathapura 2007-08 CC Road 60000 60000 0 Completed House to Gangamma Temple Chikkaballapura Bagepalli Somanathapura 2007-08 Cement road work at Chinnaganapalli village from Ashwathakatte to Anjaneya Temple CC Road 80000 80000 0 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Cement road work at P.W.D Road to Government School CC Road 80000 80000 0 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Cement road work and Water Tank construction at Cheemannagaripalli Village CC Road 90000 90000 0 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Construction of Gram Panchayath Building at Somanathapur Village Construction of Gram Panchayat118000 Building 118000 0 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Construction of Mini Tank at Digavanettakuntapalli Village Water Tank 130000 130000 0 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Kolave Bavi Nirvana Veccha Drinking Water Supply 38000 38000 38000 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Cement road work at Kuruppalli Village from Nagaraju House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Cement road work at Marimakalapalli Village from P.W.D Road to Village Road CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Cement road work at Seegalapalli Village from Main Road to Village CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Somanathapura 2007-08 Cement road work at Doddipalli Village from Anjinappa House to Banyan Tree CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at cheemannagaripalli Village from Uthyreddy House to Venkatravana House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Kurappalli Village from School To Nagaraju House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at M.M.Palli Village from main road to Temple CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Marimakalapalli Village from P.W.D Road to Village road CC Road 50000 50000 0 Completed Cement Road work at Nakkapalli Village from Venkataravanappa House to Venkatarayappa Chikkaballapura Bagepalli Somanathapura 2008-09 CC Road 50000 50000 0 Completed House Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Sheegalapalli Village from P.W.D.Road to Village road CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Drainage work at Gotlapalli Village from behind the Systen Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Construction of Miny Tank at Digavanettakuntapalli Village Water Tank 100000 100000 0 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Construction of Panchayatha Building at Somanathapura Construction of Gram Panchayat200000 Building 200000 0 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Gundamvaripalli Village CC Road 30000 30000 30000 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Budalapalli Village from infront of gurikalla Ramanna House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Chinnaganapalli Village from Main road to Venkataravanappa House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Devarlapalli Village from Doddipalli Village road CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Doddipalli Village CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Rechavaripalli Village from S.C.Colony Systen to Temple CC Road 50000 50000 50000 Completed Drainage and Cement Road work at Somanathapur Village from Nanjundappa House School Chikkaballapura Bagepalli Somanathapura 2008-09 CC Road and Drainage 50000 50000 50000 Completed Road Chikkaballapura Bagepalli Somanathapura 2008-09 Cement Road work at Egavabettakuntapalli Village from banyan tree to Gangamma House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Drainage at Marimakalapalli Village Drainage 30000 30000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Drainage work at Kurupalli Venkataswami House to Pump House Drainage 30000 30000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Construction of Water Tank at Somnathpura infront of K.E.B Water Tank 30000 30000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Construction of Water Tank at Nakkalapalli Village Water Tank 30000 30000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Drainage wrok at Cheemannagaripalli Village from Water Tank to Anganavadi building Drainage 40000 40000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Drainage wrok at Gotlapalli Water Tank to Lake Drainage 40000 40000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Drainage wrok at Yagavanetakuntapalli Erappa House to Anjinappa House Drainage 40000 40000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Cement Road work at Somanathpura Main Road to Library Construction Of Library 50000 50000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Construction of Water Tank and Pipeline at Yagavanettakuntapalli Village Pipeline 50000 50000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Construction of School Compound at Sheegalapalli Village Compound wall 54000 54000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Remaining construction work of Somnathpura Gram Panchyath Office Construction of Gram Panchayat100000 Building 100000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Expenditure on Literacy Programme IEC 160000 160000 0 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Drainage work at Chinnaganapalli Gurrappa House to Narayanswami House Drainage 30000 30000 30000 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Drainage work at Doddapalli Village Drainage 30000 30000 30000 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Drainage work at M.M. Palli Ramanna House to Nanjundappa House Drainage 30000 30000 30000 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Construction of Digavanettakuntapalli Colony other works 30000 30000 30000 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Construction of Water Tank at Boodalapalli Village Water Tank 30000 30000 30000 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Constrcution of Water Tank at Rachavaripalli Water Tank 30000 30000 30000 Completed Chikkaballapura Bagepalli Somanathapura 2009-10 Constrcution of Water Tank at Devarlapalli Colony Water Tank 30000 30000 30000 Completed Chikkaballapura Bagepalli Somanathapura 2010-11 Compound work at Budalapalli Village from HP.S. Schoole Builsing Compound wall 45000 0 0 Not Started Chikkaballapura Bagepalli Somanathapura 2010-11 Compound work at devarlapalli Village from L.P.S. Schoole Builsing Compound wall 50000 0 0 Not Started Chikkaballapura Bagepalli Somanathapura 2010-11 Compound work at Doddivaripalli Village from H.P.S. Schoole Builsing Compound wall 50000 0 0 Not Started Chikkaballapura Bagepalli Somanathapura 2010-11 Compound work at Marimakalapalli Village from HP.S. Schoole Builsing Compound wall 50000 0 0 Not Started Chikkaballapura Bagepalli Somanathapura 2010-11 Compound work at Sheegalapalli Village from HP.S. Schoole Builsing Compound wall 50000 0 0 Not Started Chikkaballapura Bagepalli Somanathapura 2010-11 Draine work at Rachavaripalli Village from S.T.Colony Drainage 50000 0 0 Not Started Chikkaballapura Bagepalli Somanathapura 2010-11 Draine work at yagavanettakuntapalli Village from S.T.Colony Drainage 53000 0 0 Not Started Chikkaballapura Bagepalli Somanathapura 2010-11 Cement Road work at Somanathapur Village From S.C.Colony Dairy to guttapalya Village road CC Road 100000 0 0 Not Started Chikkaballapura Bagepalli Somanathapura 2010-11 Compound work at Somanathapur village in Gram Panchayatha Building Compound wall 200000 0 0 Not Started Chikkaballapura Bagepalli Thimmampalli 2006-07 Cement Road Work at Kotthur Village from Temple to Ramchandrappa House CC Road 64000 64000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2006-07 Cement Road Work at Thimmapalli Village from Drainage to Peddasubbanna House CC Road 98000 98000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2006-07 Cement Road Work at Chenchurayanapalli Village from Main Road to Lakshminaasappa House CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2006-07 Cement Road Work at Kammaravaripalli Village from Banyan Tree to Srirama Temple CC Road 128000 128000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2006-07 Cement Road Work at Gundlapalli Village from Nagarajappa House to Nanjundappa House CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Thimmampalli 2006-07 Cement Road Work at Jiginivandlapalli Narayanappa House to Narasimhappa House CC Road 96000 96000 96000 Completed Chikkaballapura Bagepalli Thimmampalli 2006-07 Cement Road Work at Kannampalli Village from Venkatramappa House to Chowdappa House CC Road 96000 96000 96000 Completed Chikkaballapura Bagepalli Thimmampalli 2007-08 Cement road work at Gujjepalli Village from Main road to Gangulappa House CC Road 25000 25000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2007-08 Cement road work at Chenchurayanapalli Village from Banyan Tree to Samudaya Bhavana CC Road 90000 90000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2007-08 Cement road work at MarasanapalliVillage Main road to Poolappagari Rajappa House CC Road 95000 95000 0 Completed Cement road work at Bramhanarahalli village from Akula Venkatramappa House to Balappa Chikkaballapura Bagepalli Thimmampalli 2007-08 CC Road 99000 99000 0 Completed House Chikkaballapura Bagepalli Thimmampalli 2007-08 Cement road work Infront of Temple at Digavamaddalakhane Village CC Road 113000 113000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2007-08 Drainage work at Madakavaripalli Village From Yarrappa House to Lake Drainage 174000 174000 0 Completed Cement road work at Mittavandlapalli Village from S.C. Colony gangamma Temple to Chikkaballapura Bagepalli Thimmampalli 2007-08 CC Road 85000 85000 85000 Completed Narayanappa House Chikkaballapura Bagepalli Thimmampalli 2007-08 Cement road work at Naravulapalli Village from ChikkaNanjappa House to infront of School CC Road 170000 170000 170000 Completed Chikkaballapura Bagepalli Thimmampalli 2008-09 Water Suply Work at Thimmampalli Gram Panchayatha From All Villages Construction of Gram Panchayat20000 Building 20000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2008-09 Cement Road Work at Mullangicgetlapalli Village from infront of Barcode Venkatappa House CC Road 120000 120000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2008-09 Schoole Compound Work at Kothuru Village Compound wall 50000 50000 50000 Completed Chikkaballapura Bagepalli Thimmampalli 2008-09 Construction of Gram Panchayath Building at Thimmampalli Construction of Gram Panchayat50000 Building 50000 50000 Completed Cement Road Work at Doranalapalli Village from Chikkanarasimhappa House to Shivamma Chikkaballapura Bagepalli Thimmampalli 2008-09 CC Road 60000 60000 60000 Completed house Chikkaballapura Bagepalli Thimmampalli 2008-09 Cement Road Work at Kanampalli Village from S.T.Maddilety House to Srirama House CC Road 120000 120000 120000 Completed Chikkaballapura Bagepalli Thimmampalli 2009-10 Drainage work at Madakavaripalli Village Drainage 40000 40000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2009-10 Cement Road work at Gukkavandlapalli Village from Narasimhappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2009-10 Constrcution of Compound at G.Maddepalli Cross to Health Ghataka Compound wall 50000 50000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2009-10 Expenditure of Literacy Programme IEC 50000 50000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2009-10 Cement Road work at Doranalapalli Village from Subbanna House to Main Road CC Road 57000 57000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2009-10 Cement Road work at Gangireddypalli Village infront of Vaddi Yarranna House CC Road 60000 60000 0 Completed Cement Road work at Gundlapalli Village from Venkatramappa House to Sanappa Narayanappa Chikkaballapura Bagepalli Thimmampalli 2009-10 CC Road 60000 60000 0 Completed House Chikkaballapura Bagepalli Thimmampalli 2009-10 Cement Road work at Bramhanarahalli Village from Main Road to Mandimu Narayanappa House CC Road 70000 70000 0 Completed Chikkaballapura Bagepalli Thimmampalli 2009-10 Cement Road work at G.Maddepalli Village infront of Bahsasaab House CC Road 125000 125000 0 Completed cement Road work at Chenchurayanapalli Village from A.K. Colony Gangamma House to Gitta Chikkaballapura Bagepalli Thimmampalli 2009-10 CC Road 40000 40000 40000 Completed Bodeppa House Chikkaballapura Bagepalli Thimmampalli 2009-10 Cement Road work at Chenchurayanapalli Village from S.T. Sriramappa House to Ramula Temple CC Road 90000 90000 90000 Completed

Chikkaballapura Bagepalli Thimmampalli 2009-10 Cement Road work at Guttapalya Village S.T. Colony Ravanappa House to Venkatappa House CC Road 95000 95000 95000 Completed Chikkaballapura Bagepalli Thimmampalli 2009-10 Cement Road work at Tattannagaripalli Village from Marappa House to Main Road CC Road 95000 95000 95000 Completed Chikkaballapura Bagepalli Thimmampalli 2010-11 I.E.C. Programme Purpose IEC 30000 0 0 Not Started Chikkaballapura Bagepalli Thimmampalli 2010-11 Drainage work at Kannampalli Village from Narasimhappa House to Sriramappa House Drainage 50000 0 0 Not Started Chikkaballapura Bagepalli Thimmampalli 2010-11 Drainage work at Naravulapalli Village from anjinappa House to Main road Drainage 50000 0 0 Not Started Chikkaballapura Bagepalli Thimmampalli 2010-11 Cement road work at Kothuru Village from Nagappa House to Main road CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Thimmampalli 2010-11 Cement road work at Maravapalli Village from rangappa House to Main road CC Road 70000 0 0 Not Started Chikkaballapura Bagepalli Thimmampalli 2010-11 Cement road work at Gundlapalli Village from main road Karri Venkatramappa House CC Road 90000 0 0 Not Started Cement road work at Mittavandlapalli Village from Chinna Akkulappa House to Pujari Akkulappa Chikkaballapura Bagepalli Thimmampalli 2010-11 CC Road 100000 0 0 Not Started House Chikkaballapura Bagepalli Thimmampalli 2010-11 Cement road work at Thimmampalli Village from A.D.Colony CC Road 100000 0 0 Not Started Chikkaballapura Bagepalli Thimmampalli 2010-11 Cement road work at boyinavaripalli Village from Main Road to Chowdappa House CC Road 120000 0 0 Not Started Chikkaballapura Bagepalli Tholipally 2006-07 Drainage work at Kondamvaripalli School to Venkatravanappa House Drainage 50000 50000 0 Completed Drainage work at Nandeppagaripalli Village from Neeraganti Narsimhappa House to Gangulappa Chikkaballapura Bagepalli Tholipally 2006-07 Drainage 50000 50000 0 Completed House Chikkaballapura Bagepalli Tholipally 2006-07 Installation of Sodium Lights at Village Solar System 50000 50000 0 Completed Chikkaballapura Bagepalli Tholipally 2006-07 Installation of Sodium lights at Yalagalapalli Village Solar System 59000 59000 0 Completed Chikkaballapura Bagepalli Tholipally 2006-07 Installation of Sodium lights at Thollapalli Village Solar System 59000 59000 0 Completed Chikkaballapura Bagepalli Tholipally 2006-07 Installation of Sodium Lights at Kallipalli Village Solar System 69000 69000 0 Completed Chikkaballapura Bagepalli Tholipally 2006-07 Cement Road Work at Peddareddypalli Village from Raja House to Gangulareddy house CC Road 79000 79000 0 Completed Chikkaballapura Bagepalli Tholipally 2006-07 Drainage work at Thingetidinne from seenappa House to Venkatrvanappa House Drainage 39000 39000 39000 Completed Chikkaballapura Bagepalli Tholipally 2006-07 Pipe Line and Systen work at Gummanayakanapalli Main Road to Sunandamma House CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Tholipally 2006-07 Drainage work at Thollapalli Village from Gittayappa House to Peddanarasimhappa House Drainage 50000 50000 50000 Completed Chikkaballapura Bagepalli Tholipally 2006-07 Cement Road Work at Agatamadaka A.D. Colony CC Road 79000 79000 79000 Completed Chikkaballapura Bagepalli Tholipally 2007-08 Cement Road work at Gummanayakanapalya village from Narasimhappa House to Krisgna House CC Road 50000 50000 0 Completed

Chikkaballapura Bagepalli Tholipally 2007-08 Cement Road work at Kollavaripalli Village From Venkataramappa House To Mathireddy House CC Road 50000 50000 0 Completed Cement Road work at Nallacheruvupalli Village From Venkatarama House To Narasimhappa Chikkaballapura Bagepalli Tholipally 2007-08 CC Road 50000 50000 0 Completed House Chikkaballapura Bagepalli Tholipally 2007-08 Cement Road work at Nandeppagaripali Village From Eshwarappa house To hand Boar CC Road 50000 50000 0 Completed Cement Road work at Nandeppagaripalli Village from sa||Venkatachalapathy House to Chikkaballapura Bagepalli Tholipally 2007-08 CC Road 50000 50000 0 Completed Eashwarappa House Chikkaballapura Bagepalli Tholipally 2007-08 Cement Road work at Sugnanampalli Village from Suryanarayana House to Lakshmipathy House CC Road 50000 50000 0 Completed Cement Road work at Thollapalli Village from Muddakokku Venkararamappa House To Chikkaballapura Bagepalli Tholipally 2007-08 CC Road 50000 50000 0 Completed venkataswamy House Chikkaballapura Bagepalli Tholipally 2007-08 Cement Road work at Thungeidinne Village Seenappa House To Narasimhappa House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Tholipally 2007-08 Drain Work at Nallacheruvupalli Village From Papanna House to Seenappa House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Tholipally 2007-08 Draine work at Thollapalli Village from Munirathnamchari House to jafervali House Drainage 50000 50000 0 Completed Chikkaballapura Bagepalli Tholipally 2007-08 Cement Road work at Adinarayanapura Village From Main Road to Chinnanarayanappa House CC Road 100000 100000 0 Completed

Chikkaballapura Bagepalli Tholipally 2007-08 Cement Road work at Bairepalli Village from A.K.Colony From Gangappa house to Erappa house CC Road 50000 50000 50000 Completed Cement Road work at Thollapalli Village from Venkateshappa House to Pe||Venkataramappa Chikkaballapura Bagepalli Tholipally 2007-08 CC Road 50000 50000 50000 Completed House Chikkaballapura Bagepalli Tholipally 2007-08 Cement Road work at Yarrapentla from Venkataswamy house to Mangamma House CC Road 100000 100000 100000 Completed Chikkaballapura Bagepalli Tholipally 2008-09 Cement Road work at nallacheruvupalli Village From Suban House to Venkataravana house CC Road 60000 60000 0 Completed Cement Road work at thungetidinne Village from Venkataamappa house to chinna Chikkaballapura Bagepalli Tholipally 2008-09 CC Road 60000 60000 0 Completed venkataramappa House Cement draine work at Kondireddypalli Village from Golla Venkataramappa House to Chikkaballapura Bagepalli Tholipally 2008-09 Drainage 60000 60000 0 Completed Bayyareddy House Chikkaballapura Bagepalli Tholipally 2008-09 Draine work at adavikothuru Village from Venkatamma House to ramachandrareddy house Drainage 60000 60000 0 Completed Chikkaballapura Bagepalli Tholipally 2008-09 Construction of pickup at Gummanayakanapalya Village from Near to Lake other works 60000 60000 0 Completed Chikkaballapura Bagepalli Tholipally 2008-09 Cement Road work at Thollapalli Village from Chinnapareddy House Shashi House CC Road 70000 70000 0 Completed Chikkaballapura Bagepalli Tholipally 2008-09 Cement Road work at Nallacheruvupalli Village From Y.C.Road to Balu House CC Road 75000 75000 0 Completed Chikkaballapura Bagepalli Tholipally 2008-09 Cement Road work at Thollapalli Village from Venkataramappa House to Mallisab House CC Road 75000 75000 0 Completed

Chikkaballapura Bagepalli Tholipally 2008-09 Cement Road work at Yarrapentla Village from Venkataramappa House to Jayamma House CC Road 100000 100000 0 Completed

Chikkaballapura Bagepalli Tholipally 2008-09 Draine and Cement Road work at Thollapalli Village from Jafervali House to Riyaj House CC Road and Drainage 131000 131000 0 Completed Cement Road work at Gummavandlappali Village from Chinnachoudareddy House to bayyappa Chikkaballapura Bagepalli Tholipally 2008-09 CC Road 150000 150000 0 Completed House Chikkaballapura Bagepalli Tholipally 2008-09 Cement Road work at Bairepalli Village from Gangappa House to erappa House CC Road 75000 75000 75000 Completed Chikkaballapura Bagepalli Tholipally 2008-09 Cement Road work at Kallipalli Village from A.D.Colony CC Road 75000 75000 75000 Completed Draine work at Thollapalli Village from A.K.Colony from pravision Store center to Venkatanna Chikkaballapura Bagepalli Tholipally 2008-09 Drainage 75000 75000 75000 Completed House Chikkaballapura Bagepalli Tholipally 2009-10 Cement Drainage at Sugnanampalli Village from Lakshmipathi House to Gangulappa House CC Road and Drainage 65000 65000 0 Completed

Chikkaballapura Bagepalli Tholipally 2009-10 Cement Road work at Adinarayanapur Village from Yerrappa House to Venkatanarasappa House CC Road 70000 70000 0 Completed

Chikkaballapura Bagepalli Tholipally 2009-10 Cement Road work at Peddareddypalli Village from Ashwathareddy House to Subbanna House CC Road 70000 70000 0 Completed

Chikkaballapura Bagepalli Tholipally 2009-10 Cement Road work at Agatamadaka Village from Obalappa House to Pedda Bavanna House CC Road 72000 72000 0 Completed

Chikkaballapura Bagepalli Tholipally 2009-10 Cement Road work at Tollapalli Village from Shek Phakruddin House to Bayyappa House CC Road 80000 80000 0 Completed Constrction of Cement Drainage at Yalagalapalli Village from Gengireddy house to Shivanna Chikkaballapura Bagepalli Tholipally 2009-10 Drainage 82000 82000 0 Completed House Chikkaballapura Bagepalli Tholipally 2009-10 Drainage Work at Tollapalli Vilallage from Muttarayappa House to Shivanna House Drainage 85000 85000 0 Completed Chikkaballapura Bagepalli Tholipally 2009-10 Expenditure on I.E.C and H.R.D IEC 189000 189000 0 Completed Chikkaballapura Bagepalli Tholipally 2009-10 Cement Road work at Byrepalli Village from Jayamma House to Narasappa House CC Road 70000 70000 70000 Completed Chikkaballapura Bagepalli Tholipally 2009-10 Cement Road work at Tollapalli Village from Venkatramappa House to Yamanna House CC Road 80000 80000 80000 Completed Cement Road work at Agatamadaka Village from Chinna Venkatrayappa House to Lakshmipathi Chikkaballapura Bagepalli Tholipally 2009-10 CC Road 82000 82000 82000 Completed House Chikkaballapura Bagepalli Tholipally 2010-11 Cement Drainage at Thollapalli Village from Mutharayappa House to Shivappa House Drainage 200000 0 0 Not Started Chikkaballapura Bagepalli Tholipally 2010-11 Construction Of Panchayath Building at Thollapalli Village Construction of Gram Panchayat509000 Building 509000 0 Completed Chikkaballapura Bagepalli Yellampally 2006-07 Cement Road Work at Yallampalli Village from Ramarahtnamma House CC Road 60000 60000 0 Completed Chikkaballapura Bagepalli Yellampally 2006-07 Pitching Work at Tenkayamakalapalli Village Pitching Work 60000 60000 0 Completed Chikkaballapura Bagepalli Yellampally 2006-07 Pitching Work at Shankamvaripalli Village Pitching Work 60000 60000 0 Completed Chikkaballapura Bagepalli Yellampally 2006-07 Construction of H.P.S Compound at Yallampalli Village Compound wall 90000 90000 0 Completed Chikkaballapura Bagepalli Yellampally 2006-07 Construction pf Box Type Drainage in Kaganapalli Village Drainage 90000 90000 0 Completed Chikkaballapura Bagepalli Yellampally 2006-07 Cement Road Work at Achepalli A.K. Colony CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Yellampally 2006-07 Cement Road Work at Laghumaddepalli Village CC Road 60000 60000 60000 Completed Chikkaballapura Bagepalli Yellampally 2006-07 Cement Road Work at Yallampalli Village from Narasimhappa House CC Road 120000 120000 120000 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Box Type Drainage Work at Guvvalavaripalli Village Drainage 46000 46000 0 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Cement road work at Achepalli A.D Colony CC Road 92000 92000 0 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Cement road work at Gurraladinne Village CC Road 92000 92000 0 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Cement road work at Ivarlapalli Village CC Road 92000 92000 0 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Cement road work at Yallampalli Village from Nanjundachari house. CC Road 92000 92000 0 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Cement road work at Yallampalli Village CC Road 100000 100000 0 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Cement road work at Kannakuntipalli Village(S.T. Colony) CC Road 92000 92000 92000 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Cement road work at Patravaripalli Village CC Road 120000 120000 120000 Completed Chikkaballapura Bagepalli Yellampally 2007-08 Cement road work at Maravapalli Village CC Road 138000 138000 138000 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Cement Road Work at achepalli Village from Infront of Papireddy House CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Cement Road Work at Neeraganripalli Village CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Cement Road Work at Yallampalli Village CC Road 50000 50000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Box type Drainage work at Penamale Village Drainage 58000 58000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Drainage Work at Guvvalavaripalli Village Drainage 58000 58000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Construction of Compound Yallampalli Village from school Compound wall 100000 100000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Building work at Yallampalli Village Panchayath Pending Work Construction of Gram Panchayat100000 Building 100000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Cement Road Work at Nakkalavaripalli Village CC Road 116000 116000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Cement Road Work at Pakapatlapalli Village CC Road 150000 150000 0 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Cement road Work at Laghumaddepalli Village from S.C.Colony CC Road 50000 50000 50000 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Box type Drainage work at Yallampalli Village from S.C.Colony Drainage 64000 64000 64000 Completed Chikkaballapura Bagepalli Yellampally 2008-09 Pitching work at Shankamvaripalli Village Pitching Work 100000 100000 100000 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Cement Road work at Neeragantipalli Village from Venkataramappa House to Bavanna House CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Cement Road work at Penumale Village from Temple to Chowdappa House CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Cement Road work at Yellampalli Village at Ashwathanarana Shetty House CC Road 40000 40000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Check Dam at Patravaripalli Village from Venkatareddy Property Check dam 40000 40000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Constrcution of plat Form at Yellampalli Gram Panchayath Office Construction of Gram Panchayat40000 Building 40000 0 Completed Box Type Drainage at Yellampalli Village from Nareppagari Narayanappa House to Chikkaballapura Bagepalli Yellampally 2009-10 Drainage 40000 40000 0 Completed Venkateshappa House Chikkaballapura Bagepalli Yellampally 2009-10 Pipeline Work at Chikkatimmanahalli Village from Sappalamma Temple to Timmayya House Pipeline 40000 40000 0 Completed Pittching work at Shankamvaripalli Village from Venkataravanappa House to Ashwathappa Chikkaballapura Bagepalli Yellampally 2009-10 Pitching Work 40000 40000 0 Completed House Chikkaballapura Bagepalli Yellampally 2009-10 Pittching work at Gollapalli Village from Venkataramappa House to Temple Pitching Work 40000 40000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Pittching work at Gurraladinne Village from Sriram Temple Pitching Work 40000 40000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Expenditure on Literacy Programme IEC 57000 57000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Cement Road work at Lagumaddepalli Village from Venkatasheshareddy House to Water Tank CC Road 80000 80000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Remaining construction work of High School at Yellampalli Village School Compound and Buildings80000 80000 0 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Pipeline Work at Yellampalli Village from S.C. Colony to Well Ramasubbappa House Pipeline 40000 40000 40000 Completed Chikkaballapura Bagepalli Yellampally 2009-10 Construction of Systen and Pipeline Work at Maravapalli Village infront of SC Colony Gopenaik Pipeline 40000 40000 40000 Completed Construction of Systen and Pipeline Work at Kaganapalli Village from S,C Colony chinnerappa Chikkaballapura Bagepalli Yellampally 2009-10 Pipeline 40000 40000 40000 Completed House Chikkaballapura Bagepalli Yellampally 2009-10 Cement Road work at Achepalli Village from S.C Colony to Water Tank Gagulappa House CC Road 80000 80000 80000 Completed Pittching work at Guvvalavaripalli Village from S.C Colony Ramakka house to Narasimhappa Chikkaballapura Bagepalli Yellampally 2009-10 Pitching Work 80000 80000 80000 Completed House Chikkaballapura Bagepalli Yellampally 2010-11 Cement road at Nakkalavaripalli Village S.C.Colony CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Cement Road work at Penamale Village from Nead of Adinarayana Land CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Construction of Cement road at Gurraladinne Village CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Road Development Work at Neeragantipalli Village CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Road Development Work at Guvvalavaripalli Village S.T.Colony CC Road 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Drainage Work at Maravapalli Village Drainage 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Drainage work at Patravaripalli Village Drainage 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Pitching Work at Kaganapalli Village Pitching Work 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Pitching Work at Shankamvaripalli Village Pitching Work 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Pitching work at Gollapalli Village S.T.Colony Pitching Work 30000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Cement Road Work at Laghumaddepalli Village fromS.C.Colony CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Road Development Work at Achepalli Village From S.C.Colony CC Road 60000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 I.E.C Programme Purpose IEC 73000 0 0 Not Started Chikkaballapura Bagepalli Yellampally 2010-11 Draine and Road Development Work at Yallampalli Village CC Road and Drainage 180000 0 0 Not Started