
AGENDA ITEM ST. JOHNS COUNTY BOARD OF COUNTY COMMISSIONERS 11 Deadline for Submission - Wednesday 9 a.m. – Thirteen Days Prior to BCC Meeting 2/2/2021 BCC MEETING DATE TO: Hunter S. Conrad, County Administrator DATE: November 17, 2020 FROM: Phong Nguyen, Transportation Development Manager PHONE: 209-0613 SUBJECT OR TITLE: 2021 Roadway and Transportation Alternatives List of Priority Projects (LOPP) AGENDA TYPE: Business Item, Report BACKGROUND INFORMATION: The Florida Department of Transportation (FDOT) and the North Florida Transportation Planning Organization (TPO) request from local governments their project priorities for potential funding of new transportation projects to be considered for inclusion in the new fiscal year (FY 2026/27) of FDOT’s Work Program. This is an annual recurring request to local governments. The St. Johns County Board of County Commissioners is charged with prioritizing all projects within the County, including those within municipal boundaries. The Transportation Advisory Group (TAG), consisting of County staff, representatives of the City of St. Augustine, St. Augustine Beach, St. Johns County School District, St. Johns County Sheriff’s Office, and the St. Augustine-St. Johns County Airport Authority met on November 20, 2020, to review last year’s priorities and to recommend this year’s priorities. The attached LOPP includes recommendations of the TAG for both highway and alternatives projects. 1. IS FUNDING REQUIRED? No 2. IF YES, INDICATE IF BUDGETED. No IF FUNDING IS REQUIRED, MANDATORY OMB REVIEW IS REQUIRED: INDICATE FUNDING SOURCE: SUGGESTED MOTION/RECOMMENDATION/ACTION: Motion to approve the 2021 St. Johns County Roadway and Transportation Alternatives List of Priority Projects (LOPP) for transmittal to the Florida Department of Transportation and the North Florida Transportation Planning Organization. For Administration Use Only: Legal: BB 1/15/2021 OMB: N/A Admin: Joy Andrews 1/22/2021 2021 LIST OF PRIORITY PROJECTS PROCESS 1) Develop List of Candidate Pro ects (January 2021) a) A list of candidate projects is being developed from the following: • Projects in the previous year List of Priority Projects not funded through construction. • Local County/City submittals within the orth Florida TPO area • Local Port and Transit Authority submittals within the orth Florida TPO area • Adopted Long Range Transportation Plan • Congestion Management System Plan • Concurrency Management Systems • Public Input b) Projects submitted are reviewed by orth Florida TPO Staff using the following criteria: • Project must be within the orth Florida TPO area. • Capacity projects must be in the Cost Feasible List of the Adopted Long Range Transportation Plan. 2) Ranking the List of Candidate Pro ects (February-March) a) TPO Staff develops a preliminary List of Priority Projects to submit to the TCC, CAC and TPO )oard for review and approval. b) Mass transit, port, and aviation projects are prioritized by the submitting agency and forwarded to the TPO for inclusion in the LOPP Document. 3) Submitting the List of Priority Projects (April) Following orth Florida TPO approval, the List of Priority Projects is submitted to FDOT for use in developing the Five ,ear Tentative -or. Program. 2021 RECOMMENDED ST. JOHNS COUNTY ROAD CAPACITY PROJECT PRIORITIES FOR FY 2022/2023 TO 2026/2027 PROPOSED CHANGES 2021 MAJOR PROJECTS WITHIN TPO Road ay Proposed ROADWAY PROJECT DESCRIPTION AREA ID Ranking Regional Funded Projects First Coast Expressway I-95 to (S 17 Ne Road ay (FUNDED 2023) N/A SR 16/CR 208 At I-95 Interchange Area Improvements (FUNDED 2021) N/A Widen to 4 Lanes (includes I-95 overpass) Race Track Rd East Peyton Pkwy to Bartram Springs Pkwy N/A (FUNDED 2025) Regional Priority Projects Final Design, Right-of Way Acquisition & 1 SR 313 (SR 312 Extension) Extension - SR 207 to (S 1 R1 Construction 2 CR 2209 CR 210 to International Golf Pkwy Ne Road ay (6 Lane, R2 3 First Coast Expressway I-95 to (S 17 Ne Road ay (Funded 2023) R3 5 SR 16/CR 208 @ I-95 Interchange Area Improvements (Funded 2020) R4 5 3 Race Track Rd Bartram Park Blvd to East Peyton Pkwy Widen to 4 Lanes R5 R3 . 5 St. Johns Pkwy (CR 2209) @ CR 210 Ne Interchange R6 R5 Interchange at CR 210 (Phase II Add Final Design, Right-of Way Acquisition & 7 8 (S 1/CR 210 Interchange R7 R8 Ramps) Construction 8 . St. Johns Pkwy (CR 2209) CR 210 to SR 9B Widen to 6 Lanes R8 R6 9 7 SR A1A Mickler Rd. to Sa grass Dr W. Widen to 4 Lanes & Bike Lanes - Construction R9 R7 10 9 Palm Valley Rd ICW to Mickler Rd Widen to 4 Lanes R10 R9 11 10 Mickler Rd RoundaAout to SR A1A Widen to 4 Lanes R11 R10 12 11 SR 16 International Golf Pkwy to S. Francis Rd Widen to 4 Lanes R12 R11 13 12 SR 16 S. Francis Rd. to Outlet Mall Entrance Widen to 4 Lanes R13 R12 Ponte Vedra Lakes Blvd to Marshlanding Intersection Improvements recommended Ay 14 5 SR A1A R14 R4 Pkwy/JTB North Ponte Vedra Beach Traffic Study (2016) Intersection Improvements recommended Ay SR A1A Corridor from Mickler Rd to Ponte 15 5 SR A1A Ponte Vedra/Palm Valley Traffic Study ( 2016 R15 R4 Vedra Lakes Blvd. Marsh Landing Pkwy &2017) 16 13 CR 2209 IGP to SR 16 Ne Road ay (4-lane, R16 R13 17 14 Old Moultrie Rd SR 312 to (S 1 3-lane -Aike lanes and side alks R17 R14 18 15 I-95/SR 207 Interchange I-95 @ SR 207 Interchange Modification Report R18 R15 19 16 I-95/SR 206 Interchange I-95 @ SR 206 Interchange Modification Report R19 R16 20 17 Intermodal Center Intermodal Transportation Center Planning Study R20 R17 IMR, Final Design, Right-of Way Acquisition & 21 18 I-95/CR 210 Interchange I-95 at CR 210 R21 R18 Construction 22 19 Wild ood Drive (S 1 to SR 207 Three-lane section R22 R19 23 20 SR 207 I-95 to SR 312 Widen to 6-Lanes R23 R20 FeasiAility Study for ne road and interchange 24 21 Big Oak Road (S 1 to I-95 R24 R21 ith I-95 Develop plans to provide a commuter rail service 25 22 Southeast Commuter Rail Service Do nto n Jacksonville to St. Augustine R25 R22 Aet een Jacksonville and St. Augustine Local Funded Projects Intersection Improvements East Leg (FUNDED SR 16 At International Golf Parkway N/A 2020) (S 1 At Wild ood Drive Intersection Improvements (FUNDED 2020) N/A Local Priority Projects 1 South Dixie Hig1 ay SR 207 to Bing Street Complete Streets L1 2 Bing St (S 1 to SR A1A Multimodal Way /Drainage Improvements L2 3 SR 16 @ IGP Intersection Improvements (East leg, L3 5 (S 1 @ Wild ood Drive Intersection Improvements (Funding 2020 LAP) 65 Intersection Improvements recommended Ay 5 3 Palm Valley Rd @Mickler Rd L5 L3 Ponte Vedra/Palm Valley Traffic Study (2017) Intersection Improvements recommended Ay . 5 Palm Valley Rd @Roscoe Blvd./Vilano Bridge 6. 65 Ponte Vedra/Palm Valley Traffic Study (2017) Side alks from San SeAastian Vie to SR 16 and San SeAastian Vie to CR 5A (Old 7 5 (S 1 side alks from SR 207 to CR 5A (complete L7 L5 Moultrie, side alks Aoth sides as needed, Treasure Beach Rd. to Ocean Palms Entr. 8 . SR A1A Add Side alk on West SideC or SJR2C Trail L8 6. (San Julian Blvd, 9 7 SR A1A (San Marco Ave, SR 16 to Bridge of Lions Shared (se Path (North City) L9 L7 10 8 (S 1 Stokes Landing Rd to IGP Add Side alk on East Side (approx. 1 mile, L10 L8 11 9 SR 312 Plantation Island Dr to SR A1A Add Side alks or SJR2C Trail L11 L9 Multimodal Way (includes intersection 12 10 SR A1A/Anastasia Blvd N. St. Augustine Blvd to Red Cox Rd L12 L10 improvements at Red Cox Dr/Old Duarry Rd, 13 11 A Street A1A Beach Blvd to the Beach Add Side alks L13 L11 ProEects ill Ae identified Ay SJC Side alk Gap 14 12 Countywide Side alk Program Countywide L14 L12 Study 13 SR 13 Holly Berry Ln. to Marywood Dr. Add side alk L13 Legend Ne Text or Revision Ne ProEect Proposed Delete- ProEect Complete ProEects Combined ProEect Moved to Funded List Strike Through - Removed Text R1- SR 313 (312 Extension) R2- CR 2209 New Roadway R3- Race Track Rd (Widen to Four Lanes) R4- SR A1A (Mickler Rd to JTB) R5- St. Johns Pkwy Interchange na Rd a R6- St. Johns Pkwy (Widen to Six Lanes) l o N S R7- SR A1A- Widening Rosco Duval R8- US1/CR 210 Interchange e B R9- Palm Valley Rd (ICW to Mickler Rd) Widening R 4 lvd R 7 R10- Mickler Rd (Roundabout to A1A) Widening S Rosc R11- SR 16 (IGP to S. Francis) Widening oe B R12- SR 16 (S. Francis to Whisper Ridge) Widening lvd R 10 R13- CR 2209 (IGP to SR 16) P R 9 o R14- Old Moultrie Rd (SR 312 to US 1) n t d e R y V R15- I-95/SR 207 Interchange Rac R 3 lle e e d Trac Va k R r d m a al R16- I-95/SR 206 Interchange P B l R v d R17- Intermodal Center u s s e R18- I-95/CR 210 Interchange R l o l b S e a r m R 8 R19- Wildwood Drive (US1 to SR 207) t p s so R n d R 6 Rd R20- SR 207 (I-95 to SR 312) Gre enbr iar Rd R21- Big Oak Road Feasibility Study R22- Southeast Commuter Rail Service y R 18 w k R 5 P e ir u g a M o e wy L R 2 Pk Golf l R 21 Shands a n Bridge io R 17 at rn te R 13 In R 1 J o C e o A a s s h ta S t R 12 d o l H n R R 11 R i wy t t t d e c R 22 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages83 Page
-
File Size-