Free Flow Power NOV 13 2013 Enid App.Pdf

Free Flow Power NOV 13 2013 Enid App.Pdf

ENID LAKE HYDROELECTRIC PROJECT FERC PROJECT NO. 13703 FINAL LICENSE APPLICATION FOR INITIAL LICENSE - MAJOR MODIFIED PROJECT VOLUME I OF IV Free Flow Power Corporation 239 Causeway Street Boston, MA 02114 NOVEMBER 2013 ENID LAKE HYDROELECTRIC PROJECT FERC PROJECT NO. 13703 FINAL LICENSE APPLICATION CONTENT Volume I: Final License Application Initial Statement Exhibit A – Project Description Exhibit B – Project Operations and Resource Utilization (including Appendix B-1 Technical Memorandum – Hydraulic Analysis – Enid Outlet Works) Exhibit C – Construction History and Proposed Construction Schedule Exhibit D – Statement of Costs and Financing Exhibit E – Environmental Exhibit Exhibit F – General Design Drawings (drawings in Volume III) Exhibit G – Project Maps Volume II: Appendices Appendix A – Consultation Documentation Appendix B – Study Plans Appendix C – Study Reports Appendix D – Literature Cited Appendix E – Exhibit E Appendices (Exclusive) Volume III: Critical Energy Infrastructure Information (Per regulations filed separately with FERC and dam owner only) Exhibit F – General Design Drawings and Preliminary Supporting Design Report Volume IV: Cultural Resources Study Report and Consultation (Contains privileged information – Not for public release) ENID LAKE HYDROELECTRIC PROJECT FERC PROJECT NO. 13703 FINAL LICENSE APPLICATION VOLUME I OF IV TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................ES-1 INITIAL STATEMENT ............................................................................................................. IS-1 EXHIBIT A PROJECT DESCRIPTION ................................................................................ A-1 A.1 Physical Composition ......................................................................................... A-1 A.1.1 Existing Non-Project Facilities ............................................................... A-1 A.1.2 Proposed Project Facilities ..................................................................... A-2 A.1.2.1 Physical Composition ........................................................... A-2 A.1.2.1.1 Existing Intake ....................................................... A-4 A.1.2.1.2 Existing Outlet Conduit and Proposed Conduit Liner ..................................................................... A-4 A.1.2.1.3 Proposed Bifurcation Chamber ............................. A-5 A.1.2.1.4 Proposed Discharge Gate ...................................... A-5 A.1.2.1.5 Proposed Hydro Intake Gate ................................. A-5 A.1.2.1.6 Proposed Penstock ................................................. A-6 A.1.2.1.7 Proposed Forebay .................................................. A-6 A.1.2.1.8 Proposed Powerhouse ........................................... A-7 A.1.2.1.9 Proposed Tailrace .................................................. A-7 A.2 Impoundment Characteristics ............................................................................. A-7 A.3 Generating Equipment ........................................................................................ A-7 A.4 Transmission Facilities ....................................................................................... A-8 A.5 Appurtenant Equipment .................................................................................... A-10 A.6 Lands of the United States ................................................................................ A-10 EXHIBIT B PROJECT OPERATIONS AND RESOURCE UTILIZATION ........................B-1 B.1 Alternative Sites Considered................................................................................B-1 B.2 Alternative Facility Designs, Processes and Operations Considered ..................B-1 B.3 Statement of Project Operations ..........................................................................B-3 B.3.1 Existing USACE Operation .....................................................................B-3 B.3.2 Proposed Hydroelectric Project Operation ..............................................B-7 B.3.2.1 Mode of Operation (Manual or Automatic) ............................B-9 B.3.2.2 Annual Plant Factor...............................................................B-10 B.3.2.3 Operation During Adverse, Mean and High Water Years ....B-10 B.4 Dependable Capacity and Average Annual Energy Production ........................B-12 B.4.1 Streamflow Records ...............................................................................B-13 B.4.1.1 Minimum, Mean, and Maximum Recorded Flows ...............B-13 B.4.1.2 Flow Duration Curves ...........................................................B-13 B.4.1.3 Critical Streamflow for Dependable Capacity ......................B-21 TOC-1 ©FFP, 2013 Table of Contents B.4.2 Area Capacity Curve and Rule Curve ....................................................B-21 B.4.3 Hydraulic Capacity ................................................................................B-21 B.4.4 Tailwater Rating Curve ..........................................................................B-22 B.4.5 Powerplant Capability Versus Head ......................................................B-22 B.5 Statement of System and Regional Power Needs ..............................................B-22 B.6 Applicant's Plans for Future Development ........................................................B-25 APPENDIX TM-ENID TECHNICAL MEMORANDUM - HYDRAULIC ANALYSIS –ENID OUTLET WORKS ..................................................................... TM-1 EXHIBIT C CONSTRUCTION HISTORY ...........................................................................C-1 C.1 Construction History ............................................................................................C-1 C.2 Proposed Construction Schedule .........................................................................C-1 EXHIBIT D STATEMENT OF COSTS AND FINANCING ................................................ D-1 D.1 Estimate of New Construction Costs .................................................................. D-1 D.2 Approximate Original Cost ................................................................................. D-1 D.3 Takeover Cost ..................................................................................................... D-2 D.4 Estimate of Average Annual Costs ..................................................................... D-2 D.5 Estimate of Annual Value of Power ................................................................... D-3 D.6 Energy Alternatives ............................................................................................ D-3 D.7 Consequences of Application Denial .................................................................. D-4 D.8 Source and Extent of Financing .......................................................................... D-5 D.9 Estimate of Cost to Develop License Application .............................................. D-5 D.10 Estimate of On-Peak and Off-Peak Values of Power ......................................... D-5 EXHIBIT E ENVIRONMENTAL EXHIBIT ......................................................................... E-1 E.1 Introduction .......................................................................................................... E-1 E.1.1 Overview of Proposed Project ................................................................. E-1 E.1.2 General Description of the Locale ........................................................... E-3 E.1.2.1 Yazoo River Basin – Yocona River Watershed ...................... E-3 E.1.2.2 Yocona River Basin Physiography ......................................... E-5 E.1.2.3 Project Area Climate ............................................................... E-8 E.1.2.4 Yocona River Tributaries ........................................................ E-9 E.2 Report on Water Use and Quality ...................................................................... E-12 E.2.1 Water Use ............................................................................................... E-12 E.2.1.1 Estimated Quantities of Water Discharged from the Proposed Project for Power Production ................................................ E-12 E.2.1.2 Other Existing and Proposed Water Uses ............................. E-13 E.2.1.2.1 Water Withdrawals ............................................... E-13 E.2.1.2.2 Water Discharges ................................................. E-14 E.2.1.2.3 USACE Enid Lake Operations ............................. E-14 E.2.1.3 Other Instream Flow Uses ..................................................... E-14 E.2.2 Water Quantity ....................................................................................... E-14 E.2.3 Water Quality ......................................................................................... E-15 E.2.4 Existing Water Quality Information ...................................................... E-15 E.2.4.1 Enid Reservoir Intake- Upstream Water Quality Data ......... E-19 E.2.4.2 Yocona River- Downstream Water Quality Data ................. E-21 E.2.4.3 Comparison between Intake and Downstream Data ............. E-23 TOC-2 ©FFP, 2013 Table of Contents E.2.5 Impoundment Characteristics ................................................................ E-24 E.2.6 Potential Project Effects on Water Use and Quality .............................. E-25 E.2.6.1 Potential Temporary

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    274 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us