Reference object Ejpovice Railway Tunnel Czech Republic Häny MCM 5500 mixing plant, connected to 4 silos Tunnel-entrance The entire construction addresses the modernization of the high-speed railway line running from Rokycany up to Ejpovice, part of the Trans-European Transport Network. An essential section of this project is the construction of two single-track tunnels with 4,2 km length each, going through the Homolka and Chlum hill formations, close to the city Pilsen. The executing construction-company, Metrostav A.S., relies also for this project on mixing- and injection technology from Häny. In this case, the Häny mixing plant MCM 5500 is installed in front of the tunnels for preparation of grout which is continuously pumped inside the tunnel for a two-component back-filling application (annular grouting). The grout is pumped into the tunnel by means of two Häny grout pumps of the type ZMP 726. The mixing plant operates around the clock, 7 days per week. Professional after sales service for the plant is provided by the local Häny-dealer, Swissgreen Alfa s.r.o. Anticipated project realization: 2013 – 2017 For more information please visit www.rokycanyplzen.cz. The same mixing plant was used on the Metro Line LO V.A1 (driveage between Motol and Dejvice stations) in the city of Prague from 2011 – 2013. Scope of supply: 1 x Häny mixing plant MCM 5500 (Mixer HCM 2500, Agitator HRW 3000, 2 x Pump ZMP 726V) In conjunction with 4 silos: (1 x bentonite, 1 x flyash, 2 x cement) Mixing Capacity: ~ 30 m3/h Year of Delivery: 2011 / 2013 Subject to changes PM4-101557 00 / 08.2016 Häny AG - Mixing and Injection Technology – Häny AG - Misch- und Injektionstechnik – Häny SA - Technique de mélange et d‘injection Buechstrasse 20 • CH-8645 Jona • Tel. +41 44 925 41 11 • Fax +41 44 923 62 45 • [email protected] • www.haeny.com.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-