Monday, March 1, 2021 Approved Project 131 Facilities Project Management Monthly Report by Building PM Project Project PROJECT TITLE Accountable Number: Code 1 Leavitt Lane Projects in Building 1 GEUTHER, MARK E 2020‐0055 RR 1 Leavitt Lane ‐ Convert boiler to natural gas 1.1‐ PLAN/EST 02‐24‐2021: Project newly reassigned to me. Getting up to speed. Year Approved: Design Firm: OPA Contractor: Contractor Name: 18 Waterworks Road Projects in Building 1 PETERS, NICK E 2020‐0170 FCR 18 Waterworks Road ‐ Install 2 monitors connected to the UNH system 1.1‐ PLAN/EST 26 Feb 2021 ‐ Permits received. Receiving materials first week fo March. Scheduling install dates upon arrival. Year Approved: 2021 Design Firm: N/A Contractor: External Contractor Name: Various 2 Leavitt Lane Projects in Building 1 GEUTHER, MARK E 2020‐0054 RR 2 Leavitt Lane ‐ new natural gas boiler 1.1‐ PLAN/EST 02‐24‐2021: Project newly reassigned to me. Getting up to speed. Year Approved: Design Firm: Oak Point Assoc. Contractor: External Contractor Name: TBD 6 Leavitt Lane Projects in Building 1 GEUTHER, MARK E 2020‐0056 RR 6 Leavitt Lane ‐ New Gas Line and Boiler 1.1‐ PLAN/EST 02‐24‐2021: Project newly reassigned to me. Getting up to speed. Year Approved: Design Firm: OPA Contractor: Contractor Name: 88 Commercial Street Projects in Building 1 Facilities Project Management Monday, March 1, 2021 University of New Hampshire Page 1 of 26 PM Project Project PROJECT TITLE Accountable Number: Code ROULEAU, RICHARD A 2018‐0210 FCR 88 Commercial Street ‐ UNH Manchester ‐ Bio‐Manufacturing Innovation Center Tenant fit‐out 3.1‐ SUBSTANTIAL COMPLETION 2/26/2021 ‐ Working with Control Tech, Inc. and UNH IT to set up a virtual server for HVAC controls associated with the 6th floor and the 5th floor lab block. Working with Milestone, Granite State Plumbing & Heating and Control Tech on adding one oxygen sensor and installing remote alarms for both oxygen sensors. Otherwise, project is complete. Use and occupancy of the space is increasing. Lab is being used for COVID testing for UNH Manchester and UNH Law School. Year Approved: 2019 Design Firm: John Jordan Contractor: External Contractor Name: by landlord (using Milestone) Adams Tower Projects in Building 2 GEUTHER, MARK E 2021‐0083 FCR Adams Tower West ‐ Major AC System Repairs 1.1‐ PLAN/EST 02‐24‐2021: Project approved. Work to be scheduled after commencement. Year Approved: Design Firm: N/A Contractor: External Contractor Name: Carrier HENRY, PAUL A 2018‐0310 FCR Adams Tower ‐ Verizon Wireless Antenna Upgrade 2.5‐ IN PROCUREMENT 3‐2‐21 Version not ready for installation, will have to wait until after commencement. Year Approved: 2018 Design Firm: Contractor: External Contractor Name: Verizon Babcock Hall Projects in Building 2 PETERS, NICK E 2021‐0090 FCR Babcock Hall ‐ Roof Access Hatch 2‐ IN DESIGN 26 Feb 2021. Issues with COVID testing has pushed contractors from the project. Site conditions re‐evaluated, and determined the hatch will operate as functioned until summer. Year Approved: Design Firm: N/A Contractor: External Contractor Name: Skyline Roofing WEBBER, TODD M 2021‐0001 FCR Babcock Hall ‐ Adams Tower ‐ Electrical Investigation COVID Preparation 3.1‐ SUBSTANTIAL COMPLETION Investigation is complete, no instruction to move forward with the proposed work at this time. Year Approved: Design Firm: Contractor: Contractor Name: Barton Hall & Cole Hall Projects in Building 4 Facilities Project Management Monday, March 1, 2021 University of New Hampshire Page 2 of 26 PM Project Project PROJECT TITLE Accountable Number: Code MANCINI, MATTHEW E 2020‐0091 SI Barton Hall ‐ 2nd Floor Reno for Diagnostic Labs 2‐ IN DESIGN 3/1/2021: Design effort under way. Early permit review has begun to address egress. Construction Documents expected by April/May 2021. Year Approved: 2020 Design Firm: H.L. Turner Group Contractor: External Contractor Name: HEALEY, SCOTT M 2021‐0040 RR Barton Hall ‐ Utility Distribution ‐ Transformer Replacement 2.5‐ IN PROCUREMENT 1‐29‐21 ‐ Transformer should arrive in the middle of March, and need to be installed before June. Ordered 10‐20 ‐ 23 week lead time. Year Approved: 2021 Design Firm: Contractor: External Contractor Name: IC Reed MANCINI, MATTHEW E 2020‐0092 SI Cole Hall ‐ Instructional Space Improvements 3.1‐ SUBSTANTIAL COMPLETION 3/1/2021: Project is substantially complete. HVAC scope will be deferred. Year Approved: 2020 Design Firm: John L Turner Contractor: External Contractor Name: Multiple RINES, DANIEL M 2021‐0041 FCR Barton Hall & Cole Hall ‐ Bus Shelter Install 3.1‐ SUBSTANTIAL COMPLETION 2‐24‐21: Project is substancially complete. Year Approved: Design Firm: Contractor: External Contractor Name: T&S Campus Projects in Building 9 WEBBER, TODD M 2019‐0369 RR FY21 Campus Envelope and Interior Painting 1.1‐ PLAN/EST Year Approved: 2021 Design Firm: N/A Contractor: FCT Contractor Name: PETERS, NICK E 2021‐0084 FCR Multi Housing Building‐ Hydration Station Installs 1.1‐ PLAN/EST 26 Feb 2021 ‐ Received proposal from consultants and contractors. Awaiting approval for funding. Year Approved: 2021 Design Firm: McHenry Architecture Contractor: External Contractor Name: Charters Brothers Facilities Project Management Monday, March 1, 2021 University of New Hampshire Page 3 of 26 PM Project Project PROJECT TITLE Accountable Number: Code HENRY, PAUL A 2021‐0064 FCR Campus ‐ Parking Lot ‐ Sage Way Visitor Lot ‐ Parking Spot & Drop Box 1.1‐ PLAN/EST 3‐2‐21 Looking for more information Year Approved: Design Firm: Contractor: Contractor Name: PETERS, NICK E 2021‐0092 FCR Campus ‐ Bus Shelter Solar Lighting Upgrades 1.1‐ PLAN/EST 26 Feb 2021 ‐ Initial expected contractor does not provide the services requested anymore. Soliciting to other product manufacturers to locate a source to submit for grant funding. Year Approved: Design Firm: Contractor: Contractor Name: PETERS, NICK E 2021‐0008 FCR Campus Wide ‐ OBA COVID Barrier Installations 3‐ IN CONSTRUCTION 26 Feb 2021 ‐ OBA barriers installed. Broken barriers found in Stillings and Philbrook, and to be repaired through contractor. Another order to be placed to accommodate winter weather and expanded dining requirements. Year Approved: 2021 Design Firm: N/A Contractor: External Contractor Name: Milestone / WB Mason / Malthouse PETERS, NICK E 2021‐0009 FCR Campus Wide ‐ Academic / E&G Hydration Stations 3‐ IN CONSTRUCTION 28 Feb 2021 ‐Preliminary construction complete campus‐wide. Awaiting arrival of water bottle fill stations. Year Approved: 2021 Design Firm: N/A Contractor: External Contractor Name: Milestone / Charters Brothers RINES, DANIEL M 2020‐0276 FCR Campus ‐ Main Street Paving and Crosswalks 3‐ IN CONSTRUCTION 2‐24‐21: Project is via the TOD contract with Continental. Main Street Paving will take place after South sidewalk road impacts are complete,continental and the town planning early June for paving to begin. Year Approved: 2021 Design Firm: Contractor: Contractor Name: continental HOUDE, DONALD A 2021‐0024 SI Campus – High Voltage Monitoring Sensor Installation 3‐ IN CONSTRUCTION 02‐19‐21 All 11 monitors and the 1 gateway are installed with satisfactory signal strength. I will log in all locations and plot on a UNH Map for the record. Year Approved: 2021 Design Firm: Contractor: Contractor Name: Facilities Project Management Monday, March 1, 2021 University of New Hampshire Page 4 of 26 PM Project Project PROJECT TITLE Accountable Number: Code PETERS, NICK E 2020‐0279 FCR Campus Wide ‐ Academic/E&G COVID Barrier Installations 3‐ IN CONSTRUCTION 28 Feb 2021 ‐Shields have been installed through‐out Durham, Manchester, and Concord campuses. Year Approved: 2020 Design Firm: Contractor: External Contractor Name: WB Mason, Milestone, Chase Ocean Engineering Laboratory Projects in Building 1 ROULEAU, RICHARD A 2020‐0149 FCR Chase Ocean Engineering Laboratory ‐ Rm S210 HVAC Recommendations and Repair 2‐ IN DESIGN 2/26/2021 ‐ Final review documents received and review is nearly complete. Construction estimate received. FCR to be prepared and forwarded to the customer, who has indicated that they intend to proceed. Due to the fact that we are nearly into heating season, the intent is to replace RTU‐2 with a smaller unit next cooling season. New RTU will be 100% recirc except when economizing, able to stage and will have reheat. Energy Office put in place a temporary solution for this summer making RTU‐1 primary for the server room and RTU‐2 secondary during unit swap out. Year Approved: 2020 Design Firm: H.L. Turner Group Contractor: External Contractor Name: TBD Child Study & Development Center Projects in Building 2 GEUTHER, MARK E 2020‐0250 FCR Child Study & Development Center ‐ Decks 1.1‐ PLAN/EST 02‐24‐2021: Waiting for estimate Year Approved: Design Firm: Contractor: External Contractor Name: TBD GEUTHER, MARK E 2020‐0173 FCR Child Study & Development Center ‐ Playground Repairs 3‐ IN CONSTRUCTION 02‐24‐2021: On site construction has stopped until Spring 2021. Deck building will take place off site. Year Approved: 2020 Design Firm: Ironwood Contractor: External Contractor Name: T&S Construction Christensen Hall Projects in Building 1 PETERS, NICK E 2021‐0093 FCR Christensen Hall ‐ T‐Mobile Antenna Upgrades ‐ 1.1‐ PLAN/EST 26 Feb 2021 ‐ Construction documents received and preparing permit applications. EME or RF study requested from contractor. Year Approved: 2021 Design Firm: Contractor: Contractor Name: Dimond Library Projects in Building 2 Facilities Project Management Monday, March 1, 2021 University of New Hampshire Page 5 of 26 PM Project
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages26 Page
-
File Size-