
CHUM New CHUM for MoNtreal www.nouveauchum.com CHUM New CHUM for Montreal After a decade of uncertainty Montreal is soon to benefit from a $2.5 billion state of the art teaching and research hospital that anyone will be happy to visit – or work at written by: John o’hanlon research by: Vincent Kielty CHUM ontrealers have become accustomed to seeing the large building site in the heart of the city that will house the Mnew hospital complex that is being built there. The new CHUM is bounded by Boulevard René-Lévesque, Rue Saint- Denis, Rue Sanguinet and Rue Saint-Antoine Construction in towering 20 storeys above ground. The City progress and the of Montreal will finally have one of the most CrCHUM in the advanced teaching hospitals and medical background, almost research facilities in the world. completed The Centre hospitalier de l’Université de Montréal (CHUM) and its associated Research Centre (CRCHUM) will be truly world class institutions. They were financed under two separate PPP project agreements. Substantial completion of the CRCHUM in the end of September 2013, and substantial completion for the first phase of the hospital is April 2016. This major redevelopment project is much more than a stunning architectural group of buildings to grace this key site on the edge of the old city. The project has been clouded by uncertainty since it was first mooted more than a decade ago, in 2000. Sylvain Villiard, Secretary General and Associate Executive Director, has been juggling the project since its inception, through a series of changes of administration and policy. The present site was finally chosen in 2005, by which time, he says, his team had become very good at site evaluation! Then there was a period of discussion about the size of the hospital: it replaces three existing facilities with a total of 1,000 beds, so the government’s preference for a much more smaller facility had to be questioned. At last CHUM hh angus and associates limited HH angus is pleased to be participating in integrated design approach. our design the CHUM project - the Centre Hospitalier team works closely with stakeholders to de l’Université de Montréal. More than 50 deliver building design solutions that will members of the HH angus staff are providing be efficient and flexible and that will serve Mechanical and electrical Consulting the needs of the owner/operators over the engineering and Security Design to the project, lifecycle of the facility. which is being designed to target leeD® Silver. our staff of over 200 includes 50+ licensed founded in 1919, today HH angus and professional engineers and 60+ employees associates is one of Canada’s largest private who are leeD® accredited Professionals. consulting engineering firms. the company we’ve been delivering energy efficient designs focuses on serving clients in the healthcare, since before anyone thought to call them technology, commercial and energy system sustainable. to us, it just makes sense…why sectors. we’re proud of our reputation for would we work any other way? delivering superior engineering design and innovative building solutions to industry leaders. our ability to provide technical support, design and project management for we are fortunate to work with clients who building services projects offers our clients trust us to incorporate new concepts and a comprehensive range of services from refine current ones to provide them with concept to commissioning. the best solution. with that trust comes the obligation to ensure our design fully meets In addition to mechanical and electrical our client’s expectations. consulting engineering, our services include: C o m m i ss i o n i n g • Pr o j e c t M a n a g e m e n t recognized as industry leaders with Vertical transportation • lighting Design international scope, HH angus has a history Communications & Security of satisfying clients who require solutions to P e e r r e v i e w •r e n e w a b l e e n e r g y C o n s u l t i n g A BUILDING IS A LEGACY complex projects. regardless of a project’s Master Planning • feasibility Studies • energy size or intricacy, we work with the design Modeling • Photometrics • Inspection Your legacy is to deliver a building that serves all your stakeholders – not just for team to understand the character of the lifecycle Costing • Simulation today, but for the century ahead. facility and to design appropriate systems, on operations training • Compliance Consulting schedule and within budget. We help define your facility for the future by delivering flexible, energy efficient and sustainable T. 416.443.8200 designs that serve today’s needs as well as those of generations and technologies to come. As During the lifespan of a facility, operating or toll free 1.866.955.8201 your consulting engineering partner, we apply our 90+ years of engineering expertise to solve costs will substantially exceed capital costs. E. [email protected] your challenges. we understand that, and take a collaborative, www.hhangus.com HH Angus – an engineering partner for the life of your building. hhangus.com CHUM a compromise was reached, and CHUM will have 772 beds and 39 operating rooms. The main hospital replaces three existing hospitals, the Saint-Luc Hospital that stands at the corner of Saint-Denis and René-Lévesque – that landmark will be demolished as part of the project – the Hôtel-Dieu and the Hôpital Notre-Dame. It is being constructed under a public private partnership (PPP) between the Centre hospitalier de l’Université de Montréal and four equity partners that together make up the CHUM Collectif. Innisfree is a UK investment group with 23 active hospital projects, four in Canada; OHL is based in Spain and has built hospitals totalling 60,700 beds in 14 countries; Laing O’Rourke is the UK’s largest privately owned construction company and Dalkia Canada is a subsidiary of the global facilities management group. amphitheatre and main entrance of the New CHUM The Research Centre to the south-east of the main hospital site and separated from it by supervision of Sylvain Villiard who in 2011 CRCHUM consists of two very be a further reassurance to Rue Viger, is being delivered via a separate PPP handed over the project management of high tech buildings amounting know that these systems will agreement with Accès Recherche Montréal CHUM itself to Paul Landry. to 68,800 square metres. It is be competently maintained (ARM), a partnership between Fiera Axium The new centre brings together six former a tribute to our partners that 722 for at least the 30 years of the Infrastructure and Meridiam Infrastructure, locations – imagine the advantages in after 42 months of construction PPP agreement. The facility and built by a joint venture of two Quebec communication between the researchers! No we are on schedule, on budget Number of beds in the will be formally handed over companies, Pomerleau and Verreault SENC. wonder they are keen to move in, something and within one percent of our new hospital on October 1, 2013 and by In fact it is almost finished – the fabric of they will begin to do in October 2013, a original specification.” The January 1, 2014 six hundred the buildings is complete, and the services remarkable achievement on the part of ARM buildings that the staff will be people will have moved in. and equipment are going in under the overall and Pomerleau-Verreault says Villiard. “The leaving behind are up to 150 years old – their In addition, 5,500 pieces of equipment are inconvenience and inefficiency couldn’t be a being moved – in all $100 million-worth of greater contrast to the fail-safe systems they new equipment is being installed, 40 percent “It Is a trIbUte to oUr partners tHat will enjoy in the new facility. of it brand new. Even the power supply comes in from two The research facility is linked to the after 42 MontHs of ConstrUCtIon we are separate grid sources. Hydro-Québec and new Integrated Teaching and Training on sCHedUle, on bUdget and wItHIn one an additional link will give access to power Centre (CIEF) by a bridge that spans one of within the Research Centre. Honeywell is the Montreal’s busiest link roads. Not that you’d perCent of oUr orIgInal speCIfICatIon” facility management partner in ARM – it will know it, because it is an underpass that runs CHUM overview of what the New CHUM, including CrCHUM, will look when it’s finished self-training and skills evaluation rooms and including the 39 ORs while above them rise “tHe MaIn HospItal wIll take a simulation laboratories. It will also include two parallel towers that contain 28 of the 36 two rooms equipped with virtual simulators in-patient wards. lIttle longer to CoMplete, bUt It Is and computer operated mannequins. Connecting directly to the D Block at all progressIng well and Is In tHe Hands The main hospital will take a little longer levels, block B1 contains the ambulatory care to complete, but it is progressing well and is centre, or outpatient facility. It houses 35 of a robUst partnersHIp” in the hands of a robust partnership says Paul different specialist clinics. A good example Landry, who had delivered two large hospital is the specialist burns unit, one of only two below the site itself. The CIEF is a key part is already working with a company involved projects in Ontario before coming to CHUM in in the province – the other is in Québec City. of the hospital: some 6,000 students a year in simulation to develop new products for 2010.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages9 Page
-
File Size-