Graham Butt, Ministry of Energy Mecklenburg-Vorpommern

Graham Butt, Ministry of Energy Mecklenburg-Vorpommern

Mecklenburg-Vorpommern - Moving Towards A Renewable Energy Supply European Promenade Usedom Dr.-Ing. Graham M. Butt ENERGETIKA XXI, Workshop 2 St. Petersburg, November 10th, 2016 Contents State of Renewable Energies Energy-Conception, Incentives Next Steps Summary ENERGETIKA XXI, St.Petersburg, Nov. 2016 2 Example: On-Shore Windenergy Development of Onshore-Windenergy in MV 3500 Number of Turbines 3000 Power (MW) Average Power per Turbine (kW) 2500 2000 1500 1000 500 0 1992 1995 2000 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Source: EM 2016 ENERGETIKA XXI, St.Petersburg, Nov. 2016 3 Offshore-Windenergy – Baltic 1 Germany‘s first commercial Windpark 21 Windturbines with 48,3 MW, 16 km off the coast ENERGETIKA XXI, St.Petersburg, Nov. 2016 4 Renewable Power Generation Gross Power Consumption 2014: 6.800 GWh 1995 Biogas 2005 Biomass Wastegas Solar hydro Wind 2014 95 GWh 2.218 GWh 7.788 GWh Quelle: EM 2015 ENERGETIKA XXI, St.Petersburg, Nov. 2016 5 Contents State of Renewable Energies Energy-Conception, Incentives Next Steps Summary ENERGETIKA XXI, St.Petersburg, Nov. 2016 6 Basis of the Energy- und Climate Protection Policy in MV • (Bio)Energieland M-V, 2006 • Energieland 2020, 2009 • Climate Protection Actionplan, 2010 • Energy-Conception, 2015 • MV-Atlas Renewable Energy, 2011 • Grid-Study M-V I, 2010 • Grid-Study M-V II, 2012 being continued ENERGETIKA XXI, St.Petersburg, Nov. 2016 7 Goals of the Energy-Conception – e.g. Local Participation, Energy-Efficiency and Energy-Mix Local Participation • Economic partnership • Improve formal and informal public participation in planing- and permitting- procedures Energy - Efficiency and Energy - Saving • A strategic goal, increasing the understanding for energy-efficiency • Integral view of production- and energy-processes in enterprises • Combination of motorized individual traffic, bicycle and public transport, use of alternative driving technologies and fuels Energy - Mix • Double power generation to 28,3 TWh in 2025 of which 24,3 TWh are renewable • Increase renewable heat from 8 % to the national goal of 14 % by 2020 • 2nd generation bio-fuels as long-term option for biomass- producers and the bio- fuels-industry ENERGETIKA XXI, St.Petersburg, Nov. 2016 8 Public Participation Act – Main Points Project developers planning wind-turbines higher than 50m (incl. repowering) must offer a minimum 20% share of the project-enterprise to the local municipalities and residents. • Alternative possibilities of economic participation e.g. reduced power rates or revenue sharing – without proof of economic equality • Local residents, the municipality and neighbouring municipalities 5 km around the plant(s) • Project enterprise with limited liability liability limited to investment without reserve liability • Act passed regional parliament in April 2016 ENERGETIKA XXI, St.Petersburg, Nov. 2016 9 Funding Priorities 2014 • Investive measures in energy saving and improvement of energy efficiency that exceed required standards • Investive measures in the use of renewables for heating • Infrastructure measures in the use of renewables, e.g. storage of heat and power (incl. chemical and physical solutions), district-heating/biogas- grids, hydrogen-infrastructure • Investive measures in alternative non-fossile fuels and driving- technologies, electro-mobility • Innovative projects for the use of energy efficiency potentials und renewables • Preliminary planning studies in preparation of investive measures to implement local renewable energy supply structures, energy management surveys • Planning investive measures ENERGETIKA XXI, St.Petersburg, Nov. 2016 10 Incentives for Enterprises Incentive system: Enterprise Incentive: • 10% for medium-size enterprises • 20 % für small enterprises Specific Incentive 10% Biohotel Amadeus, Schwerin – • for special innovations or Heat Exchanger, 2010 • für projects with considarably increased ressource efficiency or • for projects with special multiplier effect, demonstrative character, importance for public relations or • for projects with economic participation of residents and municipalities Similar offers for municipalities ENERGETIKA XXI, St.Petersburg, Nov. 2016 11 Funding Rates - Enterprises Schlosshotel Kittendorf – Woodpellets Furnace, 2013 ENERGETIKA XXI, St.Petersburg, Nov. 2016 12 Contents State of Renewable Energies Energy-Conception Next Steps Summary ENERGETIKA XXI, St.Petersburg, Nov. 2016 13 Acceptance Measures • Energy-Ministry Communication-Strategy • Joint actions of all RE-branches, e.g. Renewable Energy Day • Include more Renewable Energy topics into school curricula e.g. by supplying experimental equipment • Funding of climate protection projects: projects with public participation receive a 10 % incentive • New Energy- and Climate-Protection Agency • Joint guest-study of the Tourism Board and the WindEnergy - Network, e.g. with visualisation of windparks ENERGETIKA XXI, St.Petersburg, Nov. 2016 14 Plans for Onshore Windparks – Possible Future Priority Locations 15 Solar Open Space Plants ENERGETIKA XXI, St.Petersburg, Nov. 2016 16 Tenders – Pilot-Project: Solar Open Space Plants • EU-Commission requires tenders for RE projects. • Change of German legislation (EEG 2014) led to first moves towards competition keeping the variety of players in the market and reducing the costs for RE. • Results of first year with tenders for Solar Open Space Plants # Federal # # Projects Volume Date Volume States Projects M-V M-V 01.04.15 150 MW 8 25 2 18,9 MW 01.08.15 150 MW 11 33 2 14,4 MW 01.12.15 200 MW 11 43 8 56,3 MW • following tenders: 400 MW in 2016; 300 MW in 2017 to ensure an average expansion of 400 MW/a. ENERGETIKA XXI, St.Petersburg, Nov. 2016 17 Bioenergy-Village Bollewick ENERGETIKA XXI, St.Petersburg, Nov. 2016 18 (Bio)Energy-Villages in M-V (2014) Energy Villages (6) Villages „on the way“ (12) Hermannshof planned participation in wind-projects (3) Dalkendorf Stolpe (Dersewitz) Stellshagen Rosenow Burow Tarnow Ivenack Brunn (Roggenhagen, Granzkow) Grambow Jabel Torgelow a.S. Alt Zachun Gallin- Schaalsee Blankensee Hülseburg Kuppentin Bollewick Kambs Zepkow Melz Source: EM 2014, FNR 2014 19 Contents State of Renewable Energies Energy-Conception Next Steps Summary ENERGETIKA XXI, St.Petersburg, Nov. 2016 20 Summary • Double renewable power generation untill 2025 • Increase the renewable part of the total heat supply from 8 % to at least 14 % by 2020 • Develop a communication strategy for the „MV Energie- wende“ • Energy - and Climate Protection Agency has recently been established • Public Participation Act (Bürger- und Gemeinden- beteiligungsgesetz) MV became operational in 2016 • Make the most of the „Energiewende“ for regional value creation to enable population to profit economically ENERGETIKA XXI, St.Petersburg, Nov. 2016 21 Thank you for your attention! Dr.-Ing. Graham M. Butt Tel.: 0049-385-588 8310 [email protected] ENERGETIKA XXI, St.Petersburg, Nov. 2016 22 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us