Final Environmental and Social Impact Assessment Report For proposed DBL Industrial Park, Feb 2021 Maulvibazar, Bangladesh Disclaimer The report has been prepared by PricewaterhouseCoopers Bangladesh Pvt Ltd (PwC) for DBL Industrial Park Limited (erstwhile DBL Economic Zone Limited). This is pursuant to the Scope of Work under the contract document "Prepare the ESIA Report of DBL Industrial Park in Shreehatta, Sylthet " issued by DBL Industrial Park Limited. PricewaterhouseCoopers Bangladesh Pvt. Ltd. (PwC) has been appointed by DBL Industrial Park Limited to undertake an Environmental and Social Impact Assessment for DBL Industrial Park in Shreehatta, Sylthet. Any third party should obtain prior consent of PwC before copying or reproducing, in whole or in part, the contents of this report. PwC disclaims any responsibility for any loss or damage suffered by any third party by taking reliance of this report. Furthermore, PwC will not be bound to discuss, explain or reply to queries raised by any agency other than the intended recipients of this report. All information in the report is intellectual property of DBL Industrial Park Limited. PwC does not accept any liability or responsibility for the accuracy, reasonableness or completeness of, or for any errors, omissions or misstatements, negligent or otherwise and does not make any representation or warranty, express or implied, with respect to the information contained in this document. The information contained in this document is selective and is subject to updating, expansion, revision and amendment. It does not and does not purport to contain all the information that a recipient may require. Further this is not an audit report and no reliance should be based on this report for the purposes of audit. Final Environmental and Social Impact Assessment Report PwC 1 Important message to any person not authorized to have access to this report Any person who is not an Addressee of this report or who has not signed and returned to PricewaterhouseCoopers Bangladesh Pvt Ltd a Release Letter is not authorized to have access to this report. Should any Unauthorized Person obtain access to and read this report, by reading this report such person accepts and agrees to the following terms: 1. The reader of this report understands that the work performed by PricewaterhouseCoopers Bangladesh Pvt Ltd. was performed in accordance with instructions provided by our Addressee Client and was performed exclusively for our Addressee Client’s sole benefit and use. 2. The reader of this report acknowledges that this report was prepared at the direction of our Addressee Client and may not include all procedures deemed necessary for the purposes of the reader. 3. The Reader agrees that PricewaterhouseCoopers Bangladesh Pvt Ltd., its Partners, Principals, Employees and Agents neither owe nor accept any duty or responsibility to it, whether in contract or in tort (including without limitation, negligence and breach of statutory duty), and shall not be liable in respect of any loss, damage or expense of whatsoever nature which is caused by any use the reader may choose to make of this report, or which is otherwise consequent upon the gaining of access to the report by the reader. Further, the reader agrees that this report is not to be referred to or quoted, in whole or in part, in any prospectus, registration statement, offering circular, public filing, loan, other agreement or document and not to distribute the report without prior written consent of PricewaterhouseCoopers Bangladesh Pvt Ltd and DBL Industrial Park Limited (erstwhile DBL Economic Zone Limited). Final Environmental and Social Impact Assessment Report PwC 2 Abbreviation & Glossary % Percentage EC Electrical Conductivity °C Degree Celsius ECA Ecologically Critical Area µg/m3 microgram per cubic meter ECC Environmental Clearance Certificate American Conference of ACGIH ECR Environment Conservation Rules Governmental Industrial Hygienists ADB Asian Development Bank EHS Environment, Health and Safety AEZ Agro Ecological Zone EIA Environmental Impact Assessment AMSL Above Mean Sea Level EMP Environmental Management Plan BBS Bangladesh Bureau of Statistics EPP Emergency Preparedness Plan Bangladesh Economic Processing Environmental and Social Impact BEZA ESIA Zone Authority Assessment Bangladesh Meteorological BMD ETP Effluent Treatment Plant Department BNBC Bangladesh National Building Code EU European Union BOD Biochemical Oxygen Demand EZ Economic Zone Bangladesh Water Development BWDB FDI Foreign Direct Investment Board FGD Focus Group Discussions CaCO3 Calcium Carbonate CETP Common Effluent Treatment Plant FMD Foot & Mouth Disease CH2O Formaldehyde GDP Gross Domestic Product Cl2 Chlorine GIS Geo-Informatics System Cm Centimetre gm Gram CO Carbon monoxide GoB Government of Bangladesh CO2 Carbon dioxide GSB Geological Survey of Bangladesh Global Seismic Hazard Assessment GSHAP COD Chemical Oxygen Demand Program CPR Common Property Resources H2S Hydrogen sulphide dB Decibel ICT Inland Container Terminal DBL Dulal Brothers Limited IEE Initial Environmental Examination DG Diesel Generator IWM Institute of Water Modeling Japan International Cooperation JICA DO Dissolve Oxygen Agency DOE Department of Environment Kg Kilogram Department of Public Health and DPHE KV Kilo Volts Engineering Final Environmental and Social Impact Assessment Report PwC 3 LPG Liquefied Petroleum Gas STP Sewage Treatment Plant m Meter TDS Total Dissolved Solid MBR Membrane Bio Reactor ToR Terms of Reference MLD Million Litres Per Day UASB Up-flow Anaerobic Sludge Blanket MMSCF Million standard cubic feet per day UG Under Ground D MSW Municipal Solid Waste USA United States of America MVA Mega Volts Ampere VOC Volatile Organic Compound NaCL Sodium Chloride NGL Normal Ground Level NH3 Ammonia NNE North-North-East NO Nitric oxide NO2 Nitrogen dioxide NOx Nitrogen Oxides O3 Ozone PGCB Power Grid Company, Bangladesh PIU Project Implement Unit PM 10 Particulate Matter 10 PM 2.5 Particulate Matter 2.5 PPE Personal Protective Equipment PPP Public Private Partnership PVC Polyvinyl chloride RBC Rotating Biological Contactors RCC Reinforced Cement Concrete REB Rural Electrification Board RHD Roads and Highways Department RMG Readymade Garments SBR Sequencing Batch Reactor SO2 Sulphur dioxide SPM Suspended Particulate Matter SRDI Soil Resource Development Institute Final Environmental and Social Impact Assessment Report PwC 4 Table of Contents Executive Summary ........................................................................................................ 12 1. Introduction............................................................................................................... 28 1.1. Project Background ....................................................................................................................... 28 1.2. About the Project .......................................................................................................................... 28 1.2.1. Location of Project Site ....................................................................................................... 28 1.2.2. Connectivity to Proposed Site ............................................................................................ 30 1.3. Rationale for the Proposed Project .............................................................................................. 30 1.4. Scope and Methodology of the Study ............................................................................................ 31 1.5. Limitation of the Assessment ........................................................................................................32 1.6. ESIA Team ......................................................................................................................................32 1.7. ToR Compliance Matrix .................................................................................................................32 1.8. Structure of the Report ..................................................................................................................36 1.9. Acknowledgement ......................................................................................................................... 38 2. Legislative, Regulation and Policy Consideration ...................................................... 39 2.1. Regulatory Requirements for the Proposed Project ....................................................................39 2.2. Procedure for Obtaining Environmental Clearance from DoE, Bangladesh ............................. 45 2.3. Project Categorization as per ADB .............................................................................................. 46 2.4. ADB Safeguard Policies 2009 ....................................................................................................... 47 3. Project Description .................................................................................................... 50 3.1. Introduction .................................................................................................................................. 50 3.2. Objective........................................................................................................................................ 50 3.3. Project Option ............................................................................................................................... 50 3.4. Proposed Interventions & Project Activities ..............................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages205 Page
-
File Size-