Route 1: Map A

Route 1: Map A

Contains OS data © copyright and database right 2017 Route 1: Map A A1 Freckleton A1 Upgrade existing on-road mandatory lane to a dedicated 2 way off-road cycle track in accordance with guidance (approx. 4200m) Contains OS data © copyright and database right 2017 Route 1: Map B Route 6 Haslam Park Ashton - on - Ribble Ashton Park A5 A9 A6 A4 A8 A2, A3 Marina B11, B19, A7 B14, B18 B12, B13 Penwortham A2, A3 (A583 Blackpool Rd from Preston A8 Junction upgrade at Pedders Way to New Road junction to Nelson Way) incorporate movements. Upgrade existing 2 way off-road cycle track in accordance with guidance (approx. A9 Deliver a 2 way off road cycling facility 3000m). along this stretch. Route deteriorating in parts and requires B11 A parallel crossing. some resurfacing. B12, B13 The route requires general maintenance to occur regularly. A4 provide a dedicated crossing facility, replacing current informal crossings. Section through the car park requires a clearer route, or a segregated pathway. A5 Construct a two way cycle track in accordance with guidance. B14, B18 Redesign rail crossing barriers to prioritise pedestrians and cyclists outside of A6 Upgrade subway link to Rylands Crescent rail operation. Lighting from Liverpool Rd to to shared use. Navigation Way. A7 Junction upgrade at Nelson Road to B19 Upgrade existing informal drop kerb incorporate East / West Links. crossing with a central island to parallel crossing. Contains OS data © copyright and database right 2017 Route 2: Map A Route 4 Route 3 Fishwick Ribbleton A2 Park A5 A3 A1 A4 A7, A8 A6 D4, D5 D1, Route 12 D2 Walton - le - Dale A7, A8 Improvements to lighting and A1 (New Hall Lane to Blackpool Rd) – maintenance. A contraflow cycle lane over Reallocation of road space to deliver two bridges linking into Brockholes nature segregated cycle tracks. reserve. A2 Reduce radius to slow vehicles and Deliver a new 2 way off-road cycle track improve the environment, add a zebra from A59/M6 junction to Whalley Road, crossing to New Hall Lane arm. through central wooded area, between dual carriageways and continuing on the north of A3 Removal of hatching and reallocation of the A59 highway space to create cycle tracks. D1 Environmental enhancement from A4 Deliver a two-way cycle track from Fishwick Parade Church Avenue to Fishwick Glenluce Drive to the river crossing. Likely to Road. An alternative route to the main road. be on the south side and would need land from Preston City Council. D2 Investigate opportunities for filtered permeability by localised closures. A4 Deliver a two-way cycle track from D3 Environmental enhancement to improve Glenluce Drive to the river crossing. Likely to safety, lighting and desire line paths and be on the south side and would need land improved signage. from Preston City Council. D4, D5 Extension of 20mph on Mercer St, A5 Junction narrowings and side road Cranborne St, Adelade St and Primrose Hill. priority treatment Environmental enhancement – junction A6 Dedicated crossing to access proposed narrowings, traffic calming to make it more Brockholes Brow Cycle track. pleasant for pedestrians and cyclists. Contains OS data © copyright and database right 2017 Route 2: Map B B3 B2 Myerscough Smithy B1 Turner Green Samlesbury Aerodrome A9 C1 Samlesbury A9 Provision of Toucan crossings to allow B2 Crossing facility needed to access access to new route Samlesbury EZ. B1 Replace on-road advisory with 2 way off B3 Extend two way cycle track to Mellor road facility. At Samlesbury EZ, upgrade the Brook. existing shared path width and move lamp columns to reduce clutter. C1 Deliver a 2 way off-road cycle track, this may require land purchase as limited highway width. Contains OS data © copyright and database right 2017 Route 3: Map A Route 6 Haslam Park A18 A19 A22 A23 A21 A20 Ashton – on - Ribble Ashton Park A24 Route 1 Marina A18 Improve gateway to Haslam Park from A22 Improve crossing facility from Ashton Blackpool Rd, and look at realigning Community Science College to the park. pedestrian crossing facility. A23 provide protected approaches and A19 Provide protected cycle approaches dedicated pedestrian provision on all arms. and dedicated pedestrian provision on all General improvements are needed to arms. improve access to Tesco Express. A20 Tighten and simplify junction, provide protected cycle approaches & dedicated A24 Provide dedicated controlled crossing pedestrian provision on all arms. facilities for pedestrians and cyclists. A21 Widen and upgrade the Guild Walk path to shared use. Add lighting if possible. (approx. 600 m) Contains OS data © copyright and database right 2017 Route 3: Map B Route 5 Route 4 A11 A12 A14 A15 Moor Park Route 6 A16 B10 A17 A13 B8 B12 B14, B15 B5 B9 B13 B1 B7 B11 Route 5 B2 B4 Route 4 B3 B6 Ashton – on - Ribble UCLAN A2 (whole route) Reduce to consistent single A17 Investigate opportunity for dedicated B7 Eldon St: a wide carriageway, a scheme to carriageway along entire length of the route, canal access from Blackpool Rd. reinforce 20 mph and create a pleasant areas and create a dedicated on carriageway for walking and cycling. Could use staggered segregated route. parking as pavement parking continues to be B1 Junction treatment on Blackpool Rd, to an issue. aid cyclist crossing into and out of Stocks Rd. A11 Provide off-road track with new path along northern boundary of park through trees B8 Raised table and improved crossing for (approx. 1100 m) B2 parking restrictions and dropped kerbs to pedestrians and cyclists on this busy corridor improve visibility for cyclists entering and and reinforce 20 mph. A12 Tighten junction and provide protected exiting Stocks Rd. cycle approaches, widen pedestrian refuge on B9 Safer routes to School – reinforce parking all arms. Remove guard railings. B3 Canal access from Roebuck St, built out restrictions, review dropped kerbs. Ensure with drop kerb on the road, gateway parking restriction on corners of side roads. A13 Investigate contra-flow opportunities on treatment to canal and replace steps with side roads to improve local network ramped access. B10 parking restrictions reinforced permeability on side roads from Garstang Rd to Tom Benson Way. B11 Widen and protect contra-flow cycle B4 Pavement parking is an issue; highway lane works to reinforce 20mph and parking A14 Include formal pedestrian phases on all management. B12 Move pedestrian signals more in line junction arms and protected cycle approaches. with crossing and upgrade to Toucan. Provide B5 Safer routes to schools needed: reinforce protected central island. A15 Tighten junction and provide protected parking restriction, review of dropped kerbs, cycle approaches. Widen pedestrian provision tighten junctions. Reclaim space for B13 Rationalise barriers and improve link on all arms and remove guard railings. pedestrians and cyclists. from St Thomas’ Rd A16 Tighten junction and provide protected B14, B15 Gateway/ junction wayfinding B6 Junction treatment to reduce crossing cycle approaches. Widen pedestrian refuge feature where route crosses with R4, some distances and provide formalised crossing and investigate dedicated pedestrian provision maintenance needed. Replace with bollard to points. on all arms. Remove guard railings., improve access. Contains OS data © copyright and database right 2017 Route 3: Map C A10 A9 Route 4 A8 Holme Slack A7 Deepdale Moor Park Shopping B23 B16 A6 B17 Ribbleton A5 B22 B20 B18, B19 A4 Ribbleton B21 A3 Park A1 Route 2 A1 Reduce the radius at roundabout to slow A7 Residential parking needs review, B17 Remove central hatching and replace vehicles and improve environment for potential for outbound straight ahead cycle with segregated cycling facility from Moor cyclists. signal bypass. Park Ave to St Stephen’s Rd. Investigate opportunity for improved crossing facilities to the school. A3 Upgrade East/West and North/South A8 Tighten junction and provide a protected Path in the park to shared use. Width cycle approach. B18, B19 Safer routes to school – reinforce challenges could be overcome by ‘Please parking restriction. Parking restrictions on all consider other path user signs’ junctions of side roads. A9 Tighten junction to reduce crossing A4 Tighten junction and provide a protected distance for pedestrians and turning vehicle B20 Reinforce parking restrictions, ensure cycle approach speeds. parking doesn’t block cycle crossing. B21 Reinforce parking restrictions and A5 Tighten junction and provide protected A10 Tighten junction and provide protected traffic calming along Skeffington Rd. cycle approaches. Widen pedestrian refuge cycle approaches, widen pedestrian refuge on all arms and remove guard railings? on all arms and remove guard railings. B22 Open up access to surfaced rail path scheme (Route 4) B16 Provide dedicated inline controlled A6 Surface and desire line path through crossing for pedestrians with protected greenspace on route to Morrisons – approx. refuge for crossing cyclists to access Moor B23 Improve legibility of permissive route 70m. Park Ave. through Preston North End car park. Contains OS data © copyright and database right 2017 Route 4: Map A D8 B8 – B10 D7 Brookfield Park D5 D4 B1 – B4 Holme Slack Deepdale Moor Park D3 Shopping Deepdale B5, B6 D2 Stadium Route 3 A14, A15 Ribbleton A10 – A13 D1 B7 A6 Ribbleton A5 Park A3 A8, A9 A7 Fishwick Route 2 A4 A1 A2 A1 Improve dropped kerb access to toucan A14, A15 Environmental enhancement B8 – B10 Improve gateways to access the crossings at junction & wayfinding to access scheme – remove fencing, surfacing route, e.g. Park Close, Brookfield Park, Sion route required. Remove motorcycle barriers. Close, Greenfields Primary School. A2 Environmental enhancement from A6 B1 – B4 Along whole stretch of disused D1 Improve signage, and minor works to junction to St Paul’s Road. railway trail - Remove motorcycle barriers to reinforce 20mph. improve access for all users (e.g. cyclists, A3 Potential raised table at junction, mobility scooters).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us