Energy Efficient Modernization of Municipal Lighting System of Yerevan City

Energy Efficient Modernization of Municipal Lighting System of Yerevan City

Yerevan Municipality Ministry of Nature Protection of RA Energy Efficient Modernization of Municipal Lighting System of Yerevan city The overreaching aim of the “Green Urban Lighting” UNDP-GEF project is to save energy and to reduce greenhouse gas emissions by increasing energy efficiency of municipal lighting systems in the cities of Armenia and to demonstrate advantages of new light emitting diodes (LED) technologies via implementation of municipal investment programs and national policies. Results of the street lighting modernization projects 63% – decreased energy consumption 115 300 USD – annual savings from reduced energy consumption and maintenance costs 587 tCO2 – annual reduction of greenhouse gas emissions 19.31 km – length of streets with improved illumination 1,325 – number of LED luminaires installed 162 – number of decorative LED luminaries installed in the Yerevan Zoo 681,500 USD – total investments, of which grants provided by UNDP is 323,300 USD, 195,200 USD are from the savings accumulated in Yerevan city revolving fund, 153,100 USD are from Yerevan Illumination Company for lighting pole and fixture installation activities. 1st Phase: Isakov Avenue, Tairov Street from Victory Bridge to intersection of Zvartnots Airport, 2015 The demonstration project is implemented in the frames of Statement of Intent signed between UNDP in Armenia and Yerevan municipality in August 2014. Length of the Street: 9 km Funding: UNDP-GEF Project - 80%, Yerevan Municipality - 20% Before: After: Indicators of lighting system High Pressure LED Benefits Sodium fixtures fixtures Quantity of fixtures 756 482 Decreased: 274 Average luminance level, lx (norm: 20) 16 26 Increase: 10 Total installed capacity, kW 216 79 Decreased: 137 Annual electricity consumption, MWh 794.3 291.1 Energy saving: 503.2 Annual GHG emissions, tCO2 352.6 129 Reduction: 223.4 Annual operation and maintenance costs, USD 71 632 26 252 Savings: 45 380 Main benefits of pilot project implementation Installed capacity and energy consumption decreased by 63% in the street lighting system. Annual greenhouse gas emissions were reduced by about 223.4 tCO2. Establishment of a special revolving fund for energy efficiency related projects at Yerevan Municipal Illumination CJSC of the Yerevan municipality. Before After 2nd Phase: Victory Bridge, Mashtots Avenue, 2016 As a result of the Pilot Project's 1st phase the savings, accumulated in the municipal special revolving fund for energy efficiency related projects were used for the 2nd phase of the demonstration projects. Length of streets: 2.64 km Funding: UNDP-GEF Project - 50%, Revolving Fund of Yerevan municipality - 50% Before: After: Benefits Indicators of lighting system High Pressure LED Sodium fixtures fixtures Quantity of fixtures 516 334 Decreased: 182 Average luminance level, lx (norm: 20) 16 26 Increased: 10 Total installed capacity, kW 116.9 30.5 Decreased: 86.4 Annual electricity consumption, MWh 396.4 103.4 Energy saving: 293 Annual GHG emissions, tCO2 176 46 Reduction: 130 Annual operation and maintenance costs, USD 37 316 9 737 Savings: 27 578 Main benefits of pilot project implementation Installed capacity and energy consumption decreased by 74% in the street lighting system; Annual greenhouse gas emissions were reduced by about 130 tCO2. 2 “Green Urban Lighting” UNDP-GEF/00074869 project Long-term objectives The accumulation of the cost savings in the energy efficiency revolving fund of the Yerevan municipality enables municipality to invest in improvement of energy performance of the lighting systems on continuous basis. Before After 3rd Phase: Atenk Street, Brazil Square and Tsitsernakaberd Road, 2017 As a result of the Pilot Project's 1st and 2nd phases, the savings accumulated in the municipal special revolving fund for energy efficiency related projects were used for the 3rd phase demonstration projects. Length of streets: 3.5 km Funding: Revolving Fund of Yerevan municipality: 100% Before: After: Indicators of lighting system High Pressure LED Benefits Sodium fixtures fixtures Quantity of fixtures 308 192 Decreased: 116 Average luminance level, lx (norm: 20) 16 26 Increased: 10 Total installed capacity, kW 87.78 24.24 Decreased: 63.54 Annual electricity consumption, MWh 297.6 82.2 Energy saving: 215.5 Annual GHG emissions, tCO2 132.1 36.5 Reduction: 95.6 Annual operation and maintenance costs, USD 26 388 7 287 Savings: 19 100 Main benefits of pilot project implementation Installed capacity and energy consumption decreased by 72% in the street lighting system; Annual greenhouse gas emissions were reduced by about 95.6 tCO2. 3 “Green Urban Lighting” UNDP-GEF/00074869 project 4th Phase: Arshakunyats avenue, 2017 As a result of the Pilot Project's 1st, 2nd and 3rd phases, the savings accumulated in the municipal special revolving fund for energy efficiency related projects were used for the 4th phase demonstration projects. Length of streets: 4 km Funding: Revolving Fund of Yerevan municipality: 100% Before: After: Indicators of lighting system High Pressure LED Benefits Sodium fixtures fixtures Quantity of fixtures 508 250 Decreased: 258 Average luminance level, lx (norm: 20) 16 26 Increased: 8 Total installed capacity, kW 144.8 53.25 Decreased: 91.53 Annual electricity consumption, MWh 490.9 180.6 Energy saving: 310.36 Annual GHG emissions, tCO2 218.0 80.2 Reduction: 137.8 Annual operation and maintenance costs, USD 36 753.8 13 518.0 Savings: 23 235.8 Main benefits of pilot project implementation Installed capacity and energy consumption decreased by 63% in the street lighting system; Annual greenhouse gas emissions were reduced by about 137.8 tCO2. Other advantages Level and uniformity of illumination were brought into compliance with the effective norms thus ensuring higher road safety; Transparent system of monitoring of higher energy savings and illumination, and lower greenhouse gas emissions; Rationale of a proper incorporation of energy savings in the lighting system into the town’s energy action plan of 2016; The accumulation of the cost savings in the energy efficiency revolving fund of the Yerevan municipality enables municipality to invest in improvement of energy performance of the lighting systems on continuous basis. 4 “Green Urban Lighting” UNDP-GEF/00074869 project .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us