ENGINE COMPANY STANDARDS Quick Reference Sheet

ENGINE COMPANY STANDARDS Quick Reference Sheet

445 North Main St Lakeport, CA 95453 Phone: (707) 263-4396 Fax: (707) 262-1283 ENGINE COMPANY STANDARDS Quick Reference Sheet : #: Evolution: Firefighter: Engineer: Captain: 1 Crosslay/Pre-Connect · Don SCBA · Spot appropriately · Don SCBA 1:45 · Pull/flake 1¾” · Brake/pump · Irons/TIC · Min. 50' feet at · Pull/flake any left over · On air objective 1¾” hose · Assist Firefighter · On air · Charge line to · Bleed 1 ¾” & advance appropraite psi 2 Supply · 5” wet supply, no kinks · Brake/pump · Don SCBA Crosslay/Preconnect · Don SCBA & on air · Establish 5” supply · Iron/TIC 3:00 · Operate 1¾” · Charge line to · Pull/flake 1¾” appropriate psi · On air-assist Firefighter 3 Ladder Hose Aloft · Don SCBA · Spot 50’ from balcony · Don SCBA 3:40 · Ladder balcony · Brake/pump · Pull/flake 1¾” · 100’ of 1 ¾” over ladder · Pull/flake any left over 1 · Irons/TIC & flake ¾” · Tie off 100’ coupling · On air · Strap to 100’ coupling · On air · Bleed 1 ¾” & advance · Foot ladder · Assist Firefighter · Charge line to appropriate psi 4 Supply Blitz · 5” wet supply, no kinks · Spot appropriately · Don SCBA 3:20 · Don SCBA · Brake/pump · Irons/TIC · On air · Establish 5” Supply · Pull/flake 2 ½” Blitz · Operate 2 ½” Blitz · Charge line to 74 psi · On air · Assist Firefighter 5 Metro Pack · Don SCBA · Brake/pump · Don SCBA 3:35 · Metro Pack/Irons · Break 3” Trunk Line · Iron/TIC · Remove Metro strap/ · Establish/Supply Trunk · Pull/flake 3” Trunk Line Open Metro Line · Connect Metro Pack to · On air - stretch Metro · Charge line to Wye and charge Pack appropriate psi · On air-assist Firefighter 6 Blitz/Dry Supply · Dry 5” supply · Brake/pump · Don SCBA 2:20 · Don SCBA · Connect 5” supply · Iron/TIC · Stretch 2½” Blitz · Charge line to 74 psi · Assist Firefighter · Operate line · Communicate with 2nd due Engine 7 Driveway Lay · Removes 3” or 5” and · Brake/pump · Don SCBA 3:35 orange cone · Connect 3” or 5” supply · Iron/TIC · Anchors 3” or 5”, “GO” · Charge 1 ¾” to · Pull/flake 1 ¾” · Drops cone next to hose appropriate psi · Assist Firefighter · Don SCBA · Communicates with 2nd · Operate 1 ¾” due Engine 8 FDC Spinkler Supply · Pull 3”, remove wye · Spot appropriately · Connect both female 2:30 · Break second coupling · Brake/pump couplings of FDC · Attach both males FDC · Establish 5” supply Supply lines to Engine · “WATER” · Charge both to discharges appropriate psi For 2-0 Staffed Companies: Roles and responsibilities should be delagated between members which best facilitates easy of accomplishment in a timely manner and is subjective to each evolution. For 4-0 Staffed Companies: The 4th member should fill the Backup FF Role. Exact respnsibilities should be delegated by the company officer or senior member. Page 2 of 25 445 North Main St Lakeport, CA 95453 Phone: (707) 263-4396 Fax: (707) 262-1283 ENGINE COMPANY STANDARDS Quick Reference Sheet : #: Evolution: Firefighter: Engineer: Captain: 9 Monitor Extension · Don SCBA · Fog nozzle on monitor · Don SCBA 7:00 · Remove wye from 3” · Remove monitor w/ base · Receive monitor and · Acquire 2nd male & hand to Captain base from Engineer coupling · Breaks both 3” supply · Proceed to objective · Stretches both males to couplings and attaches with both moitor & base objective to discharges · Assemble/Connect · Forms loops with both · Establish 5” Supply Monitor/Base 3” inch lines · Charge both 3” to · Call for “WATER” · Assist captain in appropriate psi assembling or connecting monitor 10 Relay Pump · 1ST ENGINE · 1ST ENGINE · 1ST ENGINE 3:50 · 5” dry supply, cone · Stop at hydrant · Don SCBA · Don SCBA · Brake/pump · Direct FF · Pull/flake 1 ¾” · Break/attach supply · On air-assist Firefighter · “WATER” · Charge 1 ¾ to · 2nd ENGINE · On air- operate line appropriate PSI · Don SCBA · 2nd ENGINE · Charge back up line · 6’ Hook · Don SCBA · 2nd ENGINE · Two-out · Irons · Spot hydrant · Assist FF · Pull back up line · Brake/pump · Two-out · Charge 5” to appropriate psi 11 Wildland Hoselay · Hose pack · Brake/pump 130 PSI · Determine anchor point 7:15 · On nozzle (1st position) · Don hose pack · 30’-50’ back, McLeod · Stretch lead 1½” · Charge lead line · Support hose lay, LCES · Establish anchor point · 2nd position on hose lay 12 High/Low Rise Portable · Don SCBA · Don SCBA · Don SCBA Standpipe · 2½” “nozzle” high rise · Assist in flaking 3” · Irons/TIC/High Rise Bag 6:00 bundle on SCBA behind Captain · “Minute Man” shoulder · “Minute Man” shoulder · If needed “Minute Man” 50’ behind FF 50’ of 3” with wye shoulder additional 3” · Proceed to objective/ · Proceed to objective · Keep track of 3” used communicate with · Flake 2½” Bundle, · Chase 3” kinks Engineer additional connect female to · Charge 3” to appropriate needed 3” Captains Bundle pressure · Flake 2½”, connect · Assist in flaking 3” · Communicate 2nd Due female to wye, charge · On air, operate line for supply · On air, assist FF · On air, assist crew Note: Per Cal/OSHA 29CFR1910: “2 In 2 Out” must be established prior to any interior fire ground operations whenever there is a possibility that a IDLH (Immediately Dangerous to Life and Health) atmosphere exists. Page 3 of 25 445 North Main St Lakeport, CA 95453 Phone: (707) 263-4396 Fax: (707) 262-1283 ENGINE COMPANY STANDARDS Quick Reference Sheet : #: Evolution: Firefighter: Engineer: Captain: 13 Reverse FDC Sprinkler · Pull 3”, remove wye · Wait for “GO”, reverse · Don SCBA/spare bottle Supply · Break second coupling out to hydrant · Assist FDC connection 4:30 · Attach both males FDC · Brake/engage pump with FF · Call for “WATER” · Establish water supply · Communicate with IC · Join Captain · D/C 3” lines, connect to · Acquire further discharges assignment · Charge lines, 150 PSI · Remove kinks 14 Reverse Attack Engine · Don SCBA · Stop near attack Engine · Don SCBA Supply · Remove 5” Hydrant · Wait for FF signal “GO” · Acquire tools 3:15 adapter · Reverse lay to hydrant · Acquire further · Place adapter in brass · Establish 5” supply assignment from IC box of OWN Engine · Join Captain · Assign Company · Connect 5” to Attack Engine · Signal “GO” · Join Captain 15 Low Angle Descent · Retrieve rescue · Retrieve rescue · Pick anchor point 4:40 equipment, flashlight, equipment, flashlight, · Safety check system red bag red bag · Tends brake · Don seat harness · Set up anchor & system · Serve as safety officer · Pad edge of bank · Lower FF to Victim · Attach rope to harness, place red bag on back · Descend, adjust prussik 16 Remote Monitor · Hand down monitor · Wait for “GO”, reverse · Receive monitor 6:35 · Don SCBA to hydrant · Don SCBA · Pull/anchor both 3”, · Brake/pump · Select location “GO” · Establish 5” supply · Assemble monitor/hose · 3” loops for monitor · Charge 3” Lines · “WATER”-adjust angle · Assist Captain · Return to engine · Return to engine 17 “Bump & Run” Structure · Pull 100’ 1 ½” · Back in to structure · Pull 100’ 1 ½” Protection · Deploy around structure · Brake/pump · Deploy around other side 3:10 · Shut down/bleed hose · Assist with pull/flake of structure · Shoulder/drain hose · Charge pre-connect · Shut down/bleed hose · Secure to rear Engine appropriate PSI · Shoulder/drain hose · Return to cab · Attach 2 ½” x 1 ½” to · Secure to rear Engine rear 2 ½” discharge · Return to cab · Shutdown/disconnect pre-connect to drain BOLD = If Applicable · Attach hoses to wye · Secure hoses rear Engine · Return to cab Note: Per Cal/OSHA 29CFR1910: “2 In 2 Out” must be established prior to any interior fire ground operations whenever there is a possibility that a IDLH (Immediately Dangerous to Life and Health) atmosphere exists. Page 4 of 25 445 North Main St Lakeport, CA 95453 Phone: (707) 263-4396 Fax: (707) 262-1283 ENGINE COMPANY STANDARDS Quick Reference Sheet : #: Evolution: Firefighter: Engineer: Captain: 18 RIC Rescue · Don SCBA · Don SCBA · Don SCBA 2:30 · RIC pack to entry point · On air · On air · On air · Locate downed FF · Locate downed FF · Locate downed FF · Place RIC tarp next to · CAN= Conditions, · PAC= PASS, Air, victim Actions, Needs Communicate · Roll victim into tarp · Transmit victim info to · Attach RIC pack · Secure victim to tarp IC regulator to victim · Attach RIC pack to · Extricate w/ crew · Remove victims SCBA victim · Extricate w/ crew · Extricate w/ crew 19 Engine Company Evolution: · 1ST ENGINE · 1ST ENGINE · 1ST ENGINE Establish “2-OUT” Line · “Supply Crosslay/Pre- · “ Supply Crosslay/Pre- · “ Supply Crosslay/Pre- 4:00 connect” standard connect” standard connect” standard · Wait for two-out · SCBA next to pump · Wait for two-out · 2nd ENGINE · Establish two out with · 2nd ENGINE · Don SCBA 2nd Engineer · Don SCBA · Back up line to entry · 2nd ENGINE · On air, advance line point · Don SCBA · On air, advance line · Face to face w/ first Engineer · Proceed to entry point · Advise IC-“Two out established” · Monitor tactical channel 20 Emergency Decon Station · Don SCBA · Brake/pump · Don SCBA 1:40 · Salvage cover · Don SCBA · Highway blankets · Hold salvage cover for · Charge/pull booster line · Hold salvage cover for privacy · Start rinsing victims privacy · Advise victims to disrobe · Provide blankets 21 Emergency SCBA Buddy Rescuer # 1 Rescuer # 2 N/A Breathe · Don SCBA, on air · Don SCBA, on air 2:45 · Locate downed FF · Locate downed FF · Silence PASS · Transmit victim info to · Asses LOC, air, SCBA IC condition, identity, · Assist in moving entrapment downed FF Prone · Relay info to R2 · Prepare downed FF for · Place victim in prone removal (Waist Strap and remove dual EBSS Conversion) · Connect dual EBSS · Remove victim · Maintain distance <3’ · Remove victim Note: Per Cal/OSHA 29CFR1910: “2 In 2 Out” must be established prior to any interior fire ground operations whenever there is a possibility that a IDLH (Immediately Dangerous to Life and Health) atmosphere exists. Page 5 of 25 445 North Main St Lakeport, CA 95453 Phone: (707) 263-4396 Fax: (707) 262-1283 ENGINE COMPANY STANDARDS Quick Reference Sheet : 1.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    25 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us