Project Stories

Project Stories

PROJECT STORIES 1. BTG/Plant Upgrade PLANT 1.1 Boryeong Unit 1, 2 TPP Upgrade (Korea) 1.2 Bandel Unit 4 Plant Upgrade (India) 1.3 Eraring Unit 1-4 Plant Upgrade (Australia) UPGRADE 1.4 Morupule A Unit 1-4 Retrofit (Botswana) 2. Boiler Upgrade 2.1 Hsinta Boiler Performance Improvement (Taiwan) 2.2 Castle Peak TPP Emission Control (Hong Kong) 2.3 Ratcliffe SCR Add-on (UK) 2.4 Yeongdong Biomass Conversion (Korea) 2.5 Gardanne Biomass Conversion (France) 2.6 Korea Zink co. Boiler Upgrade (Korea) 3. Turbine-Generator Upgrade 3.1 Sabarmati E&F TG Upgrade (India) 3.2 Muja TPP Stator Rewinding (Australia) 4. AQCS Upgrade 4.1 Orot Rabin Unit 5 & 6 FGD Add-on (Israel) 4.2 Shinboryeong Unit 1 & 2 FGD Add-on (Korea) Copyright by Doosan Heavy Industries & Construction Co., Ltd. All Rights Reserved. PROJECT STORIES BTG/Plant Upgrade DOOSAN POWER SERVICES 1.1 Boryeong Unit 1, 2 TPP Upgrade (Korea) Plant ∙ OEM BLR: B&W / TBN: Toshiba PROJECT OVERVIEW Information ∙ Plant Type Subcritical coal-fired PJT title ∙ Capacity / COD 516MW x 2 Units / 1983 Boryeong Unit 1, 2 Plant ∙ Boiler Steam drum, Natural circulation Upgrade ∙ Turbine TC4F – 3 Casings Client ∙ Generator Water/Hydrogen cooled type KOMIPO 1) Contract year 2007 Customer ∙ Performance upgrade (Output, Efficiency) Needs ∙ Lifetime extension PJT period Total 27 months ∙ Installation period Scope of Replacement of S/H, R/H for the heating surface 3 months / Unit Supply ∙ New installation of primary S/H inlet tube, dust economizer, low NOx combustion system PLANT LOCATION ∙ Upgrading steam turbine HIP steam path - Replacement of rotor, bucket, diaphragm, inner shell, etc. Boryeong City, Korea ∙ Generator stator full rewinding with rotor re-insulation Customer ∙ Capacity increase: 516MW → 535MW (approx. 3.7% ↑) Benefits ∙ Efficiency increase ∙ Lifetime extension: More than 15 years ∙ Reduced maintenance cost and coal consumption ∙ Improved low load operations ∙ Reducing environmental impacts of emissions 1) KOMIPO: Korea Midland Power Co., Ltd. PROJECT STORIES BTG/Plant Upgrade DOOSAN POWER SERVICES 1.2 Bandel Unit 5 Plant Upgrade (INDIA) Plant ∙ OEM BHEL (BLR: Babcock / TBN: LMZ) PROJECT OVERVIEW Information ∙ Plant Type Subcritical coal-fired PJT title ∙ Capacity / COD 210MW x 1 Unit / 1982 Bandel Unit 5 Plant R&M ∙ Boiler Conventional drum type Client ∙ Turbine TC3F – 3 Casings WBPDCL ∙ Generator Water/Hydrogen cooled type Contract year 2012 Customer ∙ Performance upgrade (Output, Efficiency) PJT period Needs ∙ Lifetime extension Total 27 months (-PAC) / Unit Installation period Scope of ∙ Replacement of S/H, R/H, Eco. tube to increase boiler heating surface 6 months / Unit Supply (installation/commissioning) ∙ New wind box, low NOx BNR, PF piping and etc. ∙ Retrofitting soot blowing system & increasing mill capacity PLANT LOCATION ∙ Upgrading turbine steam path ∙ → Bandel, West Bengal State, India Replacing existing generator (Water-cooled Air-cooled generator) ∙ Upgrading plant I&C system & DCS Customer ∙ Capacity increase: 210MW → 215MW (approx. 2.4% ↑ ) Benefits ∙ Efficiency increase ∙ Lifetime extension: 20 years or more ∙ Availability and reliability improvement ∙ Reduced maintenance cost & optimized trouble-shooting ∙ Incorporation of modern technologies PROJECT STORIES BTG/Plant Upgrade DOOSAN POWER SERVICES 1.3 Eraring Unit 1-4 Upgrade (Australia) Plant ∙ OEM BLR: IHI / TBN: Toshiba PROJECT OVERVIEW Information ∙ Plant Type Subcritical coal-fired PJT title ∙ Capacity / COD 660MW x 4 Units / 1982 Eraring Unit 1-4 Plant R&M ∙ Boiler Twin steam drum, Natural circulation Client ∙ Turbine TC4F – 4 Casings Eraring Energy ∙ Generator Water/Hydrogen cooled type Contract year 2007 Customer ∙ Performance upgrade (Output, Efficiency) PJT period Needs ∙ Lifetime extension Total 26 months / Unit ∙ Cyclic operation (Flexibility) Installation period 6 months / Unit (installation/commissioning) Scope of ∙ Upgrade & replacement of boiler’s S/H, R/H and economizer Supply - Heating surface upgrade, increasing the heat recovery capacity PLANT LOCATION ∙ Upgrading steam turbine HIP steam path - Replacement of rotor, bucket, diaphragm, bearing, etc. Eraring, Australia - No. of stages/bucket active length extension ∙ Generator stator/rotor rewinding Customer ∙ Capacity increase: 660MW → 750MW (approx. 13.6% ↑) Benefits ∙ Efficiency increase - Boiler and turbine section (approx. 1-3% ↑ per unit) ∙ Lifetime extension: 20 years or more ∙ Use of eco-friendly technology - Carbon emissions reduction: 865g/kWh → 835g/kWh PROJECT STORIES BTG/Plant Upgrade DOOSAN POWER SERVICES 1.4 Morupule A Unit 1-4 Retrofit (Botswana) Plant ∙ OEM #1, 2, 3 – Boiler: Lentjes / Turbine: Parsons PROJECT OVERVIEW Information #4 – Boiler: Lentjes / Turbine: Toshiba PJT title ∙ Plant Type Coal-fired Morupule A Unit 1-4 Retrofit ∙ Capacity / COD 33MW x 4 Units / 1986 (#1-3), 1989 (#4) Client ∙ Boiler Steam drum, Natural circulation BPC (Botswana Power Corp.) ∙ Turbine 1 Casing Contract date ∙ Generator Water/Hydrogen cooled type December, 2015 PJT period Customer ∙ Urgent electricity generation recovery Total 24 months Needs ∙ Compliance with environmental regulation Installation period ∙ Lifetime extension 5 months for each unit Scope of ∙ Replacement of boiler’s S/H, R/H and economizer PLANT LOCATION Supply ∙ Turbine overhaul (#1, 2, 4) and replacement (#3) ∙ Generator stator/rotor rewinding (#1 ,2, 4) and replacement (#3) Palapye, Botswana ∙ New installation of FGD ∙ Extension of ash dam Customer ∙ Capacity increase (#3): 33MW → 37.9MW (approx. 4.9MW ↑) Benefits ∙ Efficiency increase ∙ Lifetime extension: Up to 15 years ∙ Reduced maintenance cost and coal consumption ∙ Reducing environmental impacts of emissions PROJECT STORIES BOILER UPGRADE DOOSAN POWER SERVICES 2.1 Hsinta Boiler Performance Improvement (Taiwan) Plant ∙ OEM Foster Wheeler PROJECT OVERVIEW Information ∙ Plant Type Subcritical coal-fired PJT title ∙ Capacity / COD 500MW x 2 unit / 1982 Hsinta Boiler Performance ∙ Steam Condition 166 bar / 542°C / 542°C Improvement ∙ Boiler Conventional drum type Client Taiwan Power Company Scope of ∙ Replacement of heating surface along with additional soot blowing Contract year Supply system 2006 ∙ Modification/Addition of air and gas system, ductworks, air fans, fire protection system, ash handling system and required foundation works ∙ Replacement of air preheaters, pulverizers and PA fans ∙ Addition of new SCR for NOx control ∙ Efficiency increase PLANT LOCATION Customer Benefits ∙ Availability and reliability improvement Hsinta, Taiwan ∙ Eco-friendly technology application - NOx emissions ∙ Reduced maintenance costs and optimized trouble-shooting ∙ Incorporation of modernized technologies PROJECT STORIES BOILER UPGRADE DOOSAN POWER SERVICES 2.2 Castle Peak TPP Emission Control (Hong Kong) Plant ∙ Contractor Doosan Babcock PROJECT OVERVIEW Information ∙ OEM Boiler: BPL PJT title ∙ Plant Type Coal-fired CP Emission Control Project ∙ Capacity 4 X 660MWe (B Station) Client ∙ Boiler Subcritical, wall-fired PC boiler (CLP) China Light & Power ∙ COD 1986 Contract year 2007 Customer ∙ Emission reduction (NOx) PJT period Needs ∙ Lifetime extension 2007-2010 Scope of ∙ Boosted over fired air (BOFA) on all four units on an EPC basis Supply (330m of duct, 600t additional steel) ∙ Optimised selective catalytic reduction (OSCR) on all four units on an EPC basis PLANT LOCATION - SCR civils Tuen Mun NT, Hong Kong - SCR mechanical - SCR EC&I - Ammonia injection grid - Urea storage system - Feed water piping modifications - Air heater cold end element upgrade and new sealing system Customer ∙ 75% NOx reduction through the combination of BOFA and OSCR Benefits ∙ Lifetime extension of an existing plant PROJECT STORIES BOILER UPGRADE DOOSAN POWER SERVICES 2.3 Ratcliffe SCR Add-on (UK) Plant ∙ Plant Type Coal-fired PROJECT OVERVIEW Information ∙ Capacity 500MW x 4 Units PJT title ∙ Boiler Subcritical, conventional drum type Ratcliffe SCR ∙ Turbine TC3F – 3 Casings Client ∙ COD 1967 E.ON/UK Plc Contract year Customer ∙ Emission reduction (NOx) 2008 Needs ∙ High availability and flexibility PJT period 5 years Scope of ∙ On-site service team Supply ∙ Supply of new SCR to all 4 x 500MW subcritical units ∙ Partial replacement of boiler pressure parts ∙ Supply of an air pollution control system PLANT LOCATION ∙ Technical support provided by highly skilled service engineers – approximately 4,000 people on site working in confined operational Nottinghamshire, England, UK areas ∙ Annual installation completed during a unit shutdown while other 3 units remaining fully operational – no loss of boiler efficiency Customer ∙ Strong open contracting relationship to minimize risk on challenging Benefits retrofit project ∙ Achieving NOx emissions levels of 100mg/NM3 in a steady-state condition ∙ Extension of electricity generation in power station by the late 2020s PROJECT STORIES BOILER UPGRADE DOOSAN POWER SERVICES 2.4 Yeongdong Biomass Conversion (Korea) Plant ∙ Main Fuels Biomass (Wood pellet) PROJECT OVERVIEW Information ∙ Plant Type Coal-fired PJT title ∙ Output 125MW Yeongdong Fuel Conversion (Coal to Biomass) Scope of ∙ Engineering, procurement and construction for fuel conversion Client Supply - Biomass fuel belt conveying system KOEN - Biomass fuel milling system (Korea South-East Power Co.) - Biomass combustion system Contract year - Biomass PF transport system 2015 - Pressure part modification PJT period - Boiler draught system 18 months → Output: 100 % fuel conversion from coal to biomass Customer ∙ Helping the customer build a cleaner, higher

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us