Construction of Bye-Pass *44. Shri Mewa Singh, M.L.A. : Will The

Construction of Bye-Pass *44. Shri Mewa Singh, M.L.A. : Will The

Construction of Bye-Pass *44. Shri Mewa Singh, M.L.A. : Will the Deputy Chief Minister be pleased to state whether there is any proposal under consideration of the Government to construct any Bye-Pass for Ladwa City; if so, the details thereof togetherwith the time by which it is likely to be constructed ? ---------------------- DUSHYANT CHAUTALA DEPUTY CHIEF MINISTER, HARYANA No, Sir. STARRED ASSEMBLY QUESTION NO. 44 RAISED BY SH. MEWA SINGH, M.L.A., LADWA. NOTE FOR PAD Two number State Highways, Saharanpur-Kurukshetra road (SH-06) and Karnal- Ramba-Indri-Ladwa-Shahbad road (SH-07) cross Ladwa City. Saharanpur-Kurukshetra road (SH-06) is already 4-laned in Ladwa City portion for a length of 3.95 kms. (from km. 59.35 to km. 63.20). There need of 4-laning of Karnal Ramba-Indri-Ladwa-Shahbad road (SH-07) from District boundary Karnal/Kurushetra upto Ladwa (from km. 27.800 to 32.820 km.) for a length of 5.02 km., as from District boundary Karnal/Kurukshetra upto NH-44, Baldi Mor, Karnal this road is being 4-laned. There is no proposal for construction of bypass of Ladwa City. However, Patiala- Pehowa-Kurukshetra-Ladwa-Yamunanagar road was declared ‘in-principle’ National Highway subject to outcome of DPR by Ministry of Road Transport and Highways (MORT&H), Government of India. The work of preparation of DPR was entrusted to Indian Academy of Highway Engineers (IAHE), Noida by MORT&H. Later on this DPR was assigned to Punjab PWD by MORT&H by signing tripartite agreement between IAHE, Punjab PWD and the consultant for preparation of DPR. The consultant had prepared feasibility study and Ladwa bypass in a length of 8.90 km. was proposed in this feasibility study on Southern side. But all the DPRs of ‘in-principle’ has been put on hold by MORT&H and therefore, the work of preparation of DPR could not proceed further. In view of above, there is no proposal of construction of bypass for Ladwa City. (A) The total length of roads in Ladwa Constituency is as under: (i) National Highways -- NIL (ii) State Highways -- 48.35 Km. (iii) Major District Roads -- NIL (iv) Other District Roads -- 287.98 Km. Total -- 336.33 Km. (B) Condition of roads in Ladwa Constituency (i) Road length in Very Good condition -- 106.46 Km. (ii) Road length in Good condition -- 65.85 Km. (iii) Road length in bad condition -- 34.54 Km. (iv) Road length in progress -- 34.54 Km. (C) Patch work Pot holes repair/Surface dressing. (i) Pot hole repair = 233.38 Km. (ii) Surface dressing = NIL (D) Length of roads constructed / repaired in Ladwa constituency 01.11.2014 to 31.01.2020 (Length in Km.) Sr. Item 2014-15 2015-16 2016-17 2017-18 2018-19 01.04.2019 Total No. to 31.01.2020 1 Construction of new - - - 2.45 - - 2.45 roads 2 Widening/ 17.25 50.73 38.28 13.83 - 4.50 124.59 Strengthening/ Raising etc. of roads 3 Improvement of 0.65 1.49 17.93 24.99 20.04 8.08 73.18 Road Total 17.90 52.22 56.21 41.27 20.04 12.58 200.22 (E) Since 01.11.2014 to 31.01.2020 in Ladwa constituency year wise expenditure incurred on various roads activities is as under:- (Expenditure : Rs. in lacs) Sr. Item 2014-15 2015-16 2016-17 2017-18 2018-19 01.04.2019 Total No. to 31.01.2020 1 Construction of 0.00 0.00 38.98 62.15 0.00 0.00 101.13 new roads 2 Widening/ 436.27 1414.81 1255.25 1316.17 1008.37 527.67 5958.54 Strengthening/ Raising etc. of roads 3 Cement 0.00 0.00 158.50 0.00 0.00 0.00 158.50 Concrete/Block pavement 4 Annual 0.00 201.14 0.00 169.08 0.00 0.00 370.22 surfacing/premix carpet of roads. 5 Annual 33.79 82.74 48.84 44.28 33.17 131.91 374.73 maintenance of roads Total 470.06 1698.69 1501.57 1591.68 1041.54 659.58 6963.12 (F) Since 01.11.2014 to 31.01.2020 in Ladwa constituency year wise expenditure incurred on various roads activities is as under:- (Expenditure : Rs. in Lacs) 01.11.2014 to 2015-16 2016-17 2017-18 2018-19 01.04.2019 Total 31.03.2015 to 31.01.2020 5.18 4.75 4.03 68.57 141.33 409.02 632.88 (G) Since 01.11.2014 to 31.01.2020, 87 road works amounting to Rs. 101.34 Crore and 6 No. Building works amounting to Rs. 1.52 Crore have been completed. (i) Road Works Sr. Name of work Head of Amount (Rs. No. Account In Lacs) 1. Strengthening of G.T. road to Akalgarh via Babain 3054 R&B 689.28 Sanghore (ID 7948) RD km. 0.00 to 12.40. 2. Up-Gradation of Ladwa Hinori Road (Inter District PMGSY-II 624.32 Road) In District Kurukshetra RD km. 0.00 to 6.79 in Distt. Kurukshetra 3. Up-Gradation of Road From Yara To Buhawa – PMGSY-II 574.08 Buhawi – Lakhmari – Bir Mangoli In District Kurukshetra RD km. 0.00 to 9.00 in Distt. Kurukshetra 4. Up-Gradation of Road From Babain To Akalgarh Via PMGSY-II 639.60 Sanghore Upto District Boundary In District Kurukshetra (MRL-02) RD km. 12.40 to 22.90 5. Repair of Ladwa Hinori road to Budha in a length of 3054 R&B 10.30 0.68 Km. (ID 7893) 6. Repair of Ladwa Hinori road to Badarpur in a length 3054 R&B 5.21 of 0.24 Km. (ID 7896) 7. Repair of Ladwa Indri road to Lathi Dhanoura in a 3054 R&B 2.60 length of 0.12 Km. (ID 7898) 8. Repair of Ladwa Raipur road to Jainpur in a length of 3054 R&B 5.84 0.27 Km. (ID 7907) 9. Repair of Ladwa Hinori road to Anaj Mandi Ladwa in 3054 R&B 5.51 front of FCI Godown 10. Repair of Hinori road to Saharanpur Kurukshetra road 3054 R&B 19.85 via Cinema Chowk (Red Road) in a length of 1.08 Km. (ID 7910) 11. Repair of Simbalwal to Phalsanda Jattan in a length of 3054 R&B 10.20 0.93 Km. (ID 7919) 12. Repair of Link road to Mangola in a length of 0.75 3054 R&B 9.82 Km. (ID 7927) 13. Repair of S.L. road to Guhan in a length of 0.65 Km. 3054 R&B 4.58 (ID 7928) 14. Repair of S.L. road to Bir Sujra in a length of 0.60 3054 R&B 4.24 Km. (ID 7934) 15. Repair of S.L. road to Dhanoura in a length of 1.20 3054 R&B 11.51 Km. (ID 7935) 16. Repair of Indri Chowk to Shahabad Ladwa road via 3054 R&B 9.17 PWD Rest House in a length of 0.50 Km. (ID 7946) 17. Repair of Ladwa Mustfabad road to Gudha in a length 3054 R&B 5.27 of 0.75 Km. (ID 7979) 18. Repair of Umri Indri Daulatpur road to Dehru Majra 3054 R&B 4.40 in a length of 0.20 Km. (ID 8072) 19. Repair of G.T. road to Ramgarh in a length of 0.90 3054 R&B 7.88 Km. (ID 8068) 20. Repair of Samalkha to Harijan Basti Samalkha in a 5054 R&B 11.15 length of 0.60 Km. (ID 7988) (SCSP) 21. Repair of Saharanpur Kurukshetra road to Village 5054 R&B 96.86 Karami in a length of 4.00 Km. (ID 7958) (SCSP) 22. Repair of Ladwa Raipur road in a length of 4.36 Km. 5054 R&B 107.50 (ID 7902) 23. Repair of S.L. road to Sujri in a length of 1.03 Km. 5054 R&B 20.00 (ID 7913) 24. Repair of Yara to Chand majra in a length of 1.20 Km. 5054 R&B 25.00 (ID 7922) 25. Repair of Ram Nagar to Kandauli in a length of 2.05 5054 R&B 56.00 Km. (ID 7931) 26. Repair of S.L road to Bhalar in a length of 0.28 Km. 5054 R&B 16.00 (ID 7936) 27. Repair of Lathi Dhanoura to Jainpur in a length of 3054 R&B 45.00 2.10 Km. (ID 7899) 28. Repair of Ladwa Indri road to Bhut Majra in a length 3054 R&B 48.00 of 2.52 Km. (ID 7901) 29. Repair of Ladwa Raipur road to Gobindgarh in a 3054 R&B 40.00 length of 1.30 Km. (ID 7904) 30. Repair of Ladwa Raipur road to Saleempur in a length 3054 R&B 44.58 of 1.80 Km. (ID 7905) 31. Repair of Ladwa Mustafabad road to Chapra in a 3054 R&B 25.00 length of 1.20 Km. (ID 7980) 32. Repair of S.K. road to Garoula in a length of 2.25 Km. 3054 R&B 45.00 (ID 7969) 33. Repair of Shahbad Ladwa road to Kalwa to Basti 3054 R&B 12.61 Schedule Caste 34. Repair of Sultanpur to Patak Majra in a length of 0.68 3054 R&B 15.14 Km. (ID 7941) 35. Repair of Link road to Dhanani in a length of 0.60 3054 R&B 10.10 Km.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us