Construction of Bye-Pass

*44. Shri Mewa Singh, M.L.A. : Will the Deputy Chief Minister be pleased to state whether there is any proposal under consideration of the Government to construct any Bye-Pass for Ladwa City; if so, the details thereof togetherwith the time by which it is likely to be constructed ?

------

DUSHYANT CHAUTALA DEPUTY CHIEF MINISTER,

No, Sir.

STARRED ASSEMBLY QUESTION NO. 44 RAISED BY SH. MEWA SINGH, M.L.A., LADWA.

NOTE FOR PAD

Two number State Highways, - road (SH-06) and - Ramba-Indri-Ladwa-Shahbad road (SH-07) cross Ladwa City. Saharanpur-Kurukshetra road (SH-06) is already 4-laned in Ladwa City portion for a length of 3.95 kms. (from km. 59.35 to km. 63.20). There need of 4-laning of Karnal Ramba-Indri-Ladwa-Shahbad road (SH-07) from District boundary Karnal/Kurushetra upto Ladwa (from km. 27.800 to 32.820 km.) for a length of 5.02 km., as from District boundary Karnal/Kurukshetra upto NH-44, Baldi Mor, Karnal this road is being 4-laned.

There is no proposal for construction of bypass of Ladwa City. However, Patiala- -Kurukshetra-Ladwa- road was declared ‘in-principle’ National Highway subject to outcome of DPR by Ministry of Road Transport and Highways (MORT&H), Government of . The work of preparation of DPR was entrusted to Indian Academy of Highway Engineers (IAHE), Noida by MORT&H. Later on this DPR was assigned to Punjab PWD by MORT&H by signing tripartite agreement between IAHE, Punjab PWD and the consultant for preparation of DPR. The consultant had prepared feasibility study and Ladwa bypass in a length of 8.90 km. was proposed in this feasibility study on Southern side. But all the DPRs of ‘in-principle’ has been put on hold by MORT&H and therefore, the work of preparation of DPR could not proceed further.

In view of above, there is no proposal of construction of bypass for Ladwa City.

(A) The total length of roads in Ladwa Constituency is as under:

(i) National Highways -- NIL (ii) State Highways -- 48.35 Km. (iii) Major District Roads -- NIL (iv) Other District Roads -- 287.98 Km. Total -- 336.33 Km. (B) Condition of roads in Ladwa Constituency (i) Road length in Very Good condition -- 106.46 Km. (ii) Road length in Good condition -- 65.85 Km. (iii) Road length in bad condition -- 34.54 Km. (iv) Road length in progress -- 34.54 Km.

(C) Patch work Pot holes repair/Surface dressing.

(i) Pot hole repair = 233.38 Km. (ii) Surface dressing = NIL

(D) Length of roads constructed / repaired in Ladwa constituency 01.11.2014 to 31.01.2020 (Length in Km.) Sr. Item 2014-15 2015-16 2016-17 2017-18 2018-19 01.04.2019 Total No. to 31.01.2020 1 Construction of new - - - 2.45 - - 2.45 roads 2 Widening/ 17.25 50.73 38.28 13.83 - 4.50 124.59 Strengthening/ Raising etc. of roads 3 Improvement of 0.65 1.49 17.93 24.99 20.04 8.08 73.18 Road Total 17.90 52.22 56.21 41.27 20.04 12.58 200.22

(E) Since 01.11.2014 to 31.01.2020 in Ladwa constituency year wise expenditure incurred on various roads activities is as under:-

(Expenditure : Rs. in lacs)

Sr. Item 2014-15 2015-16 2016-17 2017-18 2018-19 01.04.2019 Total No. to 31.01.2020 1 Construction of 0.00 0.00 38.98 62.15 0.00 0.00 101.13 new roads 2 Widening/ 436.27 1414.81 1255.25 1316.17 1008.37 527.67 5958.54 Strengthening/ Raising etc. of roads 3 Cement 0.00 0.00 158.50 0.00 0.00 0.00 158.50 Concrete/Block pavement 4 Annual 0.00 201.14 0.00 169.08 0.00 0.00 370.22 surfacing/premix carpet of roads. 5 Annual 33.79 82.74 48.84 44.28 33.17 131.91 374.73 maintenance of roads Total 470.06 1698.69 1501.57 1591.68 1041.54 659.58 6963.12 (F) Since 01.11.2014 to 31.01.2020 in Ladwa constituency year wise expenditure incurred on various roads activities is as under:- (Expenditure : Rs. in Lacs)

01.11.2014 to 2015-16 2016-17 2017-18 2018-19 01.04.2019 Total 31.03.2015 to 31.01.2020

5.18 4.75 4.03 68.57 141.33 409.02 632.88

(G) Since 01.11.2014 to 31.01.2020, 87 road works amounting to Rs. 101.34 Crore and 6 No. Building works amounting to Rs. 1.52 Crore have been completed.

(i) Road Works

Sr. Name of work Head of Amount (Rs. No. Account In Lacs) 1. Strengthening of G.T. road to Akalgarh via Babain 3054 R&B 689.28 Sanghore (ID 7948) RD km. 0.00 to 12.40. 2. Up-Gradation of Ladwa Hinori Road (Inter District PMGSY-II 624.32 Road) In District Kurukshetra RD km. 0.00 to 6.79 in Distt. Kurukshetra 3. Up-Gradation of Road From Yara To Buhawa – PMGSY-II 574.08 Buhawi – Lakhmari – Bir Mangoli In District Kurukshetra RD km. 0.00 to 9.00 in Distt. Kurukshetra 4. Up-Gradation of Road From Babain To Akalgarh Via PMGSY-II 639.60 Sanghore Upto District Boundary In District Kurukshetra (MRL-02) RD km. 12.40 to 22.90 5. Repair of Ladwa Hinori road to Budha in a length of 3054 R&B 10.30 0.68 Km. (ID 7893)

6. Repair of Ladwa Hinori road to Badarpur in a length 3054 R&B 5.21 of 0.24 Km. (ID 7896)

7. Repair of Ladwa Indri road to Lathi Dhanoura in a 3054 R&B 2.60 length of 0.12 Km. (ID 7898)

8. Repair of Ladwa Raipur road to Jainpur in a length of 3054 R&B 5.84 0.27 Km. (ID 7907)

9. Repair of Ladwa Hinori road to Anaj Mandi Ladwa in 3054 R&B 5.51 front of FCI Godown

10. Repair of Hinori road to Saharanpur Kurukshetra road 3054 R&B 19.85 via Cinema Chowk (Red Road) in a length of 1.08 Km. (ID 7910)

11. Repair of Simbalwal to Phalsanda Jattan in a length of 3054 R&B 10.20 0.93 Km. (ID 7919)

12. Repair of Link road to Mangola in a length of 0.75 3054 R&B 9.82 Km. (ID 7927)

13. Repair of S.L. road to Guhan in a length of 0.65 Km. 3054 R&B 4.58 (ID 7928)

14. Repair of S.L. road to Bir Sujra in a length of 0.60 3054 R&B 4.24 Km. (ID 7934)

15. Repair of S.L. road to Dhanoura in a length of 1.20 3054 R&B 11.51 Km. (ID 7935) 16. Repair of Indri Chowk to Shahabad Ladwa road via 3054 R&B 9.17 PWD Rest House in a length of 0.50 Km. (ID 7946)

17. Repair of Ladwa Mustfabad road to Gudha in a length 3054 R&B 5.27 of 0.75 Km. (ID 7979)

18. Repair of Umri Indri Daulatpur road to Dehru Majra 3054 R&B 4.40 in a length of 0.20 Km. (ID 8072)

19. Repair of G.T. road to Ramgarh in a length of 0.90 3054 R&B 7.88 Km. (ID 8068) 20. Repair of Samalkha to Harijan Basti Samalkha in a 5054 R&B 11.15 length of 0.60 Km. (ID 7988) (SCSP) 21. Repair of Saharanpur Kurukshetra road to Village 5054 R&B 96.86 Karami in a length of 4.00 Km. (ID 7958) (SCSP) 22. Repair of Ladwa Raipur road in a length of 4.36 Km. 5054 R&B 107.50 (ID 7902) 23. Repair of S.L. road to Sujri in a length of 1.03 Km. 5054 R&B 20.00 (ID 7913) 24. Repair of Yara to Chand majra in a length of 1.20 Km. 5054 R&B 25.00 (ID 7922) 25. Repair of Ram Nagar to Kandauli in a length of 2.05 5054 R&B 56.00 Km. (ID 7931) 26. Repair of S.L road to Bhalar in a length of 0.28 Km. 5054 R&B 16.00 (ID 7936) 27. Repair of Lathi Dhanoura to Jainpur in a length of 3054 R&B 45.00 2.10 Km. (ID 7899) 28. Repair of Ladwa Indri road to Bhut Majra in a length 3054 R&B 48.00 of 2.52 Km. (ID 7901) 29. Repair of Ladwa Raipur road to Gobindgarh in a 3054 R&B 40.00 length of 1.30 Km. (ID 7904) 30. Repair of Ladwa Raipur road to Saleempur in a length 3054 R&B 44.58 of 1.80 Km. (ID 7905) 31. Repair of Ladwa Mustafabad road to Chapra in a 3054 R&B 25.00 length of 1.20 Km. (ID 7980) 32. Repair of S.K. road to Garoula in a length of 2.25 Km. 3054 R&B 45.00 (ID 7969) 33. Repair of Shahbad Ladwa road to Kalwa to Basti 3054 R&B 12.61 Schedule Caste 34. Repair of Sultanpur to Patak Majra in a length of 0.68 3054 R&B 15.14 Km. (ID 7941) 35. Repair of Link road to Dhanani in a length of 0.60 3054 R&B 10.10 Km. (ID 7947) 36. Repair of Chhapra to Majri in a length of 0.50 Km (ID 3054 R&B 5.03 7981) 37. Repair of Saharanpur Kurukshetra road to PWD Rest 3054 R&B 1.79 House Ladwa via Hospital (ID 7908) 38. Repair of Ladwa Mustfabad road to Dhingla in a 3054 R&B 9.79 length of 0.55 Km. (ID 7977) 39. Repair of Shahabd Ladwa road to Kirki Viran in a 3054 R&B 10.83 length of 1.12 Km. (ID 7930) 40. Repair of Kanoni to Bir Kalwa in a length of 1.40 Km. 3054 R&B 14.44 (ID 7915/9975) 41. Repair of Barshami to Mandir Khera in a length of 3054 R&B 7.15 0.33 Km. (ID 7993) 42. Repair of Ladwa Hinori road to Bani in a length of 3054 R&B 11.50 1.20 Km. (ID 7895) 43. Improvement of G.T. road to Umri Indri Road in a 5054 R&B 200.00 length of 7.07 Km. (road ID :- 8070) 44. Repair of G.T. road to Kishanpura in a length of 0.11 5054 R&B 10.00 Km. (ID 8069)

45. Repair of Ladwa Indri road to Baroundi in a length of 3054 R&B 5.77 0.40 Km. (ID 7900) 46. Repair of Ladwa Hinori road to Bapdi in a length of 3054 R&B 4.83 0.48 Km. (ID 7892) 47. Repair of S.L. road to Hari Singh ka majra. in a length 3054 R&B 5.24 of 0.24 Km. (ID 7917) 48. Repair of S.K. road to Kheri Dabdlan in a length of 3054 R&B 11.54 1.50 Km. (ID 7964) 49. Repair of Ladwa Mustfabad road to Ganghori in a 3054 R&B 5.51 length of 0.39 Km. (ID 7982) 50. Repair of Jandhera to Jandhera School in a length of 3054 R&B 10.80 0.50 Km. (ID 7991) 51. Repair of Unteheri to Unteheri School in a length of 3054 R&B 7.89 0.36 Km. (ID 7974) 52. Repair of Saharanpur Kurukshetra road to Beholi 3054 R&B 4.40 Bazidpur in a length of 0.20 Km. (ID 7952) 53. Repair of S.L. road to Deeg in a length of 0.28 Km. 3054 R&B 6.18 (ID 8095) 54. Repair of Umri Indri road to Sodhi in a length of 0.30 3054 R&B 2.13 Km. (ID 8075) 55. Repair of Umri Daulatpur road to Dera Bajigran in a 3054 R&B 9.34 length of 0.88 Km. (ID 8073) 56. Repair of S.L. road to Isherheri in a length of 1.75 3054 R&B 33.00 Km. (ID 7912) 57. Repair of S.L. road to Sultanpur in a length of 1.50 3054 R&B 27.00 Km. (ID 7940) 58. Repair of Ram Nagar to Kasithal in a length of 1.46 3054 R&B 27.00 Km. (ID 7949) 59. Repair of Yara to Birthala in a length of 4.70 Km. (ID 3054 R&B 40.00 7923) 60. Improvement of Saharanpur Kurukshetra road to 3054 R&B 128.88 Barshami Dhanoura road in a length of 3.40 Km. (ID 7966) 61. Repair of Ladwa Mustfabad road to Jogi Majra in a 3054 R&B 12.42 length of 1.14 Km. (ID 7978)

62. Repair of Budha to Bani Chhano in a length of 1.95 3054 R&B 13.95 Km. (ID 7894) 63. Repair of Barshami Jandera road to Dera Purbian in a 3054 R&B 12.06 length of 1.20 Km. (ID 7968) 64. Repair of Marcheri to Marchera in a length of 2.25 3054 R&B 58.00 Km. (ID 7945) 65. Repair of Shahbad ladwa road to Mando Khera in a 3054 R&B 13.27 length of 1.65 Km. (ID 7911) 66. Improvement of Chhaper to Baronda in a length of 3054 R&B 180.00 3.80 Km. (ID 9974) 67. Saharanpur Kurukshetra road to Babain via Khairi- NABARD 638.21 Khaira -Bargat (ID 7973) 68. Saharanpur Kurukshetra road to Lohara upto Mini 5054 R&B 188.10 Bank (ID 7959) 69. Saharanpur Kurukshetra road to Umri via Gadli, 5054 R&B 196.65 Karhami,Kheri Gadian (ID 7970) 70. L/R from Ladwa M.bad road to Mehuwakheri (ID 5054 R&B 132.53 7984) 71. Umri road to Gadli via Karhami (ID 8074) 5054 R&B 213.75 72. Morthala to Jalkheri-Kharindwa (ID 8098) 5054 R&B 115.43 73. Morthala to Kalal majra-Ram Nagar Bhagwanpur (ID 3054 R&B 102.60 7942) 74. Construction of road from Mangoli Jattan to Foksa 5054 R&B 109.62 75. Ladwa Mustfabad road (ID 7975) 5054 R&B 299.25

76. Improvement of Barshami road to Jandhera 3054 R&B 24.09 Chhalaundi (ID 7967) in District Kurukshetra 77. Improvement of Ban S.K. road to Samalkhi Kheri 3054 R&B 10.23 Dabdlan (ID 9382) in District Kurukshetra ) 78. Improvement of Saharanpur Kurukshetra road to Sonti 3054 R&B 14.98 (ID 7971) in District Kurukshetra )

79. Improvement of Ladwa Mustfabad road to Jogi Majra 3054 R&B 18.01 (ID 7978) in District Kurukshetra ) 80. Improvement of Chhaper to Baronda (ID 9974) in 3054 R&B 0.25 District Kurukshetra ) 81. Improvement of G.T. road to Akalgarh Babain via 3054 R&B 53.00 Sanghore (ID 7948) in District Kurukshetra ) 82. Providing 20 mm thick PC on Shahbad Ladwa road PMGSY 64.96 (Babain) to Akalgarh via Sunarian (ID 7918) in District Kurukshetra ) 83. Providing 20 mm thick PC on G.T. road to Morthala PMGSY 27.30 via Masana-Dudla (ID 8067) in District Kurukshetra 84. Providing 20 mm thick PC on Ladwa Mustfabad road PMGSY 22.40 to Mehra Bakali Kharkali (ID 7976) in District Kurukshetra 85. Shahbad Ladwa road (S.H.No.7) Km 41.00 to 43.100 3054 R&B 780.20 and Km. 45.500 to 55.00 86. Shahranpur Kurukshetra road (SH-6) Km 55.00 to 3054 R&B 2783.92 76.150 (ID 7951) 87. Umri road (Km 0 to 1.32 under HUDA) 1.32 5054 R&B 213.75 to 6.34 (ID 8057) Total 10161.61

(ii) BUILDING WORKS

Sr. Name of work Head of Amount (Rs. No. Account In Lacs) 1 Special repair of Rest House Building at Ladwa 2059-PW 11.08

2 Special repair Govt. I.T.I. at Umri, Kurukshetra in 4250-CO 25.93 Distt. Kurukshetra 3 Providing white washing and painting in Community 2059 M&R 14.20 Health Centre at Mathana in District Kurukshetra 4 Construction of Veterinary Hospitals in Village NABARD- 35.83 Sunarian in Distt. Kurukshetra RIDF-XXIII

5 Construction of Veterinary Hospitals in Village NABARD- 32.58 Haripur in Distt. Kurukshetra RIDF-XXIII

6 Construction of Veterinary Hospitals in Village Yara NABARD- 32.58 in Distt. Kurukshetra RIDF-XXIII

Total 152.20

(H) 6 Nos. road works with estimated cost of Rs. 1031.37 Lacs and 4 No. building works with estimated cost of Rs. 2073.18 lacs are in progress.

(i) Road Works

Sr. Name of work Head of Amount (Rs. No. Account In Lacs) 1. Improvement of road by providing four lanning of 5054 R&B 869.85 Ladwa Shahbad road (SH-07) from Km. 43.10 to 45.50 (2.40 Km.) in Babain town (ID 8078) in Distt. Kurukshetra 2. Widening with hard shouldering and strengthening of 3054 R&B 76.00 Saharanpur Kurukshetra road to Girdharpur (ID 7960) 3. Widening with hard shouldering and strengthening of 3054 R&B 36.28 Mahuwa Kheri to Sanghaur (ID 7933) 4. Construction of side drain on Shahbad Ladwa road to 3054 R&B 19.18 Akalgarh- Babain via Sunaria (ID 7918) in village Mangoli Rangran at RD 77800 to 8300 in RHS 5. Widening with hard shouldering and strengthening of 3054 R&B 13.66 Ladwa Raipur road to Jainpur (ID 7907) 6. Construction of side drain on Loahra to Girdharpur RD 3054 R&B 16.40 0 to 500 mtr. LHS Total 1031.37

(ii) BUILDING WORKS

Sr. Name of work Head of Amount (Rs. No. Account In Lacs) 1. Up-gradation of PHC to CHC at Babain 4210-Capital 950.62 Outlay 2. Construction of Govt. I.T.I. at village Bahlolpur 4250-Capital 865.78 Outlay 3. Special repair / renovation of Bus Stand at Ladwa 2059 Public 20.10 Works 4. Construction of Sports Stadium in village Dhanoura 2204-Sports & 236.68 Jattan in Distt. Kurukshetra Youth Services Total 2073.18 (I) 7 Nos. roads works with estimated cost of Rs. 536.22 Lacs and 2 No. Building works with an estimated cost of Rs. 816.58 lacs in pipe line. (i) Road Works Sr. Name of work Head of Amount (Rs. Remarks No. Account In lacs) 1 Maintenance of road for periodical repair of Karnal- 3054 R&B 353.53 Tender under Ramba-Indri-Ladwa road (SH-07) from Km. 27.80 allotment. to 41.00 (Road ID 7890) 2 Widening and strengthening of Gadli to Saleempur 3054 R&B 106.49 Tender under (Road ID 7989) in allotment. 3 Providing 20mm thich PC on Link Road to 3054 R&B 11.30 Tender under Phalsanda Jattan in Kurukshetra District( ID 7925) allotment. 4 Providing 20mm thich PC on Link Road to 3054 R&B 7.00 Tender under Phalsanda Rangran in Kurukshetra District ( ID allotment. 7926) 5 Providing 20mm thich PC on Mehra to Kheri 3054 R&B 11.40 Tender under Dablan in Kurukshetra District( ID 9381) allotment. 6 Providing 20mm thich PC on Sanghore Road to 3054 R&B 2.30 Tender under Ramsaran Majra in Kurukshetra District( ID 7924) allotment. 7 Providing 20mm thich PC on Shahabad Ladwa road 3054 R&B 44.20 Tender under to Kalwa to Birthala in Kurukshetra District( ID allotment. 7914) Total 536.22

(ii) BUILDING WORK

Sr. Name of work Head of Amount Remarks No. Account (Rs. In lacs) Status of DNIT/ Tenders 1. Construction of PHC Brot in District Kurukshetra 4210 CO 360.00 Tender under (C.M. announcement Code No. 24169 dated on Medical allotment 30.10.2018) with an estimated cost of Rs. 360.00 Lacs (Under Head 4210 CO on Medical). 2. Construction of Veterinary Polyclinic at village Beholi 2403 – 456.58 Detailed in District Kurukshetra (C.M. announcement Code No. Animal estimate under 10189 dated 04.06.2015) with an estimated cost of Rs. Husbandry preparation 456.58 Lacs Total 816.58

(J) For entire Haryana State, year wise expenditure incurred on various activities are as under:-

(a) Roads

Sr. Item 2011- 2012- 2013- 2014- 2015- 2016- 2017- 2018- 2019- Total No. 12 13 14 15 16 17 18 19 20

Upto 01/2020

1 Construction of 26.00 80.00 131.00 58.00 39.00 49.00 68.00 219.04 328.29 998.33 new roads 2 Widening/Stg./ 1543.00 1827.00 2366.00 2085.00 2481.00 2217.00 2201.00 3343.82 1954.10 20017.92 Raising, Cement Concrete/Block pavement, Annual surfacing/ Premix carpet of roads & Annual Mtc. of roads. Total 1569 1907 2497 2143 2520 2266 2269.00 3562.86 2282.39 21016.25

(Rs. in crore)

(b) Buildings

Year 2011- 2012- 2013- 2014- 2015- 2016- 2017- 2018-19 2019-20 Total 12 13 14 15 16 17 18 (1/2020)

Expenditure 489.32 556.84 594.28 485.90 749.77 689.60 1126.72 1619.74 1474.33 7786.5

ckbZ&ikl dk fuekZ.k

*44 Jh esok flag] ,e0 ,y0 ,0 % D;k mi&eq[;ea=h Ñi;k crk,axs fd D;k ykMok “kgj ds fy, fdlh ckbZ&ikl ds fuekZ.k dk dksbZ izLrko ljdkj ds fopkjk/khu gS; ;fn gka] rks bldk C;kSjk D;k gS rFkk blds dc rd fufeZr fd, tkus dh lEHkkouk gS \

------

nq’;ar pkSVkyk] mi&eq[;ea=h] gfj;k.kk ugha] Jheku thA

Jh esok flag] fo/kk;d] ykMok fuokZpu {ks= }kjk iwNk x;k Rkkjkafdr fo/kkulHkk iz”u la[;k *44

iSM uksV

ykMok “kgj dks nks jkT; mPp ekxZ] lgkjuiqj&dq:{k=s lM+d ¼jkT; mPp ekxZ&06½ rFkk djuky&jkEck& bUnzh&ykMok&”kkgckn lM+d ¼jkT; mPp ekxZ&07½ ikj djrs gSaA lgkjuiqj&dq:{ks= lM+d ¼jkT; mPp ekxZ&06½ ykMok “kgj esa 3-95 fd-eh- yEckbZ esa ¼fd- eh- 59-35 ls fd-eh- 63-20 rd½ igys gh pkjekxhZ; gSA djuky&jkEck& bUnzh&ykMok&”kkgckn lM+d ¼jkT; mPp ekxZ&07½ dks djuky@dq:{ks= lhek ls ykMok rd 5-20 fd-eh- ¼fd-eh- 27-800 ls fd-eh- 32-820 rd½ yEckbZ esa pkjekxhZ; djus dh vko”;drk gS] D;ksafd djuky@dq:{ks= ftyk lhek rd jk’Vªh; jktekxZ&44] cyMh eksM+] djuky lM+d dks pkjekxhZ; fd;k tk jgk gSA ykMok “kgj ds fy, ckbZikl ds fuekZ.k dks dksbZ izLrko ugha gSA gkykafd] foLr`r ifj;kstuk fjiksVZ ds ifj.kkeLo:Ik lM+d ifjogu ,oa jktekxZ ea=ky;] Hkkjr ljdkj }kjk ifV;kyk&isgok&dq:{ks=&ykMok&;equk uxj lM+d dks lS/kkfUrd :Ik ls jk’Vªh; jktekxZ ?kksf’kr fd;k x;k FkkA foLr`r ifj;kstuk fjiksVZ rS;kj djus dk dk;Z lM+d ifjogu ,oa jktekxZ ea=ky;] Hkkjr ljdkj u s bafM;u ,dsMeh vkWQ gkbo s bathfu;lZ ¼vkbZ-,-,p-bZ-½] uks,Mk dks lkSaik FkkA ckn esa bl foLr`r ifj;kstuk fjiksVZ dks rS;kj djus dk dk;Z lM+d ifjogu ,oa jktekxZ e=a ky;] Hkkjr ljdkj }kjk vkbZ-,-,p-bZ- yksd fuekZ.k foHkkx] ita kc rFkk lykgdkj ds chp ,d f=i{kh; le>kSrs ds vuq:Ik yksd fuekZ.k foHkkx] iatkc dks lkSai fn;k x;k FkkA lykgdkj }kjk O;ogkfjd v/;;u rS;kj fd;k x;k Fkk rFkk bl O;ogkfjd v/;;u esa ykMok ckbZikl 8-90 fd-eh- yEckbZ esa ykMok “kgj ds mRrj fn”kk esa izLrkfor fd;k x;k FkkA ijUrq lM+d ifjogu ,oa jktekxZ ea=ky; }kjk lHkh lS/kkfUrd foLr`r ifj;kstuk fjiksZVksa dks jksd fn;k x;k] blfy, foLr`r ifj;kstuk rS;kj djus dk dk;Z vkxs ugha c<+ ldkA mijksDr dks e/;utj j[krs gq,] ykMok “kgj ds fy, ckbZikl ds fuekZ.k dk dksbZ izLrko ugha gSA

¼d½ ykMok fuokZpu {ks= esa lM+dka s dh dqy yEckbZ fuEu izdkj ls gS%&

i) jk’Vªh; mPp ekxZ “kwU; ii) jkT; mPp ekxZ 48-35 fd- eh- iii) eq[; ftyk lM+dsa “kwU; iv) vU; ftyk lM+dsa 287-98 fd-eh- dqy% 336-33 fd0eh0

¼[k½ ykMok fuokZpu {ks= esa lM+dk s dh fLFkfr fuEu izdkj gS%&

i) lM+d yEckbZ cgqr vPNh fLFkfr esa 106-46 fd-eh- ii) lM+d yEckbZ vPNh fLFkfr esa 65-85 fd-eh- iii) lM+d yEckbZ cqjh fLFkfr esa 34-54 fd-eh- iv) lM+d yEckb izxfr esa 34-54 fd-eh

dqy% 241-39 fd-eh-

¼x½ iSp dk;Z@xM+

i) xM~

ii) lQsZl MªSflax “kwU;

¼?k½ ykMok fuokZpu {ks= esa o’kZ 1-11-2014 ls 31-01- 2020 rd fufeZr@ ejEer dh xbZ lM+d dh yEckbZ%&

Ø0 fooj.k 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 dqy la 0 (31.01.20 20 rd)

1 ubZ lM+d dk ------2.45 ------2.45 fuekZ.k

2 pkSM+hdj.k@ 17.25 50.73 38.28 13.83 --- 4.50 124.59 etcwrhdj.k@ Åapk mBkuk

3 lM+dksa dk 0.65 1.49 17.93 24.99 20.04 8.08 73.18 lq/kkj

dqy 17.90 52.22 56.21 41.27 20.04 12.58 200.22

¼M+½ ykMok fuokZpu {ks= esa 1 uoEcj 2014 ls 31-01-2020 rd fofHkUu lM+d xfrfof/k;ksa ij fd;s x;s o"kZokj O;; dk fooj.k fuEu izdkj gS%&

Ø0 fooj.k 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 dqy la0 (31.01.2 020 rd) 1 ubZ lM+d dk fuekZ.k 0 0 38.98 62.15 0 0 101.13 2 pkSM+hdj.k@ 436.27 1414.81 1255.25 1316.17 1008.37 527.67 5958.54 etcwrhdj.k@Åpa k mBkuk 3 lhesaV daØhV 0 0 158.50 00 00 00 158.50 CykWd@QqVikFk 4 Okkf’kZd lM+dksa dh 0 201.14 00 169.08 00 00 370.22 lQsZflax@ih-lh- 5 lM+dksa dk okf’kZd 33.79 82.74 48.84 44.28 33.17 131.91 374.73 j[k&j[kko dqy 470.06 1698.69 1501.57 1591.68 1041.54 659.58 6963.12 ¼[kpkZ :Ik;s yk[kksa esa½ ¼p½ ykMok fuokZpu {ks= esa 1 tuojh 2014 ls 31-01-2020 rd Hkou dk;k sZa ij fd;s x;s o"kZokj O;; dk fooj.k fuEukuqlkj gS%& ¼[kpkZ :Ik;s yk[kksa esa ½

2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 dqy. (31.01.2020 rd)

5.18 4.75 4.03 68.57 141.33 409.02 632.88

¼N½ 101-34 djksM+ #i;s dh vuqekfur ykxr ls 87 lM+d dk;Z vkSj 1-52 djksM+ #i;s dh vuqekfur ykxr ls 6 Hkou dk;Z iw.kZ fd, x, gSA

(i) lM+d dk;Z 1- 689-28 yk[k :Ik;s dh jkf”k ls fd-eh- 0-00 ls fd-eh- 12-40 yEckbZ rd th-Vh- jksM+ ls vdkyx<+ ok;k ccSu la?kksj ¼vkbZ Mh 7948½ lM+d dk etcwrhdj.kA ¼”kh’kZ 3054½ 2- 624-32 yk[k :Ik;s dh jkf”k ls fd-eh- 0-00 ls fd-eh- 6-79 rd ykMok fgukSjh lM+d ¼vkarfjd ftyk lM+d½ dk mUu;uA ¼iz/kkuea=h xzke lM+d ;kstuk&II½ 3- 574-08 yk[k :Ik;s dh jkf”k ls fd-eh- 0-00 ls fd-eh- 9-00 rd ;kjk ls cqgkok&cqgkoh& y[kejh&chM+ eaxkSyh lM+d dk mUu;uA ¼iz/kkuea=h xzke lM+d ;kstuk&II½ 4- 639-60 yk[k :Ik; s dh jkf”k ls fd-eh- 12-40 ls fd-eh- 22-90 rd ccSu ls vdkyx< ok;k la?kkSj jkT; lhek rd lM+d dk mUu;uA ¼iz/kkuea=h xzke lM+d ;kstuk&II½ 5- 10-30 yk[k :Ik;s dh jkf”k ls 0-68 fd-eh- yEch ykMok fguksjh lM+d ls cqn~/kk ¼vkbZ Mh 7893½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 6- 5-21 yk[k :Ik;s dh jkf”k ls 0-12 fd-eh- yEch ykMok fguksjh lM+d ls cnjiqj ¼vkbZ Mh 7896½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 7- 2-60 yk[k :Ik;s dh jkf”k ls 0-12 fd-eh- yEch ykMok fguksjh lM+d ls ykBh /kUukSjk ¼vkbZ Mh 7898½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 8- 5-84 yk[k :Ik; s dh jkf”k ls 0-27 fd-eh- yEch ykMok jk;iqj lM+d ls tSuiqj ¼vkbZ Mh 7907½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 9- 5-21 yk[k :Ik;s dh jkf”k ls ykMok fguksjh lM+d ls Hkkjrh; [kkn~; fuxe xksnke ds lkeus vukt e.Mh ykMok rd lM+d dh ejEerA ¼”kh’kZ 3054½A 10- 19-85 yk[k :Ik;s dh jkf”k ls 1-08 fd-eh- yEch fguksjh lM+d ls lgkjuiqj&dq:{ks= lM+d rd ok;k flusek pkSd ¼yky lM+d½ ¼vkbZ Mh 7910½ lM+d dh ejEerA ¼”kh’kZ 3054½A 11- 10-20 yk[k :Ik;s dh jkf”k ls 0-93 fd-eh- yEch flEcyoky ls Qkyl.Mk tV~Vka ¼vkbZ Mh 7919½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 12- 9-82 yk[k :Ik;s dh jkf”k ls 0-75 fd-eh- yEch eaxkSyk ;kstd ¼vkbZ Mh 7927½ lM+d dh ejEerA ¼”kh’kZ 3054½A 13- 4-58 yk[k :Ik;s dh jkf”k ls 0-65 fd-eh- yEch “kkgckn&ykMok lM+d ls xqgu ¼vkbZ Mh 7928½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 14- 4-24 yk[k :Ik; s dh jkf”k ls 0-60 fd-eh- yEch “kkgckn&ykMok lM+d ls chM+ lqtjk ¼vkbZ Mh 7934½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 15- 11-51 yk[k :Ik;s dh jkf”k ls 1-20 fd-eh- yEch “kkgckn&ykMok lM+d ls /kUukSjk ¼vkbZ Mh 7935½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 16- 9-17 yk[k :Ik; s dh jkf”k ls 0-50 fd-eh- yEch bUnzh pkSd ls “kkgckn&ykMok lM+d ok;k yksd fuekZ.k foJke x`g ¼vkbZ Mh 7946½ rd lM+d dh ejEerA ¼”kh’kZ 3054½A 17- 5-27 yk[k :Ik;s dh jkf”k ls 0-75 fd-eh- yEch ykMok&eqLrQkckn lM+d ls xqM~

¼ii½ Hkou dk;Z 1- 11-08 yk[k #i;s dh jkf”k ls ykMok esa foJke x`g Hkou dh fo”ks’k ejEerA ¼”kh’kZ 2059½A 2- 25-93 yk[k #i; s dh jkf”k ls ftyk dq:{ks= esa jktdh; vkS|ksfxd izf”k{k.k laLFkku] mejh dh fo”ks’k ejEerA ¼”kh’kZ 4250½A 3- 14-20 yk[k #i;s dh jkf”k ls xkao eFkkuk ds lkeqnkf;d LokLF; dsUnz esa lQsnh o jax&jksxu djukA ¼”kh’kZ 2059½A 4- 35-83 yk[k #i;s dh jkf”k ls ftyk dq:{ks= ds xkao lqukfj;k esa Ik”kq fpfdRlky; dk fuekZ.kA ¼”kh"kZ ukckMZ½A 5- 32-58 yk[k #i;s dh jkf”k ls ftyk dq:{ks= ds xkao gfjiqj esa Ik”kq fpfdRlky; dk fuekZ.kA ¼”kh"kZ ukckMZ½A 6- 32-58 yk[k #i;s dh jkf”k ls ftyk dq:{ks= ds xkao ;kjk esa Ik”kq fpfdRlky; dk fuekZ.kA ¼”kh"kZ ukckMZ½A

¼t½ 1031-37 yk[k #i;s dh jkf”k ls 6 lM+d dk;Z] rFkk 2073-18 yk[k #i;s dh jkf”k ls 4 Hkou dk;Z izxfr ij gSA ¼i½ lM+d dk;Z

1- 869-85 yk[k #i;s dh jkf”k ls ccSu dLcs esa ykMok&”kkgckn lM+d ¼jkT; mPp ekxZ&7½ ¼vkbZ Mh 8078½ fd-eh- 43-10 ls fd-eh- 45-50 rd ¼2-40 fd-eh-½ dk lq/kkjA ¼”kh’kZ 5054½A 2- 76-00 yk[k #i;s dh jkf”k ls lgkjuiqj&dq:{ks= lM+d ls fxj/kjiqj lM+d ¼vkbZ Mh 7960½ dk pkSM+k o etcwr djukA ¼”kh’kZ 3054½A 3- 36-28 yk[k #i;s dh jkf”k ls egqvk[ksM+h ls la?kkSM+ lM+d ¼vkbZ Mh 7933½ dk s pkSM+k o etcwr djukA ¼”kh’kZ 3054½A 4- 19-18 yk[k #i;s dh jkf”k ls xkao eaxkSyh jkaxM+ka esa “kkgckn&ykMok lM+d ls vdkyx<+&ccSu ok;k lqukfj;k lM+d ¼vkbZ Mh 7918½ ds nkbZa vksj ukys dk fuekZ.kA ¼”kh’kZ 3054½A 5- 13-66 yk[k #i;s dh jkf”k ls ykMok&jk;iqj lM+d ls tSuiqj lM+d ¼vkbZ Mh 7907½ dks pkSM+k o etcwr djukA ¼”kh’kZ 3054½A 6- 16-40 yk[k #i;s dh jkf”k ls yksgjk ls fxj/kjiqj lM+d ds nkbZa vksj ukys dk fuekZ.kA ¼”kh’kZ 3054½A

¼ii½ Hkou dk;Z

1- 950-62 yk[k #i;s dh jkf”k ls ccSu esa izkFkfed LokLF; dsUnz ls lkeqnkf;d LokLF; dsUnz esa mUu;u djukA ¼”kh’kZ 4210½A 2- 865-78 yk[k #i;s dh jkf”k ls xkao cgyksyiqj esa jktdh; vkS|ksfxd izf”k{k.k laLFkku dk fuekZ.kA ¼”kh’kZ 4250½A 3- 20-10 yk[k #i; s dh jkf”k ls ykMok esa cl vM~Ms dh fo”ks’k [email protected] ¼”kh’kZ 2059½A 4- 236-68 yk[k #i;s dh jkf”k ls xkao /kUukSjk tV~Vka esa [ksy LVsfM;e dk fuekZ.kA ¼”kh’kZ 2204½A

¼>½ 536-22 yk[k #0 dh jkf”k ls 7 lM+d dk;Z rFkk 816-58 yk[k #0 dh jkf”k ls 2 Hkou dk;Z ikbi ykbZu esa gSA

¼i½ lM+d dk;Z

1. 353-53 yk[k #i;s dh jkf”k ls djuky&jEck&bUnzh&ykMok lM+d ¼jkT; jktekxZ&07½ ¼vkbZ Mh 7890½ fd-eh- 27-80 ls fd-eh- 41-00 rd lM+d dk lkef;d j[k&j[kkoA ¼”kh’kZ 3054½A 2 106-49 yk[k #i;s dh jkf”k ls xknyh ls lyheiqj ¼vkbZ Mh 7989½ lM+d dks pkSM+k o etcwr djukA ¼”kh’kZ 3054½A 3 11-30 yk[k #i;s dh jkf”k ls QkylaMk tV~Vka dh ;kstd lM+d ¼vkbZ Mh 7925½ ij 20 fe-eh- izhfeDl dkjisV djuk A ¼”kh’kZ 3054½A

4 7-00 yk[k #i;s dh jkf”k ls QkylaMk jkaxM+ka;kstd lM+d ¼vkbZ Mh 7926½ ij 20 fe-eh- izhfeDl dkjisV djuk ¼”kh’kZ 3054½A

5 11-40 yk[k #i;s dh jkf”k ls egjk ls [ksM+h ncyku ij ¼vkbZ Mh 9381½ ij 20 fe-eh- izhfeDl dkjisV djuk ¼”kh’kZ 3054½A

6 2-30 yk[k #i;s dh jkf”k ls la?kkSjk ls jkelj.k ektjk lM+d ¼vkbZ Mh 7924½ ij 20 fe-eh- izhfeDl dkjisV djuk ¼”kh’kZ 3054½A

7 44-20 yk[k #i;s dh jkf”k ls “kkgckn&ykMok lM+d ls dkyok ls fcjFkyk ¼vkbZ Mh 7914½ ij 20 fe-eh- izhfeDl dkjisV djuk ¼”kh’kZ 3054½A

¼ii½ Hkou dk;Z

1 eq[;ea=h ?kks’k.kk la[;k 24169 fnukad 30-10-2018 ds varxZr 360-00 yk[k #i;s dh jkf”k ls xkao cjkWV esa izkFkfed LokLF; dsUnz dk fuekZ.kA ¼”kh’kZ 4210½A 2 eq[;ea=h ?kks’k.kk la[;k 10189 fnukad 04-06-2015 ds varxZr 456-58 yk[k #i;s dh jkf”k ls xkao csgksyh esa Ik”kq fpfdRlkY; ikWfyfDyfud dk fuekZ.kA ¼”kh’kZ 2403½A

¼¥½ iwjs gfj;k.kk jkT; esa fofHkUu xfrfof/k;ksa ij fd;s x, o"kZokj [kpsZ dk fooj.k fuEu gS%& lM+dsa Ø0 fooj.k 2011-12 2012- 2013- 2014- 2015- 2016 2017- 2018 2019- dqy l0 13 14 15 16 -17 18 -19 20 01/20 20 1 ubZ lM+dksa 26.00 80.00 131.0 58.00 39.00 49.00 68.00 219. 328.2 998.33 dk fuekZ.k 0 04 9 2 pkSM+k @ 1543.00 1827.0 2366. 2085. 2481.0 2217. 2201. 3343 1954. 20017.9 lqn`<+hdj. 0 00 00 0 00 00 .82 10 2 k@mapk mBkuk@ lheaVs daØhV@ CykWd isoesaV] Okkf"kZd lM+dksa dh ljQsaflax @ ihlh vkSj lM+dksa dk okf"kZd j[kj[kko dqy 1569 1907 2497 2143 2520 2266 2269. 3562 2282. 21016.2 00 .86 39 5 [kpkZ :i;s djksM+ esaa½ Hkou

Ok"kZ 2011- 2012- 2013- 2014- 2015- 2016- 2017-18 2018-19 2019-20 dqy. 12 13 14 15 16 17 (1/2020) [kpkZ 489.32 556.84 594.28 485.90 749.77 689.60 1126.72 1619.74 1474.33 7786.5 [kpkZ :i;s djksM+ esaa½