724533L-NS-Fayette-Waveland Museum Lane

724533L-NS-Fayette-Waveland Museum Lane

FY 2021 Kentucky Rail Crossing Improvement Projects TABLE OF CONTENTS PROJECT DESCRIPTION, SCOPE OF WORK, PROJECT TIMELINE ........................................... 2 PROJECT TIMELINE GANT CHART .................................................................................................... 3 KRCI RAILROAD CROSSING IMPROVEMENT APPLICATION .................................................... 4 EXHIBIT A – DETAILED MAP ................................................................................................................ 8 EXHIBIT B – AERIAL VIEW OF EXISTING CONDITIONS .............................................................. 9 EXHIBIT C – CONCEPT OVERVIEW FOR IMPROVEMENTS .......................................................10 EXHIBIT D – ONSITE OBSERVATION REPORT ...............................................................................11 EXHIBIT E – DETAILED CONSTRUCTION ESTIMATE ..................................................................17 EXHIBIT F – INVENTORY REPORT .....................................................................................................18 EXHIBIT G – INCIDENT REPORTS ......................................................................................................20 EXHIBIT H – ROAD AUTHORITY CONSULTATION LETTER ......................................................22 KYTC Section 130 Railway-Highway Grade Crossing Program Date Created: 04/28/2021 FY 2021 Kentucky Rail Crossing Improvement Projects PROJECT DESCRIPTION Norfolk Southern Railway Company is looking to identify potential at-grade crossings and propose adding counter measures to reduce crossing hazards in the vicinity of the crossing. Crossing DOT# 724533L, Milepost 86.71 CNO&TP, located in Lexington, KY is a potential crossing Norfolk Southern would like to consider for improvements by installing new raised curb delineators to help channelize vehicles. Other proposed improvements include re-striping of roadway edge and stop bars for better visibility of upcoming crossing and potentially adding signs and advanced warning markings. Expected outcome of project would be to create a safer highway-rail crossing to reduce the potential for incidents in the crossing vicinity. PROJECT SCOPE OF WORK The proposed project includes installation of raised curb medians with delineators and new striping. The raised curb medians with delineators will help channelize vehicles that are queued at the railroad crossing and deter drivers from driving around crossing arm when the signal is activated. The proposed project is to reduce risk of an incident in the vicinity of the crossing. For more information, please refer to the concept plan showing improvements in Exhibit C and the detailed project estimate in Exhibit E. PROJECT SCHEDULE/TIMELINE When authorization to proceed is received, Norfolk Southern (NS) will immediately begin, coordinating with the local road authority. Complete detailed design drawings for construction at the two (2) month mark. Norfolk Southern to bid project. Contractors' bid to include a detailed time schedule for material procurement and installation. NS will receive bids at the three (3) month mark. NS will evaluate bids and award project, as necessary, at the four (4) month mark. Contractor to start procurement and installation in accordance with their detailed time schedule. Upon completion of project by contractor, NS will inspect the finished product within a week. If all criteria are met, NS will send out a project closeout report and final billing notice. For more information, please refer to the Project Schedule/Timeline Gant Chart. Cr ea KYTC Project Timeline, DOT# 724533L EnterNorfolk Company Southern Name in cell Railway B2. Company William R. Miller Mon, 8/2/2021 Enter the name of the Project Lead in cell B3. Enter the Project Start date in cell E3. Project Start: label is in cell C3. Project Start: Th 1 August October November December January February March April e Display Week: Th ASSIGNED TASK PROGRESS START END is TO Ce ll Project Granted - Authorization to Proceed Ce ll B9 Norfolk Southern Railway Company begin coordination with local road authority Norfolk Southern Railway Company 8/2/21 8/16/21 co R o Norfolk Southern Railway Company to Bid Project and Evaluate Bids Norfolk Southern Railway Company 8/16/21 11/1/21 Th e Project Bid Awarded Norfolk Southern Railway Company will award project Norfolk Southern Railway Company 11/1/21 11/8/21 Contractor to start procurement and installation Contractor - TBD 11/8/21 2/7/22 Project Completion and Inspection Sample phase title block Upon completion of project by Contractor, Norfolk Southern Railway Company will Norfolk Southern Railway Company 2/7/22 2/14/22 inspect the finished product Norfolk Southern Railway Company will send out project closeout report and final Norfolk Southern Railway Company 2/14/22 2/28/22 billing notice This is an empty row Th is KYTC Section 130 Railway-Highway Grade Crossing Program Report No.: 1 Onsite Representative: Donald Gourley PRINT NAME PRELIMINARY ENGINEERING ON-SITE REPRESENTATIVE REPORT Railroad Line First Dist.-CNO&TP Date of Report: 4/2/2021 Milepost: 86.71 CNO&TP Date of Visit: 4/2/2021 Railroad File No.: NA Weather: SUNNY Location: Lexington Ky Temperature: High: 45 Low: 25 Route No.: Waveland Museum Ln. Project Sponsor: NA Railroad Division: Midwest STV Project No: 4019903-2464 SAFETY OF OPERATIONS STV Onsite Check in Log: Railway Contact: Date: How Contacted: Time: Is Flagman Needed? Present? Name: Flagman from: B&B T&E M of W PROJECT DESCRIPTION Preform a Site-Specific survey and report findings to NS KYTC Grade Crossing Hazard Elimination Program TRACK INFORMATION No. of Tracks: One (1) Additional Track Info: Track Type: Main Line Direction: East to West Alignment: Tangent Profile (Grade): NK Superelevation: NK Right of Way: NK Rail Type: 136 RE CWR Crossing Length: 20 Crossing Type: Asphalt SIGNALS/COMMUNICATIONS Do any Railway Signals or Communication lines need to be removed or relocated? Do any Railway Signals or Communication lines need to be protected? Additional Signal/Communication Info: DRAINAGE Is Current Drainage adequate? Is proposed site Drainage Adequate? Is proposed Structure Drainage Adequate? Additional Drainage Info: Sheet #1 Report No.: 1 Onsite Representative: Donald Gourley PRELIMINARY ENGINEERING ON-SITE REPRESENTATIVE REPORT Railroad/Line First Dist.-CNO&TP Date of Report: 4/2/2021 Milepost: 86.71 CNO&TP Date of Visit: 4/2/2021 Railroad File No.: NA Weather: SUNNY Location: Lexington Ky Temperature: High: 45 Low: 25 Route No.: Waveland Museum Ln. Project Sponsor: NA Railroad Division: Midwest STV Project No: 4019903-2464 Site Access and Crossings Will a Temporary Construction Crossing be Required? Will Existing or Future Railway Access be Impacted by the Project? Can any Nearby Crossings be Closed in Conjunction with this Project? Additional Site Access and Crossing Info.: Asphalt Roadway… Fair Condition Speed Limit... 25 MPH... Crossing is 6'-7' elevated ...Track Access Road Running South to North on the West side of the Track. Proposed Structure Data Existing Vertical Clearance: Are Crash Walls Required? Proposed Vertical Clearance: Are Crash Walls Provided? Existing Horizontal Clearance: Do They Conform to AREMA? Proposed Horizontal Clearance: Will Sheeting/Shoring be Required? Dist. from CL Track: Will Demolition Shields be Required? Temporary Clearance Reduction? Are there Existing Sidewalks? Any Existing Pedestrian Issues? Any Existing Vandalism Issues? Additional Structure Information: Additional Information/Issues Noted Very Heavy Traffic using crossing. See Google Maps very larger Residential Development in the N/W Quadrant. Current Project Status Sheet #2 Report No.: 1 PRELIMINARY ENGINEERING ON-SITE REPRESENTATIVE REPORT Time Log ITEM DESCRIPTION QTY / HRS On-Site Representative: Donald Gourley On Site 9:00 - 12:00 Site Observation 3 PRINT NAME Travel Time Home - Lexington Ky RT 3 STV Project No.: 4019903-2464 Other (Describe) Report, Photo's, Etc 2 Total Hours Charged 8 PHOTOGRAPHS Photograph No.: 1 Date: 4/2/2021 Direction of View: NORTH Description Tangent Track Alignment, Note: Access Road on the Left Photograph No.: 2 Date: 4/2/2021 Direction of View: SOUTH Description Tangent Track Alignment Note: Access Road on the Right. With overhead Utility's On Site Representative: Donald Gourley PRINT NAME Sheet #3 Report No.: 1 PRELIMINARY ENGINEERING ON-SITE REPRESENTATIVE REPORT Railroad Line First Dist.-CNO&TP Date: 4/2/2021 Milepost: 86.71 CNO&TP Sponsor Contact: NA Railroad File No.: NA Contacted via: NA Location: Lexington Ky Time Contacted: NA Route No.: Waveland Museum Ln. Weather: SUNNY Railroad Division: Midwest Temperature: Hi: 45 Lo: 25 PHOTOGRAPHS Photograph No.: 3 Date: 4/2/2021 Direction of View: WEST Description No Existing Pedestrian or Bike Paths. Note: The Height of the Crossing. Photograph No.: 4 Date: 4/2/2021 Direction of View: EAST Description Looking at the Crossing with Overhead Utility on the Right. On Site Representative: Donald Gourley PRINT NAME Sheet #3 Report No.: 1 PRELIMINARY ENGINEERING ON-SITE REPRESENTATIVE REPORT Railroad Line First Dist.-CNO&TP Date: 4/2/2021 Milepost: 86.71 CNO&TP Sponsor Contact: NA Railroad File No.: NA Contacted via: NA Location: Lexington Ky Time Contacted: NA Route No.: Waveland Museum Ln. Weather: SUNNY Railroad Division: Midwest Temperature: Hi: 45 Lo: 25 PHOTOGRAPHS Photograph No.: 7 Date: 4/2/2021 Direction of View: N/W Description Looking at the Signal, Mast on the left of the

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us