“Runwal Eden” Redevelopment Project

“Runwal Eden” Redevelopment Project

30.11.2018 \ FORM – 1 & 1A “RUNWAL EDEN” REDEVELOPMENT PROJECT At P lot bearing C.S number: 233 at Malabar-Cumballa Hill division known as 91 Neapean sea road, Mumbai By M/s. Runwal Township Pvt. Ltd Runwal Township Pvt. Ltd. 5th Floor, Runwal Omkar E-square, Sion (East) Mumbai - 400022 FORM – 1 “RUNWAL EDEN” REDEVELOPMENT PROJECT At Plot bearing C.S number: 233 at Malabar-Cumballa Hill division known as 91 Neapean sea road, Mumbai By M/s. Runwal Township Pvt. Ltd th Runwal Township Pvt. Ltd. 5 Floor, Runwal Omkar E-square, Sion (East) Mumbai - 400022 APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr. Item Details No. 1. Name of the project/s ‘Runwal Eden’ Redevelopment project at Malabar- Cumballa Hill division known as 91 Neapean sea road, Mumbai 2. S. No. in the schedule 8 (a) 3. Proposed capacity/ area/ length/ Total Plot Area: 2,048.96 Sq.mt. tonnage to be handled/ command Built-up Area as per FSI: 10,214.49 Sq. mt. area/ lease area/ number of wells to Total Construction Built -up Area: 31,671.27 Sq. mt. be drilled Project Proposal: Building details Flats 1 Residential Building 2 Basements + Ground floor on MHADA: 12 Nos. stilt, partly for car parking and Redevelopment: 13 partly for entrance lobby + 1st to 8th Nos. Podium levels for car parking + 9th Sale: 27 Nos. service floor + 10th Amenity floor + Total : 52 Nos. 11th to 36th (pt) residential floors. 4. New/Expansion/Modernization Amendment in Environment Clearance 5. Existing Capacity/ Area etc. Received Environmental Clearance File No. SEAC- 2016/C.R.424/TC-1 dated 12.05.2017 Total constructed work on site till date (FSI + Non FSI): 28,561.56 Sq. mt. 6. Category of project i.e.’ A’ or 8(a)B2 ‘B’ 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location 91 Neapean sea road Plot/Survey/Khasra No. C.S. No 233 Village Malabar-Cumballa Hill division Tehsil Mumbai District Mumbai State Maharashtra 10. Nearest railway station Churni road railway station: Within 3.50 Km(Road Distance) Nearest airport Mumbai Chhatrapati Shivaji Airport: Within 21.0 Km (Road Distance) 11. Nearest Town, city, District Mumbai Metropolitan Region headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation of Greater Mumbai (M.C.G.M.) Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Runwal Township Pvt. Ltd. 14. Registered Address Runwal Township Pvt. Ltd. 5th Floor, Runwal Omkar E-square, Sion Chunnabhati signal Form 1- Redevelopment project, Malabar-Cumballa Hill 1 Sr. Item Details No. junction, Sion – East, Mumbai - 400022 15. Address for correspondence 5th Floor, Runwal Omkar E-square, Sion Chunnabhati signal junction, Sion – East, Mumbai - 400022 Name Ms. Pallavi Matkari Designation(Owner/Partner/ CEO) Chief Architect Address 5th Floor, Runwal Omkar E-square, Sion Chunnabhati signal junction, Sion – East, Mumbai Pin Code 400022 E-mail [email protected] Telephone No. 61133000 Fax No. 24093799 16. Details of Alternative Sites Not applicable examined, if any. Location of these sites should be shown on a topo- sheet. 17. Interlinked Projects Not applicable 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, Not Applicable 1980? (b) The Wildlife (Protection) Act, Not Applicable 1972? (c) The C.R.Z Notification, 1991? As per the DP remark, the plot under reference is located in C.R.Z II and landward side of existing Nepean Sea Road. Received clearance from MCZMA. NOC attached as Enclosure 4. 22. Whether there is any Government Received NOC from Mumbai Building Repairs and Order/Policy relevant/ relating to Reconstruction Board (A MHADA Unit) on 02.02.2016, the site? 20.05.2015, 08.04.2013, 01.09.2012. Copy attached as Enclosure 5. 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. Form 1- Redevelopment project, Malabar-Cumballa Hill 2 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities Sr. Information/Checklist Yes /rates, wherever possible) with source of No. confirmation / No information data 1.1 Permanent or temporary change No The site is in Residential zone as per DP in land use, land cover or remarks. topography including increase in DP Remarks is attached as Enclosure 6. intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No There was one existing cess structure (G + 2 vegetation and building? upper floors building) on site. This Existing structure has already been demolished. 1.3 Creation of new land uses? No - 1.4 Pre-construction investigation e.g. Yes Geotechnical Investigation has been carried out. bore houses, soil testing? Report is attached as Enclosure 7. 1.5 Construction works? Yes Residential development 1.6 Demolition works? No -- 1.7 Temporary sites used for No -- construction works or housing of construction workers? 1.8 Above ground building, structures Yes Excavation material has been partly used and or earthworks including linear partly disposed to Authorized landfill as per structures, cut and fill or permission from M.C.G.M. excavations Construction waste shall be partly used and remaining will be disposed to authorized landfill site as per permission from M.C.G.M. 1.9 Underground works including No Construction of two basements only mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store the materials? construction raw material. 1.15 Facilities for treatment or disposal Yes STP for treatment of sewage of solid waste or liquid effluents? Segregation of solid waste into non biodegradable and biodegradable garbage Treatment of biodegradable waste in Organic Waste Converter Non-biodegradable waste: To authorized recyclers Dried sludge from STP : As manure 1.16 Facilities for long term housing of No -- operational workers? 1.17 New road, rail, or sea traffic No -- during construction or operation? 1.18 New road, rail, air waterborne or No -- other transport infrastructure including new or altered routes and stations, ports, airports etc? Form 1- Redevelopment project, Malabar-Cumballa Hill 3 Details thereof (with approximate quantities Sr. Information/Checklist Yes /rates, wherever possible) with source of No. confirmation / No information data 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission No -- lines or pipelines? 1.21 Impoundment, damming, No -- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the Yes By considering the runoff prior to development land surface affecting drainage or and runoff after development there is some run-off? increment in runoff of storm water. Incremental Runoff = 0.03 m3/sec 1.25 Transport of personnel or Yes Transport of construction materials. materials for construction, Precautions taken to reduce the impact of the operation or decommissioning? vehicular movement by trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No Since this is a redevelopment project there will either temporarily or be influx of ~195 persons (only occupancy of permanently? Sale and MHADA tenants) 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No -- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. Information/checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / wherever possible) with source of information data No 2.1 Land especially No The land is in developed infrastructure area. undeveloped or agricultural land (ha) 2.2 Water (expected Yes During Operational Phase – source & competing For Workers : From M.C.G.M.: 12 KLD users) unit : KLD For Construction: From Water tankers: 10 - 20 KLD (Depending upon the activity) During Operational Phase – Fresh water from M.C.G.M.: 23 KLD (Domestic) Form 1- Redevelopment project, Malabar-Cumballa Hill 4 Sr. Information/checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / wherever possible) with source of information data No 2.3 Minerals (MT) No --- 2.4 Construction material Yes Quantity: As per requirement – stone, aggregates, Stone aggregates demand will be met from the clay/soil and / soil (expected generated after excavation and from open market source – MT) Sources: The material required for construction activities shall be procured from company’s authorized/ approved vendors only. The vendor’s performance will be monitored periodically.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us