Corporation of Loyalist Township Costing of 2019 Flood Related Damage to Municipal Infrastructure

Corporation of Loyalist Township Costing of 2019 Flood Related Damage to Municipal Infrastructure

Corporation of Loyalist Township Costing of 2019 Flood Related Damage to Municipal Infrastructure October 15, 2019 BT Eng Project 19-027 Corporation of Loyalist Township Costing of Flood Related Damage to Municipal Infrastructure October 15, 2019 Table of Contents 1.0 Introduction ................................................................................................................... 1 2.0 Location of Flood Damaged Infrastructure ...................................................................... 1 3.0 Background Information ................................................................................................. 9 4.0 Site Inspections and Recommendations .......................................................................... 9 4.1 Site 1 - Front Road ................................................................................................................ 9 4.1.1 Site Inspection .................................................................................................................. 9 4.1.2 Recommendations ......................................................................................................... 10 4.2 Site 2 - Second Concession Road ........................................................................................ 11 4.2.1 Site Inspection ................................................................................................................ 11 4.2.2 Recommendations ......................................................................................................... 13 4.3 Site 3 - Third Concession Road ........................................................................................... 13 4.3.1 Recommendations ......................................................................................................... 15 4.4 Site 4 – Sand Beach Conservation Area ............................................................................. 15 4.4.1 Recommendations ......................................................................................................... 16 4.5 Site 5 - South Shore Road ................................................................................................... 16 4.5.1 Recommendations ......................................................................................................... 18 4.6 Site 6 – Bath Centennial Park ............................................................................................. 18 4.7 Site 7 – Finkle Shore Park ................................................................................................... 20 4.8 Site 8 – Stella Bay Dock ...................................................................................................... 20 4.9 Site 9 – Bath Water Treatment Plant ................................................................................. 21 5.0 Preliminary Cost Estimate of Remediation Plan ..............................................................23 5.1 Site 1 - Front Road .............................................................................................................. 23 5.2 Site 2 - Second Concession Road ........................................................................................ 24 5.3 Site 3 - Third Concession Road ........................................................................................... 24 5.4 Site 4 - Sand Beach Conservation Area .............................................................................. 25 5.5 Site 5 - South Shore Road ................................................................................................... 25 5.6 Site 6 – Centennial Park ..................................................................................................... 26 5.7 Site 7 – Finkle Shore Park ................................................................................................... 26 5.8 Site 8 – Stella Bay Dock ...................................................................................................... 26 5.9 Site 9 – Bath Water Treatment Plant ................................................................................. 27 5.10 Total Cost Estimate of Remediation Plan ........................................................................... 28 6.0 Summary of Findings and Recommendations .................................................................29 i Corporation of Loyalist Township Costing of Flood Related Damage to Municipal Infrastructure October 15, 2019 List of Figures Figure 1: Loyalist Township .................................................................................................................. 1 Figure 2: Site 1 - Front Road (approximately 400 m of damage) ......................................................... 2 Figure 3: Site 2 - Second Concession Road (approximately 500 m of damage) ................................... 2 Figure 4: Site 3 - Third Concession Road (approximately 1 km in damage)......................................... 3 Figure 5: Site 4 – South Beach Conservation Area (approximately 1.3 km in damage) ...................... 3 Figure 6: Site 5 – Limits of South Shore Road Erosion (approximately 500 m of damage) ................. 4 Figure 7: Site 6 - Bath Centennial Park ................................................................................................. 5 Figure 8: Site 7 – Finkle Shore Park Culvert ......................................................................................... 6 Figure 9: Site 8 - Stella Bay Dock .......................................................................................................... 7 Figure 10: Site 9 – Bath Water Treatment Plant .................................................................................. 8 Figure 11: Sample of Rock Protection Key ......................................................................................... 29 List of Tables Table 1: Site 1 - Front Road ................................................................................................................ 10 Table 2: Site 2 - Second Concession Road .......................................................................................... 12 Table 3: Site 3 - Third Concession Road ............................................................................................. 14 Table 4: Site 4 – Sand Beach Conservation Area ................................................................................ 16 Table 5: Site 5 - South Shore Road ..................................................................................................... 16 Table 6: Front Road - Capital Cost Estimate of Repairs...................................................................... 23 Table 7: Second Concession Road - Capital Cost Estimate of Repairs ............................................... 24 Table 8: Third Concession Road - Capital Cost Estimate of Repairs ................................................... 24 Table 9: Sand Beach Conservation Area - Capital Cost Estimate of Repairs ...................................... 25 Table 10: South Shore Road - Capital Cost Estimate of Repairs ........................................................ 25 Table 11: Centennial Park - Capital Cost Estimate of Repairs ............................................................ 26 Table 12: Finkle Shore Park - Capital Cost Estimate of Repairs ......................................................... 26 Table 13: Stella Bay Dock - Capital Cost Estimate of Repairs ............................................................. 26 Table 14: Bath Water Treatment Plant - Capital Cost Estimate of Repairs ....................................... 27 Table 15: Total Capital Cost Estimate of Repairs ............................................................................... 28 List of Photos Photo 1: Site 1 - Shoulder Erosion along Front Road ......................................................................... 11 Photo 2: Site 2 - Second Concession Road looking southeast, opposite Civic 8750 .......................... 12 Photo 3: Site 2 - Second Concession Road Shoulder Damage ........................................................... 13 Photo 4: Site 3 - Third Concession Road looking north (2017) .......................................................... 14 Photo 5: Site 3 – Third Concession Road looking north (2019) ......................................................... 15 Photo 6: Site 5 - Typical View of South Shore Road looking northwest (2017) ................................. 17 Photo 7: Site 5 - Typical View of South Shore Road looking southeast (2019) .................................. 18 Photo 8: Rock Embankment along the Shoreline adjoining Bath Centennial Park ............................ 19 Photo 9: Site 7 – Damaged Culvert at Finkle Shore Park ................................................................... 20 Photo 10: Site 8 - Stella Bay Dock Damage ........................................................................................ 21 Photo 11: Site 9 – Bath Water Treatment Plant Retaining Wall ........................................................ 22 ii Corporation of Loyalist Township Costing of Flood Related Damage to Municipal Infrastructure October 15, 2019 Appendices Appendix A – Site Photographs Appendix B – Sand Beach Conservation Area Monitoring Report Appendix C – Site Photographs Appendix D – Total Combined Flood Damage Cost Estimate iii Corporation of Loyalist Township Costing of Flood Related Damage to Municipal Infrastructure October 15, 2019

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    125 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us