(Php Million) Target Start of Implementation

(Php Million) Target Start of Implementation

INFRASTRUCTURE FLAGSHIP PROJECTS AS OF NOVEMBER 30, 2018 NEDA BOARD APPROVED - 35 PROJECTS Funding Total Project Cost Target Start of Target End of Feasibility No IA Project Title Project Description Location Status/Remarks Source (PhP Million) Implementation Implementation Study 1 DOTr New Cebu International The project aims to add to the current Cebu International Region VII Korea (Loan) 9,195.00 2018 2022 Completed Multi-Year Obligational Authority (MYOA) released by DBM on October Container Port Port twenty-foot equivalent unit (TEU) container yard 10, 2018. capacity of 7,373 TEUs to 14,400 TEUs. The new international port shall be built on a 25 ha. reclaimed land DOTr BAC transmitted the documents relative to the procurement of (Barangay Tayud, Municipality of Consolacion, Cebu), with consultancy services and civil works to the PS-DBM last October 30, 500 m berth length to accommodate two 2,000 TEU 2018. vessels; 4 quay cranes and superstructures (operation building, gate complex, weigh bridge, maintenance factory; Loan Agreement became effective on September 21, 2018. Loan and 1,450 m inland access road and 300 m offshore bridge. Agreement signed on June 4, 2018. 2 DOTr/ Subic-Clark Railway Project Construction of 71.13-km rail located in the western section Region III China (Loan)/ 50,031.00 2019 2022 Completed The Chinese Side provided the short list of qualified Chinese companies BCDA of Central Luzon running on an exclusive ROW parallel to GAA recommended by the Ministry of Commerce on November 01, 2018. The SCTEX with some sections adjacent project is in its pre-procurement stage, DOTr and BCDA are currently to it. It is divided into two (2) major sections: preparing the contract and bidding documents. a. Mainline – This is a 64.19-km railway connecting Subic Bay Freeport Zone and Clark Freeport Zone; and Target construction period: July 2019 - July 2022 b. Spur Line – This is a 6.94-km railway connecting the Subic Bay Port, New Container Terminal to the Mainline. 3 DPWH Ambal-Simuay River and The project involves the construction of various flood Region XII China (Loan) 39,219.68 2019 2025 Completed The Chinese Government has yet to provide the short list of qualified Rio Grande de Mindanao management infrastructures such as dikes/revetments and contractors for the project. River Flood Control flood gates, and conducting channel dredging among Projects others. Detailed description of the scope of works for each Target loan signing is in June 2019. Civil works to start in August 2019. component: TOR for Land Acquisition Plan and Resettlement Action Plan (LAPRAP) For Ambal-Simuay: and Construction Supervision and Tender Assistance Services is on River widening and construction of parallel dikes along the final review by DPWH - Bureau of Design. river to the cut-off channel; A new channel with a dike-to- dike width of 250 meters; Dredging and excavation of an estimated 2.87 million cubic meters of materials to achieve the design river width, covering a total length of 11.2 kilometers; and Construction of an 11.6- kilometer dike and a 9.1-kilometer dike along the left and right banks, respectively. 4 DPWH Palanca-Villegas (2nd Involves the construction of a 438.1 m (of which, main NCR China (Loan) 1,595.49 2019 2023 Completed The Chinese Government has yet to provide the short list of qualified Ayala) (initially submitted as bridge: 125 m), 2-lane (with 3m sidewalks), 2-span contractors for the project. Ayala Bridge) Prestressed Concrete Extradosed Bridge to connect Villegas side (at A. Villegas Street) and Palanca side (at The DPWH submitted to DOF on June 6, 2018 the requisite documents (part of the Pasig-Marikina Carlo Palanca Street). The proposed bridge will be between to facilitate the application for the Preferential Buyer's Credit (PBC) loan and River Manggahan Quezon Bridge and Ayala Bridge. from China. Floodway Bridges Construction Project) Terms of Reference and Approved Budget for the Contract for LAPRAP (now RAP) were already approved. Target Award for RAP is in January 2019 (using CY 2019 Funds). INFRASTRUCTURE FLAGSHIP PROJECTS AS OF NOVEMBER 30, 2018 NEDA BOARD APPROVED - 35 PROJECTS Funding Total Project Cost Target Start of Target End of Feasibility No IA Project Title Project Description Location Status/Remarks Source (PhP Million) Implementation Implementation Study 5 DPWH Beata-F.Y. Manalo Bridge Involves the construction of a 637 m (of which, main bridge: NCR China (Loan) 1,386.61 2021 2023 Completed The Chinese Government has yet to provide the short list of qualified (initially submitted as 165 m), 2-lane (with 3m sidewalks), 3-span Prestressed contractors for the project. Pandacan-Sta Ana Bridge) Concrete Box Girder Bridge to connect Beata side (at Beata Street and Padre Jacinto Zamora Street) and Manalo side The DPWH submitted to DOF on June 6, 2018 the requisite documents (part of the Pasig-Marikina (at Felix Manalo Street). The proposed bridge will be to facilitate the application for the Preferential Buyer's Credit (PBC) loan and River Manggahan between Pandacan Bridge and Lambingan Bridge from China. Floodway Bridges Construction Project) Terms of Reference and Approved Budget for the Contract for LAPRAP (now RAP) were already approved. Target Award for RAP is in January 2019 (using CY 2019 Funds). 6 DPWH Blumentritt-Antipolo Bridge Involves the construction of a 364 m (of which, main bridge: NCR China (Loan) 1,103.34 2021 2023 Completed The Chinese Government has yet to provide the short list of qualified 87 m), 2-lane Nielsen Arch Bridge to connect Makati side contractors for the project. (part of the Pasig-Marikina (at Antipolo Street) and Mandaluyong side (at Coronado and River Manggahan Street). The proposed bridge will be between Lambingan The DPWH submitted to DOF on June 6, 2018 the requisite documents Floodway Bridges Bridge and Makati-Mandaluyong Bridge. to facilitate the application for the Preferential Buyer's Credit (PBC) loan Construction Project) from China. Terms of Reference and Approved Budget for the Contract for LAPRAP (now RAP) were already approved. Target Award for RAP is in January 2019 (using CY 2019 Funds). 7 DPWH Marikina-Vista Real Bridge Involves the construction of a 414.9 m (of which, main NCR ADB (Loan) 1,813.78 2020 2023 Completed The NEDA Board, during its April 25, 2018 meeting, confirmed the ICC- (initially submitted as bridge: 105 m), 4-lane (2-lanes per direction with 3m CC approval of the project, with possible loan assistance from the ADB. Kabayan-Katipunan Bridge) sidewalks), 2-span Prestressed Concrete Extradosed Bridge to connect Marikina side (at Kabayani road) and The ICC-CC, in its March 8, 2018 meeting, approved the project as part (part of the Pasig-Marikina Vista Real side (at Stockholm and Delhi Streets). The of the Pasig-Marikina and River Manggahan Floodway Bridges and River Manggahan proposed bridge will be between Tumana Bridge and Construction. Floodway Bridges Batasan-San Mateo Bridge. Construction Project) 8 DPWH J.P. Rizal - Lopez Jaena Involves the construction of a 594.2 m (of which, main NCR ADB (Loan) 1,610.81 2020 2023 Completed The NEDA Board, during its April 25, 2018 meeting, confirmed the ICC- Bridge (initially submitted bridge: 100 m), 2-lane (with 3m sidewalks) Steel Nielsen CC approval of the project, with possible loan assistance from the ADB. as Reposo-Guatemala Arch Bridge to connect J.P. Rizal Street and Lopez Jaena Bridge ) Street in Marikina City. The proposed bridge will be The ICC-CC, in its March 8, 2018 meeting, approved the project as part between Tumana Bridge and Marikina Bridge. of the Pasig-Marikina and River Manggahan Floodway Bridges (part of the Pasig-Marikina Construction. and River Manggahan Floodway Bridges Construction Project) 9 DPWH J.P. Rizal - St. Mary Bridge Involves the construction of a 1,178.2 m (of which, main NCR ADB (Loan) 5,738.76 2020 2023 Completed The NEDA Board, during its April 25, 2018 meeting, confirmed the ICC- (initially submitted as JP bridge: 150 m), 2-lane (with 3m sidewalks) Prestressed CC approval of the project, with possible loan assistance from the ADB. Rizal-Yale Bridge) Concrete Extradosed Bridge to connect J.P. Rizal Street and A. Bonifacio Avenue in Marikina City. The proposed The ICC-CC, in its March 8, 2018 meeting, approved the project as part (part of the Pasig-Marikina bridge will be between Marikina Bridge and Marcos Bridge. of the Pasig-Marikina and River Manggahan Floodway Bridges and River Manggahan Construction. Floodway Bridges Construction Project) INFRASTRUCTURE FLAGSHIP PROJECTS AS OF NOVEMBER 30, 2018 NEDA BOARD APPROVED - 35 PROJECTS Funding Total Project Cost Target Start of Target End of Feasibility No IA Project Title Project Description Location Status/Remarks Source (PhP Million) Implementation Implementation Study 10 DPWH Mercury-Evangelista Bridge Involves the construction of a 527.8 m (of which, main NCR ADB (Loan) 1,375.30 2020 2023 Completed The NEDA Board, during its April 25, 2018 meeting, confirmed the ICC- (initially submitted as G. bridge: 77 m), 2-lane (Evangelista side with 3m sidewalks) CC approval of the project, with possible loan assistance from the ADB. Gabriel Mercury Ave Prestressed Concrete Extradosed Bridge to connect Bridge) Quezon City side (at Mercury Avenue) and Pasig City side The ICC-CC, in its March 8, 2018 meeting, approved the project as part (at Evangelista Street). The proposed bridge will be of the Pasig-Marikina and River Manggahan Floodway Bridges (part of the Pasig-Marikina between Diosdado Macapagal Bridge and Caruncho Construction. and River Manggahan Bridge. Floodway Bridges Construction Project) 11 DPWH East-west Bank Bridge 1 Involves the construction of a 200 m (of which, main bridge: NCR China (Loan) 1,538.04 2021 2023 Completed The Chinese Government has yet to provide the short list of qualified 100 m), 2-lane (with 3m sidewalks) Steel Nielsen Arch contractors for the project.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us