Boca Dam Safety of Dams Modification Project

Boca Dam Safety of Dams Modification Project

Boca Dam Safety of Dams Modification Project Environmental Assessment/Initial Study Environmental Assessment No. 15-03-MP Nevada County, California U.S. Department of the Interior California Regional Water Quality Control Board Bureau of Reclamation Lahontan Region Mid-Pacific Region Office Region 6 – South Lake Tahoe Office Sacramento, California South Lake Tahoe, California January 2018 [This page intentionally left blank] 0 Table of Contents SECTION 1 INTRODUCTION ..................................................................................................... 6 1.1 Background ................................................................................................................ 6 1.2 Need for Proposed Action/Proposed Project ............................................................ 7 1.3 Document Structure ................................................................................................... 8 1.4 Environmental Setting ................................................................................................ 8 1.4.1 Topography and Geology .............................................................................................................. 8 1.4.2 Weather.......................................................................................................................................... 9 1.4.3 Hydrology and Water Supply ....................................................................................................... 11 1.4.4 Water Quality ............................................................................................................................... 14 1.4.5 Air Quality .................................................................................................................................... 15 1.4.6 Biological Resources ................................................................................................................... 18 1.4.7 Recreational Activities .................................................................................................................. 21 1.4.8 Visual Resources ......................................................................................................................... 22 1.4.9 Traffic and Circulation .................................................................................................................. 22 1.4.10 Fire Danger .................................................................................................................................. 23 1.4.11 Cultural Resources ...................................................................................................................... 23 1.4.12 Waters of the U.S./Waters of the State ........................................................................................ 24 1.4.13 Noise ............................................................................................................................................ 24 SECTION 2 ALTERNATIVES ................................................................................................... 25 2.1 No Action Alternative ................................................................................................ 25 2.2 Proposed Action Alternative – Shear Key and Stability Berm .................................. 26 2.2.1 Schedule ...................................................................................................................................... 26 2.2.2 Reservoir Operations During Construction .................................................................................. 28 2.2.3 Spillway Modifications .................................................................................................................. 29 2.2.4 Site Preparation ........................................................................................................................... 30 2.2.5 Cutoff Wall, Shear Key, Stability Berm, and Embankment Overlay Construction ....................... 31 2.2.6 Road Use and Public Access....................................................................................................... 36 2.2.7 Haul Routes ................................................................................................................................. 40 2.2.8 In-Reservoir Borrow Area (IRBA)................................................................................................. 41 2.2.9 Staging and Stockpiling Areas ..................................................................................................... 42 2.2.10 Mitigation Measures for the Proposed Action Alternative ............................................................ 43 2.2.11 Obtaining Permits and Other Approvals ...................................................................................... 56 2.3 Reservoir Restriction Alternative .............................................................................. 57 2.3.1 Mitigation Measures for the Reservoir Restriction Alternative ..................................................... 59 2.4 Dam Breach Alternative ........................................................................................... 59 SECTION 3 EVALUATION OF ENVIRONMENTAL IMPACTS ................................................ 61 3.1 Resources Analyzed ................................................................................................ 61 3.1.1 Aesthetics .................................................................................................................................... 61 3.1.2 Agriculture and Forestry Resources ............................................................................................ 64 3.1.3 Air Quality .................................................................................................................................... 65 3.1.4 Biological Resources ................................................................................................................... 68 3.1.5 Cultural Resources ...................................................................................................................... 87 3.1.6 Geology and Soils ........................................................................................................................ 89 3.1.7 Greenhouse Gas Emissions ........................................................................................................ 91 3.1.8 Hazards and Hazardous Materials .............................................................................................. 92 3.1.9 Hydrology and Water Quality ....................................................................................................... 96 3.1.10 Land Use and Planning .............................................................................................................. 115 3.1.11 Mineral Resources ..................................................................................................................... 116 1 3.1.12 Noise .......................................................................................................................................... 117 3.1.13 Population and Housing ............................................................................................................. 121 3.1.14 Public Services .......................................................................................................................... 122 3.1.15 Recreation .................................................................................................................................. 124 3.1.16 Transportation/Traffic ................................................................................................................. 128 3.1.17 Utilities and Service Systems..................................................................................................... 131 3.1.18 Tribal Cultural Resources .......................................................................................................... 132 3.1.19 Mandatory Findings of Significance ........................................................................................... 133 SECTION 4 OTHER FEDERAL ENVIRONMENTAL COMPLIANCE REQUIREMENTS....... 138 4.1 Indian Sacred Sites ................................................................................................ 138 4.2 Indian Trust Assets ................................................................................................ 138 4.3 Environmental Justice ............................................................................................ 140 4.4 Consultation and Coordination ............................................................................... 141 SECTION 6 REFERENCES .................................................................................................... 142 2 Figures Page Figure 1 Location of Boca Dam 6 Figure 2 Features of Boca Dam 7 Figure 3 Profile of modeled dam deformation during 9 an earthquake Figure 4 Drought areas in the western United States 10 Figure 5 Little Truckee River Watershed within the 11 Lower Truckee River Watershed Figure 6 Hydrograph of Boca Reservoir since 2009 14 Figure 7 Air basin location 16 Figure 8 Attainment status for the NSAQMD 18 Figure 9 Concept Level Construction Schedule 27 Figure 10 Hypothetical Boca Reservoir Operation at Full Pool during Temporary Reservoir 29 Drawdown Figure 11 Proposed Action Alternative in-reservoir 30 borrow area (indicated in orange) Figure 12 Proposed Action Alternative

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    148 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us