(Parabolic Trough) on the Farm Sand Draai 391, Northern Cape – Final Consultation Environmental Impact Report

(Parabolic Trough) on the Farm Sand Draai 391, Northern Cape – Final Consultation Environmental Impact Report

Environmental Impact Assessment Study for the proposed Concentrated Solar Power Plant (Parabolic Trough) on the farm Sand Draai 391, Northern Cape – Final Consultation Environmental Impact Report April 2016 Document Description Client: Solafrica Energy (Pty) Ltd Project Name: Environmental Impact Assessment Study for the proposed Concentrated Solar Power Plant (Parabolic Trough) on the farm Sand Draai 391, Northern Cape Royal HaskoningDHV Reference Number: T01.JNB.000565 Compiled by: Johan Blignaut Date: April 2016 Location: Woodmead Review and approval: Prashika Reddy Page | i Table of Contents 1 INTRODUCTION ........................................................................................................... 1 1.1 Project Background ............................................................................................................................ 1 1.2 Approach to the Environmental Impact Assessment Study ............................................................... 1 1.2.1 Conclusions of the Environmental Scoping Study (ESS) ................................................................... 1 1.2.2 Environmental Impact Assessment Process ...................................................................................... 2 1.2.2.1 Environmental Impact Assessment Report Structure .................................................................. 2 1.2.2.2 Specialist Studies ......................................................................................................................... 4 1.2.2.3 Final Environmental Management Programme ............................................................................ 5 1.3 Concurrent Licencing Processes ....................................................................................................... 6 1.3.1 Water Use Licence ............................................................................................................................. 6 1.3.2 Zoning ................................................................................................................................................ 7 1.4 Details of the Environmental Assessment Practitioner ...................................................................... 8 2 PROJECT DESCRIPTION ............................................................................................ 9 2.1 Site Locality ........................................................................................................................................ 9 2.2 Detailed Design of the CSP Plant using Parabolic Trough Technology ............................................ 9 2.2.1 Solar Collector Field Parabolic Trough Systems ............................................................................. 12 2.2.1.1 Parabolic Trough Collectors ....................................................................................................... 12 2.2.1.2 Receiver Tube ............................................................................................................................ 12 2.2.1.3 Base Frame, Connecting Elements, Tracking and Control System ........................................... 12 2.2.2 Power Block ..................................................................................................................................... 13 2.2.2.1 Pre-heating System .................................................................................................................... 13 2.2.2.2 Steam Generator System ........................................................................................................... 14 2.2.2.3 Steam Turbine Generator ........................................................................................................... 14 2.2.2.4 Air Cooled Condenser ................................................................................................................ 14 2.2.2.5 Generator/Synchronous Motor ................................................................................................... 15 2.2.2.6 Heat Transfer Fluid (HTF) .......................................................................................................... 15 2.2.3 Auxiliary Facilities/Infrastructure ...................................................................................................... 15 2.2.3.1 Water Abstraction System .......................................................................................................... 15 2.2.3.2 Water Storage (Regulation) Ponds ............................................................................................ 17 2.2.3.3 Water Treatment Infrastructure .................................................................................................. 18 2.2.3.4 Access Roads ............................................................................................................................. 19 2.2.3.5 Power Line .................................................................................................................................. 19 Page | ii 2.2.3.6 Waste Generation (Liquid Effluent) ............................................................................................ 20 2.2.3.7 Evaporation Ponds ..................................................................................................................... 21 2.2.3.8 Sanitary Waste ........................................................................................................................... 22 2.2.3.9 Solid Waste Generation.............................................................................................................. 23 2.2.3.10 Storeroom(s), Laydown Area, Construction Camp and Assembly Plant ................................... 24 2.3 Operations ........................................................................................................................................ 25 3 PROJECT ALTERNATIVES ....................................................................................... 26 3.1 Site Alternatives ............................................................................................................................... 26 3.1.1 Site Alternatives identified within the Northern Cape Province ........................................................ 26 3.1.2 Consideration of the Sand Draai Farm for the Development of the new CSP Plant ....................... 27 3.2 Technology Alternatives ................................................................................................................... 28 3.3 Design/Layout Alternatives .............................................................................................................. 30 3.3.1 Linear Infrastructure Corridors ......................................................................................................... 30 3.3.1.1 Water Supply Pipelines .............................................................................................................. 30 3.3.1.2 Access Roads ............................................................................................................................. 30 3.3.1.3 Power (Transmission) Line ......................................................................................................... 30 3.4 No-Go Alternative ............................................................................................................................. 31 4 PROJECT NEED AND DESIRABILITY ...................................................................... 32 5 LEGISLATION ............................................................................................................ 35 5.1 National Environmental Management Act (No 107 of 1998) ........................................................... 35 5.1.1 EIA Regulations (2014) .................................................................................................................... 35 5.2 National Environmental Management: Waste Act (No 59 of 2008) ................................................. 37 5.3 The National Water Act (No 36 of 1998) .......................................................................................... 38 5.4 National Environmental Management: Air Quality Act (No 39 of 2004) ........................................... 39 5.5 Hazardous Substance Act (No 15 of 1973) and Regulations .......................................................... 39 5.6 Other Relevant Acts, Guidelines, Department Policies and Environmental Management Instruments 40 6 PUBLIC PARTICIPATION .......................................................................................... 42 6.1 Consultation with Competent Authorities ......................................................................................... 43 6.2 Consultation with other Relevant Authorities and Key Stakeholders ............................................... 44 6.3 I&AP Database ................................................................................................................................. 44 6.4 Identification of Interested and Affected Parties .............................................................................. 44 6.5 Advertising ........................................................................................................................................ 44 6.6 Issues Trail ....................................................................................................................................... 44 6.7 Review of the Environmental Impact Assessment Report and

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    201 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us