Seiaa-Karnataka Checklist For

Seiaa-Karnataka Checklist For

SEIAA-KARNATAKA CHECKLIST FOR INFRASTRUCTURE PROJECTS File No : SEIAA 1 IND 2013 Project Name : Establishment of Dobaspet 4th Phase Industrial Area, in the villages of Yedehalli, Chandana Hosahalli, Honnenahalli, Kengal Kempohalli, Avverahalli, K.G.Srinivasapura, Billankote, Nelamangala Taluk, Bengaluru Rural District by Karnataka Industrial Areas Development Board S.No Documents ✓/X 1 Form-I ✓ 2 Pre-Feasibility Report (PFR) in the format prescribed by MoEF, ✓ GOI 3 Environmental Management Plan (EMP) ✓ 4 Conceptual Plan/Layout Plan indicating all ✓ components/infrastructure 5 Topo-sheet Duly marking the project site with 10 km radius ✓ 6 Original Village map duly marking Project site. Adjacent village ✓ maps of the project site is located at the vicinity of the village boundary. 7 Latest Google map duly marking the project site ✓ 8 CDP duly marking the project site ✓ 9 Latest site photographs ✓ 10 Land documents ✓ a Sale Deed b Khatha Certificate c Mutation Copy d Land Allotment Letter in case of KIADB/SEZ e Survey Sketch,Podi etc., f R.T.C g Joint Development Agreement if Applicable h Gazette Notification regarding land acquisition under ✓ section 4(1) & 6(1) of Karnataka Land Revenue Act in case of Projects covered under 7(C) of EIA notification, 2006 i List of Survey No’s and Extent in case of Projects under ✓ under 7(C) of EIA notification, 2006 j Others (Specify) k Disputes if any and copy of documents/ orders there off 11 Copy of Earlier EC, CFE/CFO issued by KSPCB in case of ✓ expansion and modification projects. 12 Certified report of the status of compliance of the conditions stipulated in the EC from the Regional Office of MoEF&CC in case of expansion and modification 13 Comparative statement of the project profile between the existing ✓ and the proposed with difference thereof in case of expansion/modification 14 Copies of Clearance obtained from other Regulatory Authority and relevant order of Government with regard to sanction of the project a. NOC from competent Authority regarding Water supply ✓ b. Copy of sanction order of the Commerce and Industries NA department/ KUM/HLCC c. NOC from Factories and Boiler department NA d. MoU Letter/ Approval Letter from GAIL regarding supply NA of PNG for DG set. e. Applicability of CRZ Notification and Clearance NA recommendations from competent authority if applicable. f. Other specify NA 15 Copy of Gazette Notification regarding applicability of ESZ/ESA NA if the project site is at the vicinity of the protected areas notified under Wildlife act/ E(P) Act. 16 Copy of Gazette Notification if the project site is located in NA notified Industrial area. 17 Accreditation Certificate of Consultant ✓ 18 Letter of Authorization issued by the company, Partnership / NA proprietor if the authorized signatories other than the proprietor himself for filing of application before SEIAA 19 DD towards processing fee in accordance with G.O No FEE 46 ✓ EPC 2013 dated 10.05.2013 amended from time to time. 20 Any other documents related to the project proposal NA UPDATED FORM 1& PFR FOR Amendment in the Environmental Clearance to include Red Category Industries in the Dobaspet 4th Phase Industrial Area in the villages of Yedehalli, Chandana Hosahalli, Honnenahalli, Kengal Kempohalli, Avverahalli, K.G. Srinivasapura, Billanakote, Nelamangala Taluk, Bangalore Rural District, Karnataka Schedule 7(C) – Industrial Estates and SEZs , Category “B” Project Proponent Prepared By NABET/EIA/1619/RA0048 September 2017 FORM-I FORM - I FORM I (I) BASIC INFORMATION S.NO ITEM DETAILS 1 Name of the project/s Amendment in Environmental Clearance to include Red Category Industries at Dobaspet 4th Phase Industrial Area in the Villages of Yedehalli, Chandana Hosahalli, Honnenahalli, Kengal Kempohalli, Avverahalli, K.G.Srinivasapura, Billanakote, Nelamangala Taluk, Bangalore Rural District. 2 S. No. in the schedule 7 (C) 3 Proposed capacity /area/length/tonnage to be No change - 360.68 Hectares handled/command area/lease (891.26 Acres) area/number of wells to be drilled 4 New/Expansion/Modernization Amendment 5 Existing Capacity/ Area etc. 360.68 Hectares (891.26 Acres) 6 Category of Project i.e. ‘A’ or ‘B’ B 7 Does it attract the general No condition? If yes, please specify. 8 Does it attract the specific No condition? If yes, please specify. 9 Location In the villages of Yedehalli, Chandana Hosahalli, Honnenahalli, Kengal Kempohalli, Avverahalli, K.G. Srinivasapura, Billanakote, Nelamangala Taluk, Bangalore Rural District. Plot/survey/ Khasra.No Land Documents enclosed as Annexure I Villages Yedehalli, Chandana Hosahalli, Honnenahalli, Kengal Kempohalli, Avverahalli, K.G.Srinivasapura, Billanakote Tehsil Nelamangala Taluk District Bangalore Rural District State Karnataka 10 Nearest railway station/airport Dobaspet Railway Station – 3.6 along with distance in kms K.m 1 SEPTEMBER 2017 FORM - I 11 Nearest town, city, District Nelamangala (20.0 K.m) Headquarters along with Bangalore (44.0 K.m) distance in kms. 12 Village Panchayats, zilla parished, municipal corporation, local body(complete Nelamangala Taluk postal address with telephone nos. to be given) 13 Name of the applicant Chief Development Officer & Chief Engineer 14 Registered address Karnataka Industrial Area Development Board, No. 49, 4th & 5th Floor, East Wing, Khanija Bhavan, Racecourse Road, Bengaluru - 560001 15 Address for correspondence Name Chief Development Officer & Chief Engineer Designation Chief Development Officer & Chief (Owner/Partner/CEO) Engineer Address Karnataka Industrial Area Development Board, No. 49, 4th & 5th Floor, East Wing, Khanija Bhavan, Racecourse Road, Bengaluru Pin Code 560 001 E-Mail [email protected] Telephone No (080) 22215383, 22215069,22211066 Fax No 080-22217702 16 Details of Alternative Sites No Examined, if any, Location of these sites should be shown on a topo sheet. 17 Interlinked Projects Not Applicable 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. 2 SEPTEMBER 2017 FORM - I (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Land is acquired by Karnataka government order/ Industrial areas Development Policy relevant/ relating to the Board (KIADB) as per the following site? policies and acts a) Karnataka Export Promotion Policy b) Karnataka Industrial Policy 2014- 2019 c) The Karnataka Industrial Areas Development Act, 1966. 23 Forest land involved (hectares) Nil 24 Whether there is any litigation No pending against the and/ or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Order/ directions of the Court, if any And its relevance with the proposed project (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof with approximate S. Information/Checklist Yes/No quantities/rates, wherever No confirmation possible) with source of information data 1.1 Permanent or No No change in Land use as it is temporary change in an operating Industrial Estate. land use, land cover or topography including increase intensity of land use (with respect to local land use plan) 1.2 Clearance of existing No Does not arise land, vegetation and 3 SEPTEMBER 2017 FORM - I Buildings? 1.3 Creation of new land No Not applicable uses? 1.4 Pre-construction No No new activity is proposed as investigations e.g. bore this is only inclusion for Red Houses, soil testing? category Industries. 1.5 Construction works? No Not applicable 1.6 Demolition works? No Not applicable 1.7 Temporary sites used No Not applicable for construction works or housing of construction workers? 1.8 Above ground buildings, No Not applicable structures or earthworks including linear structures, cut and fill or excavations 1.9 No No underground works Underground works including mining/tunneling is mining or tunneling? required. 1.10 Reclamation works? No Only leveling of ground if required 1.11 No No dredging is expected to be Dredging? involved as part of this project. 1.12 Off shore structures? No No offshore structures required as part of this project. 1.13 Production and Yes Since it is an industrial area manufacturing the production and processes? manufacturing processes shall be practiced by individual industries within the industrial area. 1.14 Facilities for storage of Yes Existing Storage facilities will goods or materials? be used for raw materials, finished products and required fuels by the respective unit. 1.15 Facilities for treatment Yes Industries would be instructed or disposal of solid to use scientific methods like 4 SEPTEMBER 2017 FORM - I waste or liquid Zero Liquid Discharge (ZLD effluents? ) or disposal through CETP as the Industrial Area falls under TGR Zone I 1.16 Facilities for long term No Not Applicable housing of operational workers? 1.17 New road, rail or sea Yes The existing infrastructures traffic during like connectivity/ approach Construction or roads will be utilized. operation? 1.18 New road, rail, air No As mentioned in the section waterborne or other 1.17 transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No The existing infrastructure existing transport and transport routes would be routes or infrastructure used. leading to changes in Traffic movements? 1.20 New or diverted Yes Power transmission lines are transmission lines or developed by KPTCL Pipelines? 1.21 Impoundment, No Not Applicable damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No 1.23 Abstraction or transfers No Not Applicable of water form ground or surface waters? 1.24 Changes in water bodies No There will be no change in or the land surface water bodies or the land affecting drainage or affecting drainage or run off.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    57 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us