CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT Engineering Grading Inspection Report Permit No. Project Address Property Owner Lot No. Certified ROUGH GRADING INSPECTION SOILS ENGINEER: All earthen fills were placed upon proper base material, benched where required, and compacted in accordance with the approved grading plan, soils report and applicable provisions of the City of Arroyo Grande Grading Ordinance. Based on field observations and testing, the site has been adequately prepared for its intended use as affected by soils factors. Stamp Tract Grading Completed Yes No N/A Soils Engineer Date Signature CIVIL ENGINEER: The rough grading has been substantially completed in accordance with the approved plans. The site has been graded to approximate rough grade elevations and temporary erosions and sedimentation control have been installed. Verification of work includes grading to the pad elevation (within 0.04’), and to the horizontal limits of the building pad as shown. Stamp Civil Engineer Date Signature Pad Certs Included? (Survey & Geotech) Yes No N/A FINAL GRADING INSPECTION CIVIL ENGINEER: The grading work has been satisfactorily completed in accordance with the approved plans and applicable provisions of the City of Arroyo Grande Grading Ordinance. All required drainage improvements, final drainage slopes and permanent erosion control devices have been installed. Adequate provisions have been made for the drainage of surface waters away from the building site(s). Stamp Tract Grading Completed Yes No N/A Civil Engineer Date Signature 300 E. BRANCH STREET | ARROYO GRANDE, CALIFORNIA 93420 | (805) 473-5420 PAGE 1 OF 1 www.arroyogrande.org | [email protected] UPDATED 8/22/2019 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-