Pre-Feasibility Report of Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275, State- Karnataka PRE-FEASIBILITY REPORT Consultant- Ascenso Enviro Pvt. Ltd. Page 1 of 26 Pre-Feasibility Report of Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275, State- Karnataka 1.0 EXECUTIVE SUMMARY Information Details Improvement and Widening to six lanes, Maintenance, Project name Management and Operation of Bangalore to Mysore section of National Highway No. 275 Length of the road 117.304 Km Location of Project Bangalore South, Ramanagara, Channapatna, Maddur, Mandya, Srirangapatna and Mysore Taluks of Bangalore Villages Urban, Ramanagara, Mandya and Mysore Districts traversing through 81 Villages., District : Bangalore Urban, Ramanagara, Mandya and Mysore Districts State : Karnataka No of working days 250 days Water demand 750 KLD Man Power 500 Nearest railway station Refer Annexure -II Nearest state Refer Annexure -II highway/national highway Nearest Air port Refer Annexure -II 2. INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION Proposed project is the development and up gradation of existing 4-lane road to 6-lane with paved shoulders and Service road configuration of NH 275 between Bangalore and Mysore. The project corridor starts from the junction at Km 18 near Panchamukhi Temple junction in Bangalore south zone) and ends after Srirangapatna (Km 135.304) at Mysore Ring Road Junction (Columbia Asia Hospital). The total length of the highway upto Columbia Asia Hospital is 117.304 km. 2.1 Identification of Project and Project Proponent Proposed project is Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275. Proponent of the proposed project is National Highway Authority of India. 2.2 Brief description of nature of the project The proposed project involves the Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275. Consultant- Ascenso Enviro Pvt. Ltd. Page 2 of 26 Pre-Feasibility Report of Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275, State- Karnataka The total length is 117.304 km and ROW for the proposed project is 45 meters and 60 meters for elevated sections and at grade widening respectively and land for Toll Plazas, Underpasses and Overpasses. The land required for proposed widening / six-laning is about 47,96,374 square meters (1,73,011 square meters in Bangalore Urban; 22,14,874 square meters in Ramnagara; 23,37,808 square meters in Mandya; and 70,681 square meters in Mysore). 2.3 Need for the Project and Its Importance to the Country or Region: Roads are the key to the development of our economy. A good road network constitutes the basic infrastructure that propels the development process through connectivity and opening up the backward regions to trade and investment. However, despite their importance to the national economy, the road network in India is grossly inadequate. The existing network is unable to cope up with high traffic density. Roads are now recognized as an infrastructure critical to economic and industrial growth. India has one of the largest road networks in the world, aggregating to about 33 lakh km length of roads at present. The country’s road network consists of National Highways, State Highways, Major District Roads and Village and Other District Roads. The National Highways comprises only 2% of the total length of roads, but carries over 40% of the total traffic across the length and breadth of the country. The development and maintenance of National Highways are the responsibility of the Central Government, whereas the State Government concerned is responsible for road other than National Highways. The road network in Karnataka is extensive in terms of total. However, of the total road length of about 2, 09,871km, nearly 75 percent are village roads that are mostly narrow, unpaved mud tracks. About 6,466 km length or about 3 percent of the total network is of 2 or more lanes, which includes National Highways, State Highways, and Major District Roads; the rest are either single lane or intermediate lanes. Given the poor rail connectivity in Karnataka, road network is often the only linkage between the rural and urban economies of the State. GoK has realized that it is necessary to expand and upgrade a well-defined core network of at least 40,000 km of NH, SH and MDRs in the State on a priority basis in order to retain Karnataka’s competitive edge in economic development. With the very high traffic growth witnessed in recent years, capacity constraints have developed on almost all existing roads which are now not only highly congested but are also subject to intensive wear and tear. 2.4 Demands-Supply Gap In the past 5 years GoK has vigorously pursued improvement of road network in the State; 958 km of NH by NHAI, 2,414 km of SH by KSHIP, 970km of SH and 560 bridges by KRDCL and 1,000 km of SH and MDR by PWD besides 8,900 km of village connectivity roads under PMGSY have been completed. However, the pace of development is inadequate and GoK envisages faster development through mobilization of private sector resources on a large scale for the construction, operation and maintenance of roads. The vision of GoK is to Consultant- Ascenso Enviro Pvt. Ltd. Page 3 of 26 Pre-Feasibility Report of Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275, State- Karnataka develop 25,000 km of core road network (SH, NH) and upgrade 35,000 km of feeder roads (MDR) and provide 1, 50,000 km of village connectivity roads by the year 2020. 2.5 Imports vs. Indigenous Production All the materials and machineries proposed to be used Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275 will be indigenous in origin. 2.6 Export Possibility The proposed project of Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275 does not seek the export possibility. 2.7 Domestic/ Export Markets The Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275will cater domestic markets. 2.8 Employment Generation (Direct and indirect) due to the project The direct and indirect employment generation due Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275) approx 500 persons will be involved. Preference will be given to local workers. 3. PROJECT DESCRIPTION 3.1 Type of Project Including Interlinked and Interdependent Projects, If Any. The Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275 is not interlinked and interdependent. The project is rather independent and will set a precedent to the ancillary development. 3.2 Location The Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275 is passing through the four districts of Karnataka State i.e. Bangalore Urban, Ramanagara, Mandya & Mysore. Details of district, their respective taluks and villages are given in Table No.-1 Consultant- Ascenso Enviro Pvt. Ltd. Page 4 of 26 Pre-Feasibility Report of Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275, State- Karnataka Table No-1: Details of Village/ settlements through with the widening / six-laning will take place Name of the district Name of the taluk Name of the village 1. Kengeri 1. Bangalore South 2. Kambipura 1. Bangalore Urban (four villages) 3. Kumbalagodu 4. Kaniminike 1. Hejjala 2. Sheshagirihalli 3. Manchanaykanahalli 4. Lakshmisagara 5. Bheemenahalli 6. Vajarahalli 7. Kethiganahalli 8. Avaragere 9. Muddapurakare na Halli 10. Kenchanakuppe 11. Kallugopahalli 1. Ramanagara 12. Hulthar State Forest (twenty three villages) 13. Kempanahalli 14. Mayaganahalli 15. Madapura 16. Kethohalli 2. Ramanagara 17. Basavanapura 18. Vaderahalli 19. Hallimala 20. Jeegenahalli 21. Bilagumba 22. Keshavapura 23. Dodddamannugudde Forest 1. Kannamangala 2. Cholamaranahalli 3. Devarahosahalli 4. Rampura 2. Channapatna 5. Mangalavarapete (twelve Villages) 6. Maluru 7. Shettihalli 8. Mattikere 9. Mudigere 10. Mudigere Plantation Consultant- Ascenso Enviro Pvt. Ltd. Page 5 of 26 Pre-Feasibility Report of Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275, State- Karnataka Name of the district Name of the taluk Name of the village 11. Dabanugunda 12. Koluru 1. Nidaghatta 2. Madapurada doddi 3. Rudrakshipura 4. Theyluru 1. Maddur 5. Agralingangana doddi (Ten villages) 6. K. Kodihalli 7. Maddur 8. Mobbalagere 9. Goravanahalli 10. Gejjalagere 1. Halasagere 2. B. Gowdagere 3. Boodanuru 4. Ummadahalli 5. Sathanuru 6. Gopalapura 7. Mandya 8. B. Hosahalli 2. Mandya 3. Mandya 9. Holalu (Seventeen villages) 10. Panakanahalli 11. Kiraganduru 12. Induvalu 13. Sundahalli 14. Yaliyuru 15. Kalenahalli 16. Elechakanahalli 17. Ragimuddana halli 1. Siddapura 2. Gananguru 3. Gowdahalli 4. M.Shettihalli 3. Srirangapatna 5. K.Shettihalli (Ten Villages) 6. Kallikoppalu (B) 7. Kiranguru 8. Srirangapatna 9. B.Agrahara 10. Brahmapura 1. Mysore 1. Kalasthavadi 4. Mysore (Five Villages) 2. Naganahalli Consultant- Ascenso Enviro Pvt. Ltd. Page 6 of 26 Pre-Feasibility Report of Improvement and Widening to six lanes, Maintenance, Management and Operation of Bangalore to Mysore section of National Highway No. 275, State- Karnataka Name of the district Name of the taluk Name of the village 3.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages26 Page
-
File Size-