Indicative Generation Capacity Expansion Plan (IGCEP) 2018-40

Indicative Generation Capacity Expansion Plan (IGCEP) 2018-40

Identify Require -ments Provide Satisfy IGCEP Plan Objectives LOLP Cater Growth Power System Planning National Transmission and Dispatch Company (NTDC) February 2019 Table of Contents List of Figures ..................................................................................................................... v List of Charts ...................................................................................................................... vi List of Tables ..................................................................................................................... vii Acronyms ......................................................................................................................... viii Useful Links of Stakeholder Entities ............................................................................... xii Foreword ............................................................................................................................. 1 Acknowledgements ............................................................................................................ 2 1. Power System Planning – Gateway to NTDC ........................................................ 3 2. Setting the Perspective ........................................................................................... 6 2.1. Generation Planning – A Subset of Power System Planning ..................................... 6 2.2. Preamble ................................................................................................................... 7 2.3. Introduction ............................................................................................................... 7 2.4. Objectives of the IGCEP ............................................................................................ 8 2.5. Scope and Planning Horizon ..................................................................................... 9 2.6. Nature of the IGCEP .................................................................................................. 9 2.7. Rationale for Preparation of the IGCEP ..................................................................... 9 2.8. Report Structure ...................................................................................................... 10 2.9. IGCEP Development Team ..................................................................................... 11 3. Power System of Pakistan: Existing Scenario .................................................... 12 3.1. Power Sector and Country’s Economy .................................................................... 12 3.2. Power Market Statistics ........................................................................................... 13 3.3. Existing Power System ............................................................................................ 15 4. Methodology Customized for the IGCEP ............................................................. 18 4.1 Regulatory Compliance ........................................................................................... 18 4.2 Data Currency Log .................................................................................................. 18 4.3 Data Collection Process .......................................................................................... 19 4.3.1 IGCEP Data Sources and Associated Data Types .................................................. 19 4.4 Economic and Financial Parameters ....................................................................... 20 4.5 IGCEP Process Map ............................................................................................... 21 4.6 Different Criteria and Other Important Considerations for the IGCEP ...................... 21 4.6.1 Planning Timeframe ................................................................................................ 21 4.6.2 Economic Parameters ............................................................................................. 21 4.6.3 Generation System Reliability ................................................................................. 21 4.6.4 Hydrological Risk .................................................................................................... 22 4.6.5 Renewable Energy (RE) Generation ....................................................................... 22 ii 4.6.6 Spinning Reserve .................................................................................................... 22 4.6.7 Scheduled Maintenance of the Generation Projects ................................................ 22 4.6.8 System Load Characteristics ................................................................................... 22 4.7 Strategy for Feedback ............................................................................................. 23 5 Long-term Energy and Demand Forecast ............................................................ 24 5.1. Forecasting Methodology ........................................................................................ 24 5.2. Input Data ................................................................................................................ 25 5.3. Preparation of Demand Forecast ............................................................................. 25 5.4. Demand Forecast Numbers ..................................................................................... 27 6. Inside the IGCEP – the Plan .................................................................................. 31 6.1. Introduction ............................................................................................................. 31 6.2. Strategic Considerations ......................................................................................... 31 6.3. Approach and Methodology ..................................................................................... 31 6.4. Planning Basis ......................................................................................................... 31 6.5. Assumption Set ....................................................................................................... 32 6.6. Existing Units ........................................................................................................... 34 6.7. Retirement of Existing Plants ................................................................................... 34 6.8. Committed Generating Units ................................................................................... 38 6.8.1. Public Sector Committed Projects ........................................................................... 38 6.8.2. Private Sector Committed Projects .......................................................................... 38 6.9. New Generation Options ......................................................................................... 41 6.10. Hydro Projects and Screening ................................................................................. 41 6.11. New Thermal Options .............................................................................................. 43 6.12. Other Generation Options........................................................................................ 45 6.13. Development of the Base Case ............................................................................... 45 6.14. Reliability Levels and System Expansion Costs ....................................................... 45 6.15 Brief Info on Relevant Application Software Tools ................................................... 46 6.16. Limitations of the Modelling Tool - WASP ................................................................ 47 6.17. Do-ables for the Future Generation Plans ............................................................... 48 7. IGCEP Study Outcome .......................................................................................... 49 7.1. Future Demand and Capacity Additions .................................................................. 49 7.2. Annual Capacity Factors ......................................................................................... 67 7.3. Annual Energy Generation ...................................................................................... 71 7.4. Year-wise Discounted and Un-Discounted Prices .................................................... 74 7.5. Salient Features of the IGCEP ................................................................................ 76 8. The Way Forward................................................................................................... 87 A n n e x u r e s .................................................................................................. 90 iii Annexure A – Load Forecast ............................................................................................ 91 Annexure A-1: Projected GDP Growth by Sector (Country) – Low ...................................... 91 Annexure A-2: Projected GDP Growth by Sector (Country) – Normal ................................. 92 Annexure A-3: Projected GDP Growth by Sector (Country) - High ...................................... 93 Annexure A-4: GDP (Factor Cost) Constant 2005-06, Consumer Price Index ..................... 94 Annexure A-5: Nominal Category-Wise Average Tariff of NTDC and KE System ................ 96 Annexure A-6: Real Price of Average Tariff of NTDC and KE, Base year 2005-06 .............. 98 Annexure A-7: Country (Real Price) Weighted

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    164 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us