CM to INAUGURATE GRADE SEPARATOR at DABOLIM AIRPORT TOMORROW Panaji : May 25, 2020 Jyaistha 4, 1942 Goa State Infrastructure

CM to INAUGURATE GRADE SEPARATOR at DABOLIM AIRPORT TOMORROW Panaji : May 25, 2020 Jyaistha 4, 1942 Goa State Infrastructure

CM TO INAUGURATE GRADE SEPARATOR AT DABOLIM AIRPORT TOMORROW Panaji : May 25, 2020 Jyaistha 4, 1942 Goa State Infrastructure Development Corporation Limited (GSIDC) has completed the prestigious work of “Grade Separator at Dabolim Airport which will be inaugurated and opened for public use on Tuesday, May 26, 2020 at 10:00 am at the hands of Chief Minister, Dr. Pramod Sawant, in the distinguished presence of Minister for Transport, Shri.Mauvin H. Godinho, Minister for Social welfare, Shri. Milind Sagun Naik, Minister for Public Works Department, Shri. Deepak Prabhu Pauskar, MLA of Cortalim, Smt. Alina Saldanha, MLA of Vasco-Da- Gama, Shri. Jose Luis Carlos Almeida, Vice Chairman, GSIDC & MLA of Mapusa,Shri. Joshua Peter De Souza, Chief Secretary, Shri. Parimal Rai, IAS, Airport Director, Goa International Airport, Shri. Gagan Malik, and other dignitaries. GSIDC, under the visionary guidance and dynamic leadership of the Chief Minister, Dr. Pramod Sawant, is leading the way in building quality infrastructure for the State of Goa. The newly constructed Grade Separator consists of two U-shaped Flyovers one towards Verna and the other towards Vasco side of the Goa International Airport at Dabolim. This was the need of the hour considering the massive traffic movement from all sides of Goa, on the roads leading to Dabolim airport, especially during peak hours of the flight movement, eventually resulting into traffic congestion near the airport. These two newly constructed flyovers along with the slip roads will facilitate smooth traffic movement towards and away from the airport and will avoid traffic congestion near the airport. Total length of the flyover towards Verna is 686.74 m, including two approach roads from two ends of this flyover. Total length of the flyover towards Vasco is 579.34 m, including two approach roads from two ends of this flyover. In addition to the two flyovers, two slip roads of 7.5m carriageway width has been constructed towards Verna and one slip road of 7.5m carriageway width has been constructed towards Vasco which will carry dedicated traffic in and out of the airport. Total cost of the project is Rs.41,79,69,000.00. Currently, GSIDC is in the process of building Roads, Bridges, Hospitals, Libraries, Stadiums, Jetties, Bus Stands, Ravindra Bhavans, Swimming Pools, Market Complexes, holistic development of cities, etc. DI/NB/JA/PP/SSP/2020/32 -- DIRECTORATE OF INFORMATION AND PUBLICITY. THIRD FLOOR,UDYOG BHAVAN, NEAR AZAD MAIDAN, PANAJI GOA.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us