NETMATRIX CROP CARE LIMITED (Formerly Known As Netmatrix Limited)

NETMATRIX CROP CARE LIMITED (Formerly Known As Netmatrix Limited)

<p><strong>FOR </strong></p><p><strong>PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF </strong><br><strong>PESTICIDES TECHNICAL - Category: 5(b) </strong></p><p><strong>at </strong></p><p><strong>NETMATRIX CROP CARE LIMITED </strong><br><strong>(Formerly known as NetMatrix Limited) </strong></p><p><strong>Located at: </strong></p><p><strong>Plot No. C1-76/523,77/524,78/525, 65/551,66/550, 100 shed area, GIDC Notified Industrial Area, Vapi, Dist- Valsad (Gujarat). </strong></p><p><strong>APPENDIX I </strong><br><strong>FORM 1 </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>(I) </strong></li><li style="flex:1"><strong>BASIC INFORMATION </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Item </strong></li><li style="flex:1"><strong>Sr. </strong></li></ul><p><strong>No. </strong></p><p>1. </p><p><strong>Details </strong></p><p></p><ul style="display: flex;"><li style="flex:1">Name of the Project </li><li style="flex:1">:</li></ul><p>:</p><p><strong>NetMatrix Crop Care Limited (Formerly known as NetMatrix Limited) </strong>Industrial Project, <strong>category -5(b) </strong>of EIA </p><p>notification </p><p>2. 3. <br>Sr. No. in the Schedule Proposed capacity / area /length /tonnage to&nbsp;: </p><p></p><p>Existing Capacity: 93.3 TPM </p><ul style="display: flex;"><li style="flex:1">be </li><li style="flex:1">handled/ command area /lease </li></ul><p>Proposed expansion capacity: 746.7 TPM Total after expansion: 840 TPM area/number of wells to be drilled </p><p></p><p>Total plot area is 4225 m<sup style="top: -0.42em;">2 </sup>(Existing plot). No wells to be drilled. Water requirement will be met from GIDC Water supply. <br>4. 5. 6. 7. <br>New / Expansion/Modernization Existing Capacity / Area etc. <br>::::<br>Expansion project 93.3 MT/Month </p><p>Category of project “A” </p><p>No </p><p>Category of Project i.e. ‘A’ or ‘B’ </p><p>Dose it attract the general condition? If yes, please specify. </p><p>8. </p><p>9. </p><ul style="display: flex;"><li style="flex:1">:</li><li style="flex:1">No. </li></ul><p>Dose it attract the specific condition? If yes, </p><p>please specify. </p><p></p><ul style="display: flex;"><li style="flex:1">Location </li><li style="flex:1">:</li></ul><p>:</p><p><strong>NetMatrix Crop Care Limited </strong></p><p></p><ul style="display: flex;"><li style="flex:1">Plot /Survey /khasra No. </li><li style="flex:1">Plot No. C1-76/523,77/524,78/525, </li></ul><p>65/551,66/550 GIDC, Vapi -396195 Vapi <br>Village Taluka District State <br>::::<br>Valsad Gujarat <br>10. Nearest&nbsp;railway station/airport along with :&nbsp;Railway Station Vapi&nbsp;– 4 km distance in kms. <br>11. Nearest&nbsp;Town, City, District Headquarters :&nbsp;Vapi- 4 kms along with distance in kms. <br>12. Village&nbsp;Panchayats, Zilla Parishad, Municipal&nbsp;: Gujarat&nbsp;Iindustrial Development Corporation Ltd. corporation, Local body (complete postal addresses with telephone nos. to be given) <br>13. Name&nbsp;of the applicant <br>Notified Industrial Estate Char Rasta, Vapi-396195 </p><p><strong>NetMatrix Crop Care Limited </strong></p><p>:</p><ul style="display: flex;"><li style="flex:1">:</li><li style="flex:1">14. Registered&nbsp;Address </li></ul><p></p><p><strong>NetMatrix Crop Care Limited </strong></p><p>Flat No. 101, Madhavi Enclave, Motinagar ‘X’ </p><p>Roads, Hyderabad- 500018 </p><p>NetMatrix Crop Care Ltd. </p><p>Page <strong>2 </strong>of <strong>14 </strong></p><p>15. Address&nbsp;for correspondence </p><p><strong>NetMatrix Crop Care Limited </strong></p><p>Plot.No.C1-76/523,77/524,78/525, 65/551,66/550, 100 shed area, GIDC Vapi, Di: Valsad, Gujarat 396195 </p><ul style="display: flex;"><li style="flex:1">Name </li><li style="flex:1">:</li></ul><p>::</p><p><strong>Mr. Subhash Chandra Das </strong></p><p>Designation (Owner/Partner / CEO) Address </p><p><strong>Assist. General Manager </strong></p><p>Plot.No.C1-76/523,77/524,78/525, 65/551,66/550, 100 shed area, GIDC Vapi, Di: Valsad, Gujarat 396195 <br>Pin Code E-mail <br>::::<br>396195 </p><p><a href="mailto:[email protected]" target="_blank">[email protected] </a></p><p>+91-260-2450790, Mobile No. +919974035831 +91-260-2450790 <br>Telephone No. Fax No. <br>16. Details&nbsp;of Alternative Sites examined , if any&nbsp;: <br>Location of these sits should be shown on a toposheet <br>As the proposed expansion activity will be carried out in the GIDC notified area, there are no alternative sites examined. </p><p></p><ul style="display: flex;"><li style="flex:1">17. Interlined&nbsp;Projects. </li><li style="flex:1">:</li></ul><p>–No- </p><p>18. Whether&nbsp;separate application of interlined : project has been submitted <br>–No- </p><ul style="display: flex;"><li style="flex:1">19. If&nbsp;yes, data of submission </li><li style="flex:1">:</li></ul><p>–No- </p><p></p><ul style="display: flex;"><li style="flex:1">20. If&nbsp;no. reason </li><li style="flex:1">:</li></ul><p>Proposed expansion project is carried out within </p><p>the premises. </p><p>21. Whether&nbsp;the proposal involves approval/ : clearance under: <br>–No- <br>(a) The&nbsp;Forest (Conservation) Act , 1980 (b) The&nbsp;Wildlife (protection) Act, 1972 (c) The&nbsp;C.R.Z. Notification 1991 </p><ul style="display: flex;"><li style="flex:1">22. Whether there </li><li style="flex:1">is any </li><li style="flex:1">Government : </li></ul><p>–No- </p><p>Order/Policy relevant/relating to the site? </p><ul style="display: flex;"><li style="flex:1">23. Forest&nbsp;land involved (hectares) </li><li style="flex:1">:</li></ul><p>–No- </p><p>24. Whether&nbsp;there is any litigation pending against the project and / or land in which the project </p><ul style="display: flex;"><li style="flex:1">is propose to be set up </li><li style="flex:1">:</li></ul><p>:<br>–No- <br>(a) Name&nbsp;of the court </p><p>(b) Case&nbsp;No. (c) Orders&nbsp;/ directions of the court, if any and&nbsp;: </p><ul style="display: flex;"><li style="flex:1">its relevance with the proposed project. </li><li style="flex:1">:</li></ul><p></p><p>NetMatrix Crop Care Ltd. </p><p>Page <strong>3 </strong>of <strong>14 </strong></p><p><strong>(II) ACTIVITY </strong>1. <strong>Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) </strong></p><p><strong>Sr. Information/Checklist&nbsp;confirmation No. </strong><br><strong>Yes /&nbsp;Details thereof (with approximate </strong></p><ul style="display: flex;"><li style="flex:1"><strong>No </strong></li><li style="flex:1"><strong>quantities /rates, wherever possible) </strong></li></ul><p><strong>with source of information data </strong></p><p>1.1 Permanent&nbsp;or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">The company has existing plots for the </li></ul><p>proposed expansion project. Project site location and plant layout is attached as </p><p><strong>Annexure – 1 &amp; 2 </strong>of PFR. </p><p></p><ul style="display: flex;"><li style="flex:1">1.2 </li><li style="flex:1">Clearance of existing land, vegetation and </li></ul><p>buildings? </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">-- </li></ul><p>1.3 Creation&nbsp;of new land uses? 1.4 Pre-construction&nbsp;investigations e.g. bore houses, soil testing? <br>No No <br>-- -- </p><p></p><ul style="display: flex;"><li style="flex:1">1.5 Construction&nbsp;works? </li><li style="flex:1">yes </li></ul><p>No <br>Construction activity will be undertaken for the proposed project. </p><ul style="display: flex;"><li style="flex:1">1.6 Demolition&nbsp;works? </li><li style="flex:1">There </li><li style="flex:1">will </li><li style="flex:1">be </li><li style="flex:1">no </li><li style="flex:1">demolition, </li></ul><p>underground, reclamation or dredging work for proposed project. <br>1.7 Temporary&nbsp;sites used for construction works or housing of construction workers? <br>No No <br>Local workers will be hired during construction as well as operation phase. Construction of plant building, storage area, utility area etc. shall be carried out as per detailed design. Plan for </p><p>construction is attached as <strong>Annexure: 2 </strong></p><p>of Project Feasibility Report. <br>1.8 Above&nbsp;ground buildings, structures or earthworks including linear structures, cut and fill or excavations </p><p>1.9 Underground&nbsp;works including mining or tunneling? </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">Not Applicable </li></ul><p></p><ul style="display: flex;"><li style="flex:1">1.10 Reclamation&nbsp;works? </li><li style="flex:1">No </li></ul><p>No No Yes </p><p>Not Applicable </p><p>1.11 Dredging? </p><p>Not Applicable Not Applicable </p><p>List of Products and manufacturing </p><p>process attached as <strong>Annexure: 3 </strong>of </p><p>Project Feasibility Report. </p><p>1.12 Offshore&nbsp;structures? 1.13 Production&nbsp;and manufacturing processes? </p><p></p><ul style="display: flex;"><li style="flex:1">1.14 Facilities&nbsp;for storage of goods or materials? </li><li style="flex:1">Yes </li></ul><p>Yes <br>The raw materials will be stored in a raw material storage area and hazardous chemicals will be stored separately. <br>1.15 Facilities&nbsp;for treatment or disposal of solid waste or liquid effluents? </p><p></p><p>Domestic Effluent will be treated through septic tank/soak pit . </p><p>NetMatrix Crop Care Ltd. </p><p>Page <strong>4 </strong>of <strong>14 </strong></p><p></p><p>The effluent from industrial activity will be treated in ETP, solvent stripper &amp; spray dryer to achieve zero liquid discharge. Hazardous / non Hazardous solid waste will be disposed as per hazardous waste rules 2008. Organic residue &amp; methyl chloride gas will be treated in proposed incineration system. <br>1.16 Facilities&nbsp;for long term housing of operational workers? <br>No No No <br>Workers from the local/nearby areas will be employed. <br>1.17 New road, rail or sea traffic during construction or operation? <br>Not Applicable <br>1.18 New&nbsp;road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? <br>The proposed project will be located in Vapi GIDC area, which has a welldeveloped infrastructure, including road network &amp; connected with railway. </p><p>1.19 Closure&nbsp;or diversion of existing transport routes or infrastructure leading to changes in traffic movements? </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">Not Applicable </li></ul><p>1.20 New&nbsp;or diverted transmission lines or pipelines? <br>No No <br>Not Applicable </p><ul style="display: flex;"><li style="flex:1">Not Applicable </li><li style="flex:1">1.21 Impoundment, </li><li style="flex:1">damming, </li><li style="flex:1">culverting, </li></ul><p>realignment or other changes to the hydrology of&nbsp;watercourses or aquifers? </p><ul style="display: flex;"><li style="flex:1">1.22 Stream&nbsp;crossings? </li><li style="flex:1">No </li></ul><p>No <br>Not Applicable <br>1.23 Abstraction&nbsp;or transfers of water form ground or surface waters? <br>Water requirement will be met from GIDC Water supply. <br>1.24 Changes&nbsp;in water bodies or the land surface affecting drainage or run-off? </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">Not Applicable </li></ul><p>1.25 Transport of personnel or materials for construction, operation or decommissioning? </p><ul style="display: flex;"><li style="flex:1">Yes </li><li style="flex:1">We shall hire personnel from local / </li></ul><p>nearby area only and the construction material will be obtained preferably from local traders and will be transported via roads. The sources of raw materials and machinery for operation will vary based on market driven forces, which will be transported via roads. <br>1.26 Long-term&nbsp;dismantling or decommissioning or restoration works? <br>No No <br>Not Applicable <br>1.27 Ongoing activity during decommissioning which could have an impact on the <br>Not Applicable </p><p>NetMatrix Crop Care Ltd. </p><p>Page <strong>5 </strong>of <strong>14 </strong></p><p>environment? <br>1.28 Influx of people to an area in either temporarily or permanently? <br>No </p><p>This is a well-developed Industrial Area and due to project, 80 people shall be employed for operation. Not Applicable </p><p></p><ul style="display: flex;"><li style="flex:1">1.29 Introduction&nbsp;of alien species? </li><li style="flex:1">No </li></ul><p></p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">1.30 Loss&nbsp;of native species or genetic diversity? </li></ul><p></p><p>Not Applicable Not Applicable </p><p></p><ul style="display: flex;"><li style="flex:1">1.31 Any&nbsp;other actions? </li><li style="flex:1">No </li></ul><p></p><p><strong>2. Use&nbsp;of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Sr. Information/Checklist </strong></li><li style="flex:1"><strong>Yes /&nbsp;Details thereof (with approximate quantities </strong></li></ul><p></p><ul style="display: flex;"><li style="flex:1"><strong>No. confirmation </strong></li><li style="flex:1"><strong>No </strong></li><li style="flex:1"><strong>/rates, wherever possible) with source of </strong></li></ul><p><strong>information data </strong></p><p>2.1 2.2 <br>Land especially undeveloped or agricultural land (ha) </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">The proposed expansion project will be </li></ul><p>accommodated in the existing plot belongs to notified industrial estate. </p><p> Water requirement will meet through the <br>GIDC Water Supply line, Vapi. </p><p>Water (expected source competing users) unit: KL/D </p><ul style="display: flex;"><li style="flex:1">&amp;</li><li style="flex:1">Yes </li></ul><p></p><p>. Construction Phase : 5 – 10 KLD . Operation Phase : 145.21 KLD (total after proposed expansion) </p><p>For water balance refer <strong>section 3(viii) </strong>and water permission, refer <strong>Annexure </strong>– <strong>4 </strong>of Project </p><p>Feasibility Report. </p><p>2.3 2.4 </p><ul style="display: flex;"><li style="flex:1">Minerals (MT) </li><li style="flex:1">No </li><li style="flex:1">Not Applicable </li></ul><p>Construction material – stone, aggregates, sand / soil (expected source – MT) <br>Yes </p><p>Company shall purchase Sand, stone, Cement and Structural Steel from local traders as per expansion project required. </p><p>2.5 2.6 <br>Forests and timber (source – MT) Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">Not Applicable </li></ul><p>Yes </p><p> Power : Dakshin Gujarat Vij Co. Ltd./ <br>Captive generation from Steam &amp; gas <br> Power required : 1000 KVA (total after proposed expansion) <br> Fuel : (total after proposed expansion) <br>. Imported Coal for steam boiler-I, Hot air generator, Thermic fluid heater : 1478 kgs/hr <br>. Natural gas for steam boiler – II : 400 <br>SCM/Hr <br>. FO/LDO for incinerator: 200 kgs/hr . HSD for D G set: 180 lits/hr </p><p></p><ul style="display: flex;"><li style="flex:1">Not Applicable </li><li style="flex:1">2.7 </li><li style="flex:1">Any other natural resources (use </li></ul><p>appropriate standard units) <br>No </p><p>NetMatrix Crop Care Ltd. </p><p>Page <strong>6 </strong>of <strong>14 </strong></p><p><strong>3. Use,&nbsp;storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about&nbsp;actual or perceived risks to human health. </strong></p><p><strong>Sr. Information/Checklist&nbsp;confirmation No. </strong><br><strong>Yes / Details&nbsp;thereof (with approximate </strong></p><ul style="display: flex;"><li style="flex:1"><strong>No </strong></li><li style="flex:1"><strong>quantities / rates, wherever possible) with </strong></li></ul><p><strong>source of information data </strong></p><p></p><ul style="display: flex;"><li style="flex:1">3.1 </li><li style="flex:1">Use of substances or materials, which are </li></ul><p>hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) <br>Yes </p><p>Due care shall take during handling of materials which may be harmful and covered under MSIHC rules. Please </p><p>Refer Project Pre-Feasibility Report </p><p>Not applicable as site is located in Vapi Industrial Area. </p><p>3.2 3.3 <br>Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) <br>No </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">Affect the welfare of people e.g. by changing </li></ul><p>living conditions? <br>The project site is located in a notified industrial zone which is surrounded by cluster of industries, thus there will be no change in the living conditions of the people in the nearby vicinity. <br>3.4 </p><p>3.5 <br>Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., <br>No No <br>Not applicable as site is located in Vapi Industrial Area. </p><p></p><ul style="display: flex;"><li style="flex:1">Any other causes </li><li style="flex:1">-- </li></ul><p></p><p><strong>4. Production of solid wastes during construction or operation or decommissioning (MT/month) </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Sr. </strong></li><li style="flex:1"><strong>Information/Checklist confirmation </strong></li><li style="flex:1"><strong>Yes /&nbsp;Details </strong></li><li style="flex:1"><strong>thereof </strong></li><li style="flex:1"><strong>(with </strong></li><li style="flex:1"><strong>approximate </strong></li></ul><p></p><ul style="display: flex;"><li style="flex:1"><strong>No. </strong></li><li style="flex:1"><strong>No </strong></li><li style="flex:1"><strong>quantities / rates, wherever possible) with </strong></li></ul><p><strong>source of information data </strong></p><p>4.1 4.2 </p><ul style="display: flex;"><li style="flex:1">Spoil, overburden or mine wastes </li><li style="flex:1">No </li><li style="flex:1">-- </li></ul><p></p><ul style="display: flex;"><li style="flex:1">Municipal waste (domestic and or </li><li style="flex:1">Yes </li></ul><p>Yes <br> The domestic waste will be disposed as per prevalent practice in GIDC. <br> The commercial waste generated from administration building will be sold to scrap vendors. </p><ul style="display: flex;"><li style="flex:1">commercial </li><li style="flex:1">wastes) </li></ul><p></p><ul style="display: flex;"><li style="flex:1">4.3 </li><li style="flex:1">Hazardous wastes (as per Hazardous Waste </li></ul><p>Management Rules) </p><p>Please refer <strong>section 6(vii) </strong>for haz, waste </p><p>detail and TSDF membership refer <strong>Annexure: 6 </strong>of Project Feasibility Report. </p><p>Please refer <strong>section 6(vii) </strong>of Project </p><p>Feasibility Report for haz. waste detail. Hydro Chloric Acid (30%) - 288.59 TPM (total after proposed expansion) <br>4.4 4.5 <br>Other industrial process wastes Surplus product <br>Yes Yes </p><p>NetMatrix Crop Care Ltd. </p><p>Page <strong>7 </strong>of <strong>14 </strong></p><p>4.6 4.7 <br>Sewage sludge or other sludge from effluent treatment <br>Yes Yes No </p><p>Please refer <strong>section 6(vii) </strong>of Project </p><p>Feasibility Report for haz. waste detail. Construction waste shall be utilized for leveling in the premises. <br>Construction or demolition wastes <br>4.8 4.9 <br>Redundant machinery or equipment Contaminated soils or other materials <br>Not applicable <br>No No <br>Not applicable </p><ul style="display: flex;"><li style="flex:1">Not applicable </li><li style="flex:1">4.10 Agricultural&nbsp;wastes </li></ul><p></p><ul style="display: flex;"><li style="flex:1">4.11 Other&nbsp;solid wastes </li><li style="flex:1">No </li></ul><p></p><p>Please refer <strong>section 6(vii) </strong>of Project </p><p>Feasibility Report for haz. waste detail. </p><p><strong>5. Release&nbsp;of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Sr. Information/Checklist&nbsp;confirmation No. </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Yes /&nbsp;Details </strong></li><li style="flex:1"><strong>thereof </strong></li><li style="flex:1"><strong>(with </strong></li><li style="flex:1"><strong>approximate </strong></li></ul><p></p><ul style="display: flex;"><li style="flex:1"><strong>No </strong></li><li style="flex:1"><strong>quantities / rates, wherever possible) with </strong></li></ul><p><strong>source of information data </strong></p><p>5.1 5.2 5.3 <br>Emissions from combustion of fossil fuels&nbsp;Yes Please&nbsp;Refer Project Pre-Feasibility Report from stationary or mobile sources Emissions from production processes </p><p><strong>Annexure- 10 </strong></p><p>Yes Please&nbsp;Refer Project Pre-Feasibility Report </p><p><strong>Annexure- 10. </strong></p><p>Emissions from materials handling including&nbsp;No storage or transport <br> All liquid raw materials shall be procured in bulk tankers and shall be transferred through a closed circuit pipe lines by pumps. Thus no generation of emissions from material handling including storage or transport. <br>5.4 </p><p>5.5 <br>Emissions from construction activities No Utmost&nbsp;care will be taken during </p><ul style="display: flex;"><li style="flex:1">including plant and equipment </li><li style="flex:1">construction activity and water sprinklers </li></ul><p>shall be utilized whenever necessary. <br>Dust or odors from handling of materials&nbsp;Yes All&nbsp;the waste shall be stored in designated places and shall be transported to TSDF in their own approved closed vehicles. including construction materials, sewage and waste <br>5.6 </p><p>5.7 </p><ul style="display: flex;"><li style="flex:1">Emissions from incineration of waste </li><li style="flex:1">Yes Incineration&nbsp;system shall be provided as </li></ul><p>per CPCB guidelines <br>Emissions from burning of waste in open air&nbsp;No No&nbsp;open burning of waste is carried out. (e.g. slash materials, construction debris) </p><ul style="display: flex;"><li style="flex:1">5.8 </li><li style="flex:1">Emissions from any other sources </li><li style="flex:1">No -- </li></ul><p></p><p>NetMatrix Crop Care Ltd. </p><p>Page <strong>8 </strong>of <strong>14 </strong></p><p><strong>6. Generation&nbsp;of Noise and Vibration, and Emissions of&nbsp;Light and Heat: </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Sr. Information/Checklist </strong></li><li style="flex:1"><strong>Yes /&nbsp;Details thereof (with approximate quantities / rates, </strong></li></ul><p><strong>No wherever&nbsp;possible) with source of information data </strong></p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us