Gansu Qingyang Urban Infrastructure Improvement Project (P123133)

Gansu Qingyang Urban Infrastructure Improvement Project (P123133)

Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) EAST ASIA AND PACIFIC | China | Transport & ICT Global Practice | IBRD/IDA | Specific Investment Loan | FY 2012 | Seq No: 7 | ARCHIVED on 01-Dec-2015 | ISR21419 | Implementing Agencies: QINGYANG PMO Key Dates Key Project Dates Bank Approval Date:31-May-2012 Effectiveness Date:24-Sep-2012 Planned Mid Term Review Date:26-Jan-2015 Actual Mid-Term Review Date:26-Mar-2015 Original Closing Date:31-Dec-2017 Revised Closing Date:31-Dec-2017 Project Development Objectives Project Development Objective (from Project Appraisal Document) To assist Xifeng District to improve selected urban infrastructure services including urban roads and urban environmental services. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Component 1(a) Urban Infrastructure Improvement - Urban Bypass:(Cost $82.26 M) Component 1(b) Urban Infrastructure Improvements - Integrated Road Corridor:(Cost $11.53 M) Component 1(c) Urban Infrastructure Improvements - Drainage and Sewage:(Cost $37.28 M) Component 1(d) Urban Infrastructure Improvements - Wastewater Treatment Plant:(Cost $32.31 M) Component 2 Institutional Strengthening and Capacity Building:(Cost $3.30 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Unsatisfactory Unsatisfactory Overall Risk Rating Substantial Substantial 12/1/2015 Page 1 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) Implementation Status and Key Decisions Since the loan became effective in September 2012 progress in all components of the project has been very slow. Of the total 21 contracts, only one civil works contract has been completed; one goods contract completed; three civil works contracts are under construction; and three service contracts ongoing. It is expected that several contracts will be initiated soon which will support a pick up in project implementation progress. It has been decided to restructure the project to take account of the delays, slow disbursement and reducing some of the project risks. It is still expected that the project will achieve its PDO by the end of the extended closing date. 12/1/2015 Page 2 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Low Macroeconomic -- Low Moderate Sector Strategies and Policies -- Substantial Substantial Technical Design of Project or Program -- Substantial Substantial Institutional Capacity for Implementation and -- Substantial Substantial Sustainability Fiduciary -- Substantial Substantial Environment and Social -- Substantial Substantial Stakeholders -- Low Low Other -- -- -- Overall -- Substantial Substantial Results Project Development Objective Indicators PHINDPDOTBL Journey time saved for through traffic (freight) (Minutes, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 28.40 28.40 19.50 18.20 12/1/2015 Page 3 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDPDOTBL Share of through traffic (freight) on two corridors increased (East) (# of trucks over 24 hours and %) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 9.1 (0%) 9.1 (0%) 11.8 (30%) 22 (142%) Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDPDOTBL Share of through traffic (freight) on 2 corridors increased (West) (# of trucks over 24 hours and %) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 66.2 (0%) 66.2 (0%) 71.5 (8%) 72 (9%) Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDPDOTBL Service speed of buses during rush hour on Nan Bei Street Corridor (km/hr) (and % change) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 10.30 10.30 13.60 15.50 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDPDOTBL Built up area serviced by storm water/wastewater networks increased (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 50.60 50.60 59.20 92.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 12/1/2015 Page 4 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) PHINDPDOTBL Wastewater pollution reduction (BOD) (tons/year) (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1168.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDPDOTBL Wastewater pollution reduction (COD) (tons/year) (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2569.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDPDOTBL Wastewater pollution reduction (SS) (tons/year) (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2219.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 Overall Comments Intermediate Results Indicators PHINDIRITBL Road construction completed (by km) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.40 7.40 100.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2015 12/1/2015 Page 5 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) PHINDIRITBL Passenger ridership of buses during rush hour on Nan Bei Street corridor increased (and % change) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 5845.00 5845.00 9700.00 12000.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDIRITBL Bus stops reconstructed/upgraded (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 17.00 33.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2016 PHINDIRITBL Unsignalized zebras converted to signalized mid-block crossings on the 3 corridors (# of crossings) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 15.00 15.00 48.00 103.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2016 PHINDIRITBL Intersections with traffic channelized (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 12.00 12.00 19.00 27.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2016 12/1/2015 Page 6 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) PHINDIRITBL % of users expressing positive opinion on services (from user satisfaction surveys) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 27.00 27.00 53.00 65.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDIRITBL New drainage/sewage pipe construction completed (km, % cumulative) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 41.00 100.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDIRITBL Drainage/sewage pipe reconstruction completed (km, cumulative %) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDIRITBL Wastewater treatment plant investment completed (US$, cumulative %) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 12/1/2015 Page 7 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) PHINDIRITBL Associated construction of pipes completed (km, cumulative %) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDIRITBL Studies completed (cumulative number) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 1.00 5.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDIRITBL Staff trained (cumulative number) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 45.00 81.00 110.00 Date 30-Apr-2012 15-Jun-2015 26-Nov-2015 31-Dec-2017 PHINDIRITBL Average annual number of fatalities and severely injusred in project corridors over a three-year period (relative to base year) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 14.00 -- 6.00 9.00 Date 30-Apr-2012 -- 26-Nov-2015 31-Dec-2017 Overall Comments Values enteres are the revised values reported by the PMO on November 26, 2015. M&E reporting is still not robust and the Team will continue the dialogue with the PMO aiming at securing more reliable values. 12/1/2015 Page 8 of 10 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report China: Gansu Qingyang Urban Infrastructure Improvement Project (P123133) Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P123133 IBRD-81700 Effective USD 100.00 100.00 0.00 11.53 88.47 12% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us