Developing and Upgrading of the East-Mediterranean Motorways of the Sea (Italy-Greece Mos Link)

Developing and Upgrading of the East-Mediterranean Motorways of the Sea (Italy-Greece Mos Link)

MoS Forum Brussels – 5/7/2018 Developing and upgrading of the East-Mediterranean Motorways of the Sea (Italy-Greece MoS link) Antonio REVEDIN Strategic Planning and Development Director North Adriatic Sea Port Authority Mobility and Transport MARGHERA CARGO PORT MARITTIMA PASSENGERS PORT FUSINA RO-RO/RO-PAX PORT PORT OF VENICE PORT OF CHIOGGIA MoS Forum Brussels – 5/7/2018 Port of Venice’s freight origins/destinations ............................ FAR EAST 13,4% CENTRE-NORTH MEDITERRANEAN BLACK SEA SOUTH AMERICA 47,0% 15,0% AMERICA 4,7% 5,9% NORTHERN EUROPE MIDDLE 3,1% AFRICA EAST 5,4% 3,1% INDIAN SUB CONT. Mobility and Transport 2,4% MoS Forum Brussels – 5/7/2018 Ro-Ro / Ro-Pax services JUNE 2014, Anek Lines Ro-Pax service Venice-Igoumenitsa-Patras 2016 / 2017 JUNE 2015, Grimaldi Lines From 48.319 to 69.205 units Ro-Ro service Venice-Bari-Patras +43,2% JANUARY 2017, Minoan Lines Ro-Pax service Venice-Ancona-Igoumenitsa-Patras MAY 2017, Neptune lines Car carrier service Venice-Piraeus-Turkey Mobility and Transport MoS Forum Brussels – 5/7/2018 The Motorways of the Sea Terminal (Fusina) 2 Basins / 4 berths for Ro-Ro/Ro-Pax vessels Operational since June 2014 36 hectares of Logistics Platform Dedicated rail yard with 4 tracks for trains (up to 650 m long) Fast Motorways and railways connection Public-Private investment (€ 140 million in PPP DPFO) • € 10,7 million of TEN-T programme (ADRIAMOS project) • € 2,5 million of CEF programme (MoS Venice-Patras) • € 24 million of National budget Mobility and Transport MoS Forum Brussels – 5/7/2018 A link between Central Europe and Greece November 2015 Weekly rail service between Venice and Frankfurt (via Brenner) serving in 3 days to Germany cargo coming by sea from Greece, and viceversa. Further intermodal connections Car shuttle train to Verona and further connections along the Scan-MED Corridor. Mobility and Transport MoS Forum Brussels – 5/7/2018 Adriatic Motorways of the Sea (ADRIAMOS project) Objective: Improve MOS link Venice-Igoumenitsa/Patras • Construction of new MoS Terminal (port of Venice) • Design of new Freight Village (port of Igoumenitsa) • ANEK lines supported the Action Total Budget: 56.700.000 € TEN-T financing: 11.410.000 € Duration: 2011– 2014 Mobility and Transport MoS Forum Brussels – 5/7/2018 Developing and upgrading of the Italy-Greece MoS link Action 2016-EU-TM-0342-M Partnership: North Adriatic Sea Port Authority Ferry (Coordinator), Patras Port Authority, Venice Ro-Port MoS. Supporting partner: Grimaldi lines CORE port Duration: 2017 – 2020 Total Budget: 10,046,667 € (CEF financing: 2,831,300 €) GOAL: Improving the maritime based link between the TEN-T core ports of Venice and Patras. Full integration in the Core Network • BAC and MED Corridors • Orient-East Med Corridor Mobility and Transport MoS Forum Brussels – 5/7/2018 Completion of the new MoS Terminal in the port of Venice Sub-activity 1.1 Dredging of south basin portion (December 2017 – December 2018) Sub-activity 1.2 Terminal outdoor video surveillance system (January 2018 – June 2019) Mobility and Transport MoS Forum Brussels – 5/7/2018 Increasing operational capacity and efficiency in the port of Patras Sub-activity 2.1 Functional restructuring of the South Port (November 2017 – April 2019) Sub-activity 2.2 Construction-Positioning of mooring buoy to increase operational capacity (January 2018 – December 2019) Mobility and Transport MoS Forum Brussels – 5/7/2018 ADRIATIC-IONIAN TRANSPORT CORRIDOR (EUSAIR) • Enhancing MoS services across the Adriatic-Ionian area (“Connecting the Region”) • Relevant “infrastructure element” of EU transport system Connecting South-East European regions with Central Europe Countries Mobility and Transport MoS Forum Brussels – 5/7/2018 Thank you for your attention Mobility and Transport.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us