
SULLIVAN COUNTY Notable Unfunded Transportation Infrastructure Projects Totaling $98.6 million Via Tennessee Department of Transportation 1 2 3 4 5 1. I-81 - Eastbound Truck Climbing Lane at Mile Marker 60: $27.2 million 2. I-81 - ITS expansion along I-81 between I-26 (Exit 57) interchange and Virginia state line (Mile Marker 75): $1.7 million 3. SR-126 - Memorial Drive Boulevard: $48.6 million 4. SR-36 - Ft. Henry Drive Bridge over South Holston River: $8.5 million 5. SR-93 - South of Horse Creek to North of Derby Drive (TPR Option 5, Spot I): $6.3 million www.tcoftn.org WASHINGTON COUNTY Notable Unfunded Transportation Infrastructure Projects Totaling $21.9 million Via Tennessee Department of Transportation 1 2 3 4 1. I-26 - Interchange at SR-354 (Interchange Modification): $12.3 million 2. I-26 - Interchange at SR-67 (US 321) (Construct Auxiliary Lane, Widen Eastbound I-26 Travel Lane, etc.): $2.6 million 3. SR-381 - North State of Franklin Road Bridge over Southern Railway: $3.1 million 4. SR-93 - North of Davis Road to North of Fire Hall Road (TPR Option 5, Spot): $3.4 million www.tcoftn.org Tennessee Transportation Infrastructure Needs by County Tennessee Advisory Commission on Intergovernmental Relations Report, 2014 Claiborne Davidson $0-100 Million $101-200 Million $201-300 Million $301-400 Million $401-500 Million $501-600 Million* $701-800 Million* $901-999 Million $1 Billion+ *According to the Tennessee Advisory Commission on Intergovernmental Relations (TACIR) 2014 report on infrastructure needs, no counties expressed transportation needs within the ranges of $601-700 million and $801-900 million. For the purpose of the map above, those ranges have not been included in the key. Anderson: $49.9 million Fentress: $164.3 million Lauderdale: $434.7 million Roane: $92.5 million Bedford: $77.3 million Franklin: $7.5 million Lawrence: $81.8 million Robertson: $202.1 million Benton: $62.4 million Gibson: $114.7 million Lewis: $61.4 million Rutherford: $423.3 million Bledsoe: $18.7 million Giles: $19.7 million Lincoln: $3.5 million Scott: $102.1 million Blount: $467.7 million Grainger: $121.4 million Loudon: $138.2 million Sequatchie: $20.5 million Bradley: $306.1 million Greene: $303.2 million Macon: $114.5 million Sevier: $310.1 million Campbell: $132.5 million Grundy: $9.1 million Madison: $388 million Shelby: $3.5 billion Cannon: $121.5 million Hamblen: $259.2 million Marion: $154.3 million Smith: $95.2 million Carroll: $78 million Hamilton: $1.1 billion Marshall: $70.1 million Stewart: $31.4 million Carter: $52.6 million Hancock: $27.6 million Maury: $91.2 million Sullivan: $240.7 million Cheatham: $162.9 million Hardeman: $206.3 million McMinn: $325.3 million Sumner: $295.5 million Chester: $14.2 million Hardin: $171.6 million McNairy: $86 million Tipton: $426.4 million Claiborne: $81.1 million Hawkins: $166.7 million Meigs: $114.4 million Trousdale: $98.4 million Clay: $104.8 million Haywood: $204.8 million Monroe: $66.6 million Unicoi: $28.2 million Cocke: $276.9 million Henderson: $225.8 million Montgomery: $287.9 million Union: $119.2 million Coffee: $108.2 million Henry: $59 million Moore: NO DATA Van Buren: $98.9 million Crockett: $4.3 million Hickman: $152.3 million Morgan: $192.7 million Warren: $104 million Cumberland: $436.1 million Houston: $61.6 million Obion: $376.4 million Washington: $521.2 million Davidson: $1.3 billion Humphreys: $127.5 million Overton: $132.1 million Wayne: $44 million Decatur: $13.0 million Jackson: $101.8 million Perry: $173.6 million Weakley: $3.8 million DeKalb: $236.6 million Jefferson: $212.4 million Pickett: $16.7 million White: $135.7 million Dickson: $148.6 million Johnson: $82.8 million Polk: $207.9 million Williamson: $977.7 million Dyer: $237.2 million Knox: $710.7 million Putnam: $137.6 million Wilson: $575.2 million Fayette: $265.6 million Lake: $61.5 million Rhea: $40.1 million Committed but Unfunded Projects at TDOT $7.6 Billion Route Project Description Phase Estimate Shelby County Projects $ 1,023,618,511 I-240 Replacement of 3 Overhead Bridges; Norfolk Southern RR (LM 15 45), Poplar Construction $20,000,000 Av (SR-57 EB LM 15 57), and Poplar Av (SR-57 WB LM 15 73) I-240: I-55 to Midtown, Memphis 6 Miles Total of $50 million I-240 I-40 to I-55 (Poss. I-69 Funds) Construction $50,000,000 I-240: Airways Interchange Total of $43 million I-240 Interchange at Airways Blvd Construction $42,000,000 I-240 Interchange at Airways Blvd Right-of-Way $1,000,000 I-269 Implement Smartway ITS system on SR 385/I-269 from I-40 southward to the (SR- Mississippi state line and connect it to the Mississippi ITS system. The $9,000,000 385) implementation of the Smartway ITS system will include the installation of fiber, CCTV cameras, DMS, and HAR. I-40: SR-177 (Germantown Road, to SR-205, Collierville-Arlington Road) 8.5 Miles Total of $65.1 million I-40 SR-177(Germantown Road) to 1.0 mile East of Canada Road Construction $36,000,000 I-40 1.0 mile East of Canada Road to SR-205 (Collierville- Arlington Road) Construction $29,100,000 I-69: Shelby County Portion 9.8 Miles Total of more than $1 billion I-69 0.8 mile east of US-51 to 0.5 mile south of SR-388 Construction $80,000,000 I-69 0.5 mile north of Woodstock-Cuba Road to 0.2 mile east of US-51 Construction $75,000,000 I-69 South of Fite Road to 0.5 miles north of Woodstock-Cuba Road Construction $37,600,000 I-69 South of SR-388(North Watkins Street) to south of Fite Road Construction $35,700,000 I-69 0.8 mile east of US-51 to 0.5 mile south of SR-388 Right-of-Way $31,200,000 I-69 0.5 mile north of Woodstock-Cuba Road to 0.2 mile east of US-51 Right-of-Way $28,715,000 I-69 South of Fite Road to 0.5 miles north of Woodstock-Cuba Road Right-of-Way $14,260,000 I-69 South of SR-388(North Watkins Street) to south of Fite Road Right-of-Way $12,000,000 SR- 385 Extend the current Smartway ITS system eastward on SR 385 from MM 7 to approximately MM 15 at the junction of future I-269. The Smartway ITS system $4,000,000 extension will include the installation of fiber, CCTV cameras, DMS, and HAR. SR-1: US-70/US-79 (Summer Avenue, From I-40 to North of Elmore Road) Total of $62.3 million SR-1 Summer Avenue, from 0.1 mile north of Sycamore View Road to 0.1 mile North Construction $35,400,000 of Elmore Road SR-1 Summer Avenue, From I-40 to 0.1 Mile North of Sycamore View Road Construction $26,900,000 SR-1 US-70/79 bridge over Loosahatchie River $9,893,000 SR-1 Summer Ave. bridge over SR1/0K371, 05250 & RR $3,498,000 SR-14: Austin Peay Highway (from Old Covington Pike to Tipton County 12.5 miles Total of $75.4 million line) SR-14 East of Old Covington Pike to SR-385 (Paul Barrett Pkwy) Construction $35,400,000 SR-14 Jackson Ave. bridge over SR014 / 02800 & 0K274 $20,070,000 SR-14 East of Kerrville-Rosemark Road to Tipton County Line Construction $20,000,000 SR-14 SR-385 (Paul Barrett Pkwy) to east of Kerrville-Rosemark Road Construction $20,000,000 SR-14 S. Third St. bridge over IC RR & concrete ditch $13,498,511 SR-14 S. Third St. bridge over IC RR & Nonconnah Creek $6,950,000 SR-14 Austin Peay Hwy. bridge over Loosahatchie River $6,600,000 SR-176 New Getwell Rd. bridge over Noncoonah Creek $3,505,000 SR-176 New Getwell Rd. bridge over I-240 & ramps $1,027,000 SR-177 Germantown Rd. bridge over Wolf River $12,055,000 SR-204 Sgt. Walker K. Singleton bridge over Loosahatchie River $14,263,000 SR-23 Walnut Grove Rd. bridge over CSX & CNIC RR $23,859,000 Red: TDOT's $6.1 Billion Backlog List Blue: Additional Unfunded Projects White: Total Project Notation 1 SR-3: US-51 (Craft Road to Shelby Drive, parrallel to I-55) and bridge over 1.6 miles Total of $16.4 million Branch) SR-3 Craft Road to Shelby Drive (Elvis Presley Blvd) Construction $15,500,000 SR-3 Thomas St. bridge over Branch $922,000 SR-4: US-78 (Lamar Avenue, Mississippi state line to near I-240) 4.8 miles Total of $229.1 million SR-4 South of Shelby Drive to Raines/Perkins Road Interchange Right-of-Way $97,800,000 SR-4 Raines Road/Perkins Road Interchange to Getwell Road (SR-176) Right-of-Way $43,200,000 SR-4 Raines Road/Perkins Road Interchange to Getwell Road (SR-176) Construction $38,200,000 SR-4 South of Shelby Drive to Raines/Perkins Road Interchange Construction $27,500,000 SR-4 Mississippi State Line to South of Shelby Drive Construction $22,400,000 SR-4 Lamar Ave. bridge over Noncoonah Creek $3,984,000 SR-57 Popar Ave. bridge over SR-23, CSX & CNIC RR $15,619,000 Polk County Projects $ 999,999,999 SR-40: US-64 (Ocoee River Gorge Bypass) Total of $999 million SR-40 Ocoee River Gorge Bypass Construction $999,999,999 Hamilton County Projects $ 415,357,785 1-124 North of I-24 to South of Tennessee River Bridge (Including the Olgati Bridge) Construction $25,000,000 additional lanes I-24: Widening of I-24 to 6 lanes from I-59 to US-27 Total of $217.8 million I-24 Widen I-24 from 4 to 6 lanes from I-59 to US-27, fix structurally deficient bridge $171,557,785 at I-24 and I-124, 10.4 miles (needs additional $60,277060 in GA) I-24 Interchange Modification of I-24 and SR-2 (Broad St) / State Route 58 (Market Construction $37,000,000 St.) I-24 Interchange Modification Interstate 24 and SR 2-Broad St / SR 58-Market St.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages21 Page
-
File Size-