Status of Pending B-3 New Connection Upto 30-09-2019 Received & Uploaded on 11-10-2019 1St Circle Fesco Faisalabad

Status of Pending B-3 New Connection Upto 30-09-2019 Received & Uploaded on 11-10-2019 1St Circle Fesco Faisalabad

STATUS OF PENDING B-3 NEW CONNECTION UPTO 30-09-2019 RECEIVED & UPLOADED ON 11-10-2019 1ST CIRCLE FESCO FAISALABAD Sr. Application Load Approved / Ripe / Un Name of Consumer Status No. No. (KW) Unapproved Ripe 1 42/B-3/New JUBILEE CLOTH MILLS (PVT) LTD, 1200 KW Approved vide DN paid on 05-12-14 Un Ripe 20-03-2014 05-Km Jaranwala Road Khurrianwala, O/O No. Feeder has been Chak Jhumra Faisalabad. 42/8868-75 dt. completed on 01/16. 01-12-14 WTR and IC of transformer awaited. 2 48/B-3/New FAZAL-E-RABBI TEXTILES, 750 KW Approved vide DN paid on 09-02-15. Un Ripe 28-10-2014 Plot No. 774 to 777, Small Industrial Estate, O/O No. 17/736- Feeder under Civil Line Faisalabad. 42 dt. 30-01-15 constrcution with PD (Const). IC of metering panel awaited. 3 95/B-3/New FERO CAST INDUSTRY (PVT) LTD, 4600 KW Approved vide DN paid on 14-06-19. Un Ripe 31-10-2018 32-Km Sheikhupura Road, Faisalabad. O/O No Feeder under Chak Jhumra 41/3849-57 dt constrcution with PD 22-05-19 (Const). IC of metering panel awaited. 4 96/B-3/New SITARA FABRICS LIMITED, 2500 KW Cancelled vide Cancelled on 20- Due to failing to reply the 03-12-2018 32-Km Sheikhupura Road, Faisalabad. letter No. 6683- 09-2019 Chak Jhumra 85 observations raised by this office vide memo No. 4808-10 dt. 01-07-2019 5 99/B-3/New SITARA SPINNING MILLS LTD, 3000 KW Cancelled on 20- Due to failing to reply the 04-03-2019 28-Km Sheikhupura Road Chak No. 69/RB, 09-2020 observations raised by Chak Jhumra Faisalabad. this office vide memo No. 4811-13 dt. 01-07-19 6 100/B-3/New 4700 KW Cancelled on 25- SITARA CHEMICAL INDUSTERY LTD Due to failing to reply the 04-03-2019 (TEXTILE DIVISION), 09-2021 Chak Jhumra observations raised by 28-Km Sheikhupura Road Chak No. 69/RB, this office vide memo Faisalabad. No. 4814-16 dt. 01-07-20 7 105/B-3/New BUILTEC PLASTICS (PVT) LTD, 1281.70 KW Due to failing to reply the Cancellaed on 08-03-2019 Satiana Road , Faisalabad. observations raised by 30-09-2019 Jaranwala this office vide memo No. 6186 dated 29-08- 2019 8 106/B-3/New SITARA PER OXIDE LTD, 4000 KW Submitted for approval of Un Ripe 08-03-2019 26-Km Sheikhupura Road Khurrianwala, cancellation vide U No. Chak Jhumra Faisalabad. 1152 dt. 25-07-19 9 107/B-3/New ZN KNITS, 630 KW Submitted for approval Un Ripe 08-03-2019 Chak No. 117/JB Dahnola near Same Nala, Civil Line Faisalabad. 10 108/B-3/New 3592 KW Cancelled on 20- MK SONS (PVT) LTD, Due to failing to reply the 08-03-2019 09-2019 32-Km Sheikupura Road, Faisalabad. observations raised by Chak Jhumra this office vide memo Nos. 266-67 dated 09-04- 2019 and No. 4984-85 dated 09-07-2019. Page 1 of 10 STATUS OF PENDING B-3 NEW CONNECTION IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 90/B-3/New HUAFON PAKISTAN LTD, 800 KW Approved vide DN paid on 27-06-19. Un Ripe 08-12-2017 Plot No. 148-151, M-3 Industrial City, Faisalabad. O/O No. Feeder under Chak Jhumra 48/4469-73 dt. construction with 21-06-19 PD(Const) 2 98/B-3/New GMSA INTERNATIONAL COMPANY, 1250 KW Approved vide DN paid on 08-07-19. Un Ripe 04-03-2019 Plot No. 07-B, M-3 Industrial City, Faisalabad. O/O No. WTR & IC of metering Chak Jhumra 49/4480-81 dt. panel and transformer 21-06-19 awaited. 3 101/B-3/New MEHRAN BOTTLERS (PVT) LTD, 950 KW Approved vide DN paid on 05-07-19. Ripe 04-03-2019 Plot No. 29-AI, M-3 Industrial City, Faisalabad. O/O No. Committee constituted Chak Jhumra 50/4489-93 dt. for energization of 21-06-19 connection vide O/O No.69/6502-06 dt. 17-9-19 4 102/B-3/New HYUNDAI NISHAT MOTORS (PVT) 3000 KW Approved vide DN paid on 19-08-19. Un Ripe 07-03-2019 LTD, O/O No. Feeder under Chak Jhumra 59/5537-44 dt. construction with Plot No. 181-187, 198-208 Phase-II, M-3 01-08-19. PD(Const) Industrial City, Faisalabad. 5 103/B-3/New HAYAT KIMYA PAKISTAN (PVT) LTD, 2000 KW Estimate & sketch sent to Un Ripe 07-03-2019 Plot No. 279, 280 & 281 Phase-II, M-3 Industrial XEN(C) for vetting. Chak Jhumra City, Faisalabad. 6 104/B-3/New PRISMA TECH (PVT) LTD, 700 KW Approved vide DN paid on 04-07-19. Un Ripe 08-03-2019 Plot No. 51-B, Phase-BI, M-3 Industrial City, O/O No. Extension of HT line of Chak Jhumra Faisalabad. 51/4698-4502 11 KV Karss paint feeder dt. 21-06-19 under construction with PD(Const) 7 109/B-3/New DELI-IW GLASS WARE COMPANY 4000 KW Approved Under approval of BOD. Un Ripe 08-03-2019 LTD, Chak Jhumra Plot No. 341 & 342, M-3 Industrial City, Faisalabad. 8 110/B-3/New TIME CERAMICS (PVT) LTD, 4500 KW Approved Under approval of BOD. Un Ripe 02-04-2019 Plot No. 275, Phase-II, M-3 Industrial City, Chak Jhumra Faisalabad. 9 114/B-3/New PRINTKRAFT (PVT) LTD, 1060 KW Under process Un Ripe 23-07-2019 Plot No. 49, Phase-IA, M-3 Industrial City, Chak Jhumra Faisalabad. 10 115/B-3/New RENACON PHARMA (PVT) LTD, 587 KW Under process Un Ripe 24-07-2019 Plot No. 06, Phase-II, M-3 Industrial City, Chak Jhumra Faisalabad. STATUS OF PENDING B-3 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 263/B-3/Ext. MULTAN CHEMICAL LTD, 877 + 3323 Approved vide DN paid on 10-04-18. Un Ripe 12-06-2017 Plot No. 06,07 and 08, M-3 Industrial City = 4200 KW O/O No. WTR and IC of Chak Jhumra FIEDMC Faisalabad. 24-13152-5200555 R 39/1952-58 dt. transformer awaited. 20-03-18 STATUS OF PENDING B-4 NEW CONNECTION CASES UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 33/B-4/New FIRST TREET MANUFACTURING 9.985 MW Approved vide Principal approval Un Ripe 12-01-2016 MODARABA (BATERY DIVISION), O/O No. 2183- accorded for constrcution Chak Jhumra 89 dt. 07-09-16 of grid stion - Under final Plot No. T8A, Phase-II, M-3 Industrial City approval Sahianwala, Faisalabad. 2 45/B-4/New NISHAT MILLS LIMITED, 10 MW DN paid of load flow Un Ripe 18-07-2019 Plot No. 172-180 and 188-197 Phase-II, M-3 study charges on 06-08- Chak Jhumra Industrial City Sahianwala, Faisalabad. 2019. STATUS OF PENDING B-4 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 43/B-4/Ext. ZAHIDJEE TEXTILE MILLS LTD, 4950 + DN for load flow study Un Ripe 22-02-2019 Plot No. 4,5,6,7,8 and 9 Industrial City FIEDMC 12050 = charges paid on 22-03- Chak Jhumra Sahianwala Faisalabad. 17000 MW 2019. 28-13152-5200585 R. Page 2 of 10 STATUS OF PENDING B-3 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 98/B-3/EXT. FAISAL FABRICS LTD, 2162 + 1338 Approved vide D/N paid on 23-04-14 Un Ripe 07-08-2013 1-Km Jaranwala Road Khurrianwala Faisalabad. = 3500 KW O/O No. Feeder under const. with Chak Jhumra 24-13153-5309400 U 43/1741-47 dt. PD (Const), WTR, IC of 07-08-13 grid panel and transformer awaited. 2 99/B-3/EXT. HASSAN LTD, 4320 + 650 Approved vide D/N paid on 23-04-14. Un Ripe 15-08-2013 Chak No. 77/RB Khurrianwala Faisalabad. = 4970 KW O/O No. Feeder under const. with Chak Jhumra 24-13153-5309201 R 44/1754-60 dt. PD (Const), WTR and IC 25-03-14 of transformer awaited. 3 172/B-3/COL/ NATIONAL SILK & RAYAN MILLS LTD, 452 + 995 = Approved vide DN paid on 03-03-15. Ripe Ext. Jaranwala Road Faisalabad. 1447 + 1051 O/O No. 20/852- Committee constituted 17-11-2014 24-13131-5101600 U = 2498 KW 58 dt. 04-02-15 for energization of Abdullahpur connection vide O/O No. 73/6822-27 dt. 26-09- 2019 4 176/B-3/Ext. RASHID TEXTILE PROCESSING 980.510+52 Approved vide DN paid on 22-07-15, Un Ripe 16-12-2014 INDUSTRY, 0 = 1500 O/O No. Feeder under const. with Civil Line KW 131/4720-25 dt. PD(Const). WTR and IC Chak No. 07/JB, Sargodha Road, Faisalabad. 25-06-15 of transformer awaited. 24-13123-5304500 U 5 178/B-3/Ext. USMAN CLOTH MILLS (PVT) LTD, 454 + 326 = Approved vide DN paid on 23-07-15. Un Ripe 16-12-2014 Chak No. 7/JB Sargodha Road, Faisalabad. 977 KW O/O No. Feeder under const. with Civil Line 24-13123-5302200 U 130/4706-13 dt. PD (Const). WTR and IC 25-06-15 of transformer awaited. 6 188/B-3/Ext. YASIR AFZAL TEXTILE DYING & 989 + 61 = Approved vide DN paid on 26-06-15. Un Ripe 26-01-2015 PRINTING INDUSTRY, 1050 KW O/O No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us