Status of Pending B-3 New Connection Upto 30-09-2019 Received & Uploaded on 11-10-2019 1St Circle Fesco Faisalabad
Total Page:16
File Type:pdf, Size:1020Kb
STATUS OF PENDING B-3 NEW CONNECTION UPTO 30-09-2019 RECEIVED & UPLOADED ON 11-10-2019 1ST CIRCLE FESCO FAISALABAD Sr. Application Load Approved / Ripe / Un Name of Consumer Status No. No. (KW) Unapproved Ripe 1 42/B-3/New JUBILEE CLOTH MILLS (PVT) LTD, 1200 KW Approved vide DN paid on 05-12-14 Un Ripe 20-03-2014 05-Km Jaranwala Road Khurrianwala, O/O No. Feeder has been Chak Jhumra Faisalabad. 42/8868-75 dt. completed on 01/16. 01-12-14 WTR and IC of transformer awaited. 2 48/B-3/New FAZAL-E-RABBI TEXTILES, 750 KW Approved vide DN paid on 09-02-15. Un Ripe 28-10-2014 Plot No. 774 to 777, Small Industrial Estate, O/O No. 17/736- Feeder under Civil Line Faisalabad. 42 dt. 30-01-15 constrcution with PD (Const). IC of metering panel awaited. 3 95/B-3/New FERO CAST INDUSTRY (PVT) LTD, 4600 KW Approved vide DN paid on 14-06-19. Un Ripe 31-10-2018 32-Km Sheikhupura Road, Faisalabad. O/O No Feeder under Chak Jhumra 41/3849-57 dt constrcution with PD 22-05-19 (Const). IC of metering panel awaited. 4 96/B-3/New SITARA FABRICS LIMITED, 2500 KW Cancelled vide Cancelled on 20- Due to failing to reply the 03-12-2018 32-Km Sheikhupura Road, Faisalabad. letter No. 6683- 09-2019 Chak Jhumra 85 observations raised by this office vide memo No. 4808-10 dt. 01-07-2019 5 99/B-3/New SITARA SPINNING MILLS LTD, 3000 KW Cancelled on 20- Due to failing to reply the 04-03-2019 28-Km Sheikhupura Road Chak No. 69/RB, 09-2020 observations raised by Chak Jhumra Faisalabad. this office vide memo No. 4811-13 dt. 01-07-19 6 100/B-3/New 4700 KW Cancelled on 25- SITARA CHEMICAL INDUSTERY LTD Due to failing to reply the 04-03-2019 (TEXTILE DIVISION), 09-2021 Chak Jhumra observations raised by 28-Km Sheikhupura Road Chak No. 69/RB, this office vide memo Faisalabad. No. 4814-16 dt. 01-07-20 7 105/B-3/New BUILTEC PLASTICS (PVT) LTD, 1281.70 KW Due to failing to reply the Cancellaed on 08-03-2019 Satiana Road , Faisalabad. observations raised by 30-09-2019 Jaranwala this office vide memo No. 6186 dated 29-08- 2019 8 106/B-3/New SITARA PER OXIDE LTD, 4000 KW Submitted for approval of Un Ripe 08-03-2019 26-Km Sheikhupura Road Khurrianwala, cancellation vide U No. Chak Jhumra Faisalabad. 1152 dt. 25-07-19 9 107/B-3/New ZN KNITS, 630 KW Submitted for approval Un Ripe 08-03-2019 Chak No. 117/JB Dahnola near Same Nala, Civil Line Faisalabad. 10 108/B-3/New 3592 KW Cancelled on 20- MK SONS (PVT) LTD, Due to failing to reply the 08-03-2019 09-2019 32-Km Sheikupura Road, Faisalabad. observations raised by Chak Jhumra this office vide memo Nos. 266-67 dated 09-04- 2019 and No. 4984-85 dated 09-07-2019. Page 1 of 10 STATUS OF PENDING B-3 NEW CONNECTION IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 90/B-3/New HUAFON PAKISTAN LTD, 800 KW Approved vide DN paid on 27-06-19. Un Ripe 08-12-2017 Plot No. 148-151, M-3 Industrial City, Faisalabad. O/O No. Feeder under Chak Jhumra 48/4469-73 dt. construction with 21-06-19 PD(Const) 2 98/B-3/New GMSA INTERNATIONAL COMPANY, 1250 KW Approved vide DN paid on 08-07-19. Un Ripe 04-03-2019 Plot No. 07-B, M-3 Industrial City, Faisalabad. O/O No. WTR & IC of metering Chak Jhumra 49/4480-81 dt. panel and transformer 21-06-19 awaited. 3 101/B-3/New MEHRAN BOTTLERS (PVT) LTD, 950 KW Approved vide DN paid on 05-07-19. Ripe 04-03-2019 Plot No. 29-AI, M-3 Industrial City, Faisalabad. O/O No. Committee constituted Chak Jhumra 50/4489-93 dt. for energization of 21-06-19 connection vide O/O No.69/6502-06 dt. 17-9-19 4 102/B-3/New HYUNDAI NISHAT MOTORS (PVT) 3000 KW Approved vide DN paid on 19-08-19. Un Ripe 07-03-2019 LTD, O/O No. Feeder under Chak Jhumra 59/5537-44 dt. construction with Plot No. 181-187, 198-208 Phase-II, M-3 01-08-19. PD(Const) Industrial City, Faisalabad. 5 103/B-3/New HAYAT KIMYA PAKISTAN (PVT) LTD, 2000 KW Estimate & sketch sent to Un Ripe 07-03-2019 Plot No. 279, 280 & 281 Phase-II, M-3 Industrial XEN(C) for vetting. Chak Jhumra City, Faisalabad. 6 104/B-3/New PRISMA TECH (PVT) LTD, 700 KW Approved vide DN paid on 04-07-19. Un Ripe 08-03-2019 Plot No. 51-B, Phase-BI, M-3 Industrial City, O/O No. Extension of HT line of Chak Jhumra Faisalabad. 51/4698-4502 11 KV Karss paint feeder dt. 21-06-19 under construction with PD(Const) 7 109/B-3/New DELI-IW GLASS WARE COMPANY 4000 KW Approved Under approval of BOD. Un Ripe 08-03-2019 LTD, Chak Jhumra Plot No. 341 & 342, M-3 Industrial City, Faisalabad. 8 110/B-3/New TIME CERAMICS (PVT) LTD, 4500 KW Approved Under approval of BOD. Un Ripe 02-04-2019 Plot No. 275, Phase-II, M-3 Industrial City, Chak Jhumra Faisalabad. 9 114/B-3/New PRINTKRAFT (PVT) LTD, 1060 KW Under process Un Ripe 23-07-2019 Plot No. 49, Phase-IA, M-3 Industrial City, Chak Jhumra Faisalabad. 10 115/B-3/New RENACON PHARMA (PVT) LTD, 587 KW Under process Un Ripe 24-07-2019 Plot No. 06, Phase-II, M-3 Industrial City, Chak Jhumra Faisalabad. STATUS OF PENDING B-3 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 263/B-3/Ext. MULTAN CHEMICAL LTD, 877 + 3323 Approved vide DN paid on 10-04-18. Un Ripe 12-06-2017 Plot No. 06,07 and 08, M-3 Industrial City = 4200 KW O/O No. WTR and IC of Chak Jhumra FIEDMC Faisalabad. 24-13152-5200555 R 39/1952-58 dt. transformer awaited. 20-03-18 STATUS OF PENDING B-4 NEW CONNECTION CASES UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 33/B-4/New FIRST TREET MANUFACTURING 9.985 MW Approved vide Principal approval Un Ripe 12-01-2016 MODARABA (BATERY DIVISION), O/O No. 2183- accorded for constrcution Chak Jhumra 89 dt. 07-09-16 of grid stion - Under final Plot No. T8A, Phase-II, M-3 Industrial City approval Sahianwala, Faisalabad. 2 45/B-4/New NISHAT MILLS LIMITED, 10 MW DN paid of load flow Un Ripe 18-07-2019 Plot No. 172-180 and 188-197 Phase-II, M-3 study charges on 06-08- Chak Jhumra Industrial City Sahianwala, Faisalabad. 2019. STATUS OF PENDING B-4 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 43/B-4/Ext. ZAHIDJEE TEXTILE MILLS LTD, 4950 + DN for load flow study Un Ripe 22-02-2019 Plot No. 4,5,6,7,8 and 9 Industrial City FIEDMC 12050 = charges paid on 22-03- Chak Jhumra Sahianwala Faisalabad. 17000 MW 2019. 28-13152-5200585 R. Page 2 of 10 STATUS OF PENDING B-3 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 98/B-3/EXT. FAISAL FABRICS LTD, 2162 + 1338 Approved vide D/N paid on 23-04-14 Un Ripe 07-08-2013 1-Km Jaranwala Road Khurrianwala Faisalabad. = 3500 KW O/O No. Feeder under const. with Chak Jhumra 24-13153-5309400 U 43/1741-47 dt. PD (Const), WTR, IC of 07-08-13 grid panel and transformer awaited. 2 99/B-3/EXT. HASSAN LTD, 4320 + 650 Approved vide D/N paid on 23-04-14. Un Ripe 15-08-2013 Chak No. 77/RB Khurrianwala Faisalabad. = 4970 KW O/O No. Feeder under const. with Chak Jhumra 24-13153-5309201 R 44/1754-60 dt. PD (Const), WTR and IC 25-03-14 of transformer awaited. 3 172/B-3/COL/ NATIONAL SILK & RAYAN MILLS LTD, 452 + 995 = Approved vide DN paid on 03-03-15. Ripe Ext. Jaranwala Road Faisalabad. 1447 + 1051 O/O No. 20/852- Committee constituted 17-11-2014 24-13131-5101600 U = 2498 KW 58 dt. 04-02-15 for energization of Abdullahpur connection vide O/O No. 73/6822-27 dt. 26-09- 2019 4 176/B-3/Ext. RASHID TEXTILE PROCESSING 980.510+52 Approved vide DN paid on 22-07-15, Un Ripe 16-12-2014 INDUSTRY, 0 = 1500 O/O No. Feeder under const. with Civil Line KW 131/4720-25 dt. PD(Const). WTR and IC Chak No. 07/JB, Sargodha Road, Faisalabad. 25-06-15 of transformer awaited. 24-13123-5304500 U 5 178/B-3/Ext. USMAN CLOTH MILLS (PVT) LTD, 454 + 326 = Approved vide DN paid on 23-07-15. Un Ripe 16-12-2014 Chak No. 7/JB Sargodha Road, Faisalabad. 977 KW O/O No. Feeder under const. with Civil Line 24-13123-5302200 U 130/4706-13 dt. PD (Const). WTR and IC 25-06-15 of transformer awaited. 6 188/B-3/Ext. YASIR AFZAL TEXTILE DYING & 989 + 61 = Approved vide DN paid on 26-06-15. Un Ripe 26-01-2015 PRINTING INDUSTRY, 1050 KW O/O No.