STATUS OF PENDING B-3 NEW CONNECTION UPTO 30-09-2019 RECEIVED & UPLOADED ON 11-10-2019 1ST CIRCLE FESCO

Sr. Application Load Approved / Ripe / Un Name of Consumer Status No. No. (KW) Unapproved Ripe 1 42/B-3/New JUBILEE CLOTH MILLS (PVT) LTD, 1200 KW Approved vide DN paid on 05-12-14 Un Ripe 20-03-2014 05-Km Road , O/O No. Feeder has been Faisalabad. 42/8868-75 dt. completed on 01/16. 01-12-14 WTR and IC of transformer awaited. 2 48/B-3/New FAZAL-E-RABBI TEXTILES, 750 KW Approved vide DN paid on 09-02-15. Un Ripe 28-10-2014 Plot No. 774 to 777, Small Industrial Estate, O/O No. 17/736- Feeder under Civil Line Faisalabad. 42 dt. 30-01-15 constrcution with PD (Const). IC of metering panel awaited. 3 95/B-3/New FERO CAST INDUSTRY (PVT) LTD, 4600 KW Approved vide DN paid on 14-06-19. Un Ripe 31-10-2018 32-Km Sheikhupura Road, Faisalabad. O/O No Feeder under Chak Jhumra 41/3849-57 dt constrcution with PD 22-05-19 (Const). IC of metering panel awaited. 4 96/B-3/New SITARA FABRICS LIMITED, 2500 KW Cancelled vide Cancelled on 20- Due to failing to reply the 03-12-2018 32-Km Sheikhupura Road, Faisalabad. letter No. 6683- 09-2019 Chak Jhumra 85 observations raised by this office vide memo No. 4808-10 dt. 01-07-2019 5 99/B-3/New SITARA SPINNING MILLS LTD, 3000 KW Cancelled on 20- Due to failing to reply the 04-03-2019 28-Km Sheikhupura Road Chak No. 69/RB, 09-2020 observations raised by Chak Jhumra Faisalabad. this office vide memo No. 4811-13 dt. 01-07-19

6 100/B-3/New 4700 KW Cancelled on 25- SITARA CHEMICAL INDUSTERY LTD Due to failing to reply the 04-03-2019 (TEXTILE DIVISION), 09-2021 Chak Jhumra observations raised by 28-Km Sheikhupura Road Chak No. 69/RB, this office vide memo Faisalabad. No. 4814-16 dt. 01-07-20

7 105/B-3/New BUILTEC PLASTICS (PVT) LTD, 1281.70 KW Due to failing to reply the Cancellaed on 08-03-2019 Road , Faisalabad. observations raised by 30-09-2019 Jaranwala this office vide memo No. 6186 dated 29-08- 2019 8 106/B-3/New SITARA PER OXIDE LTD, 4000 KW Submitted for approval of Un Ripe 08-03-2019 26-Km Sheikhupura Road Khurrianwala, cancellation vide U No. Chak Jhumra Faisalabad. 1152 dt. 25-07-19

9 107/B-3/New ZN KNITS, 630 KW Submitted for approval Un Ripe 08-03-2019 Chak No. 117/JB Dahnola near Same Nala, Civil Line Faisalabad. 10 108/B-3/New 3592 KW Cancelled on 20- MK SONS (PVT) LTD, Due to failing to reply the 08-03-2019 09-2019 32-Km Sheikupura Road, Faisalabad. observations raised by Chak Jhumra this office vide memo Nos. 266-67 dated 09-04- 2019 and No. 4984-85 dated 09-07-2019.

Page 1 of 10 STATUS OF PENDING B-3 NEW CONNECTION IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 90/B-3/New HUAFON LTD, 800 KW Approved vide DN paid on 27-06-19. Un Ripe 08-12-2017 Plot No. 148-151, M-3 Industrial City, Faisalabad. O/O No. Feeder under Chak Jhumra 48/4469-73 dt. construction with 21-06-19 PD(Const) 2 98/B-3/New GMSA INTERNATIONAL COMPANY, 1250 KW Approved vide DN paid on 08-07-19. Un Ripe 04-03-2019 Plot No. 07-B, M-3 Industrial City, Faisalabad. O/O No. WTR & IC of metering Chak Jhumra 49/4480-81 dt. panel and transformer 21-06-19 awaited. 3 101/B-3/New MEHRAN BOTTLERS (PVT) LTD, 950 KW Approved vide DN paid on 05-07-19. Ripe 04-03-2019 Plot No. 29-AI, M-3 Industrial City, Faisalabad. O/O No. Committee constituted Chak Jhumra 50/4489-93 dt. for energization of 21-06-19 connection vide O/O No.69/6502-06 dt. 17-9-19 4 102/B-3/New HYUNDAI NISHAT MOTORS (PVT) 3000 KW Approved vide DN paid on 19-08-19. Un Ripe 07-03-2019 LTD, O/O No. Feeder under Chak Jhumra 59/5537-44 dt. construction with Plot No. 181-187, 198-208 Phase-II, M-3 01-08-19. PD(Const) Industrial City, Faisalabad. 5 103/B-3/New HAYAT KIMYA PAKISTAN (PVT) LTD, 2000 KW Estimate & sketch sent to Un Ripe 07-03-2019 Plot No. 279, 280 & 281 Phase-II, M-3 Industrial XEN(C) for vetting. Chak Jhumra City, Faisalabad.

6 104/B-3/New PRISMA TECH (PVT) LTD, 700 KW Approved vide DN paid on 04-07-19. Un Ripe 08-03-2019 Plot No. 51-B, Phase-BI, M-3 Industrial City, O/O No. Extension of HT line of Chak Jhumra Faisalabad. 51/4698-4502 11 KV Karss paint feeder dt. 21-06-19 under construction with PD(Const) 7 109/B-3/New DELI-IW GLASS WARE COMPANY 4000 KW Approved Under approval of BOD. Un Ripe 08-03-2019 LTD, Chak Jhumra Plot No. 341 & 342, M-3 Industrial City, Faisalabad. 8 110/B-3/New TIME CERAMICS (PVT) LTD, 4500 KW Approved Under approval of BOD. Un Ripe 02-04-2019 Plot No. 275, Phase-II, M-3 Industrial City, Chak Jhumra Faisalabad. 9 114/B-3/New PRINTKRAFT (PVT) LTD, 1060 KW Under process Un Ripe 23-07-2019 Plot No. 49, Phase-IA, M-3 Industrial City, Chak Jhumra Faisalabad. 10 115/B-3/New RENACON PHARMA (PVT) LTD, 587 KW Under process Un Ripe 24-07-2019 Plot No. 06, Phase-II, M-3 Industrial City, Chak Jhumra Faisalabad. STATUS OF PENDING B-3 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 263/B-3/Ext. MULTAN CHEMICAL LTD, 877 + 3323 Approved vide DN paid on 10-04-18. Un Ripe 12-06-2017 Plot No. 06,07 and 08, M-3 Industrial City = 4200 KW O/O No. WTR and IC of Chak Jhumra FIEDMC Faisalabad. 24-13152-5200555 R 39/1952-58 dt. transformer awaited. 20-03-18 STATUS OF PENDING B-4 NEW CONNECTION CASES UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 33/B-4/New FIRST TREET MANUFACTURING 9.985 MW Approved vide Principal approval Un Ripe 12-01-2016 MODARABA (BATERY DIVISION), O/O No. 2183- accorded for constrcution Chak Jhumra 89 dt. 07-09-16 of grid stion - Under final Plot No. T8A, Phase-II, M-3 Industrial City approval , Faisalabad. 2 45/B-4/New NISHAT MILLS LIMITED, 10 MW DN paid of load flow Un Ripe 18-07-2019 Plot No. 172-180 and 188-197 Phase-II, M-3 study charges on 06-08- Chak Jhumra Industrial City Sahianwala, Faisalabad. 2019. STATUS OF PENDING B-4 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 43/B-4/Ext. ZAHIDJEE TEXTILE MILLS LTD, 4950 + DN for load flow study Un Ripe 22-02-2019 Plot No. 4,5,6,7,8 and 9 Industrial City FIEDMC 12050 = charges paid on 22-03- Chak Jhumra Sahianwala Faisalabad. 17000 MW 2019. 28-13152-5200585 R.

Page 2 of 10 STATUS OF PENDING B-3 EXTENSION OF LOAD CASES IN FIEDMC UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 98/B-3/EXT. FAISAL FABRICS LTD, 2162 + 1338 Approved vide D/N paid on 23-04-14 Un Ripe 07-08-2013 1-Km Jaranwala Road Khurrianwala Faisalabad. = 3500 KW O/O No. Feeder under const. with Chak Jhumra 24-13153-5309400 U 43/1741-47 dt. PD (Const), WTR, IC of 07-08-13 grid panel and transformer awaited. 2 99/B-3/EXT. HASSAN LTD, 4320 + 650 Approved vide D/N paid on 23-04-14. Un Ripe 15-08-2013 Chak No. 77/RB Khurrianwala Faisalabad. = 4970 KW O/O No. Feeder under const. with Chak Jhumra 24-13153-5309201 R 44/1754-60 dt. PD (Const), WTR and IC 25-03-14 of transformer awaited. 3 172/B-3/COL/ NATIONAL SILK & RAYAN MILLS LTD, 452 + 995 = Approved vide DN paid on 03-03-15. Ripe Ext. Jaranwala Road Faisalabad. 1447 + 1051 O/O No. 20/852- Committee constituted 17-11-2014 24-13131-5101600 U = 2498 KW 58 dt. 04-02-15 for energization of Abdullahpur connection vide O/O No. 73/6822-27 dt. 26-09- 2019 4 176/B-3/Ext. RASHID TEXTILE PROCESSING 980.510+52 Approved vide DN paid on 22-07-15, Un Ripe 16-12-2014 INDUSTRY, 0 = 1500 O/O No. Feeder under const. with Civil Line KW 131/4720-25 dt. PD(Const). WTR and IC Chak No. 07/JB, Sargodha Road, Faisalabad. 25-06-15 of transformer awaited. 24-13123-5304500 U 5 178/B-3/Ext. USMAN CLOTH MILLS (PVT) LTD, 454 + 326 = Approved vide DN paid on 23-07-15. Un Ripe 16-12-2014 Chak No. 7/JB Sargodha Road, Faisalabad. 977 KW O/O No. Feeder under const. with Civil Line 24-13123-5302200 U 130/4706-13 dt. PD (Const). WTR and IC 25-06-15 of transformer awaited. 6 188/B-3/Ext. YASIR AFZAL TEXTILE DYING & 989 + 61 = Approved vide DN paid on 26-06-15. Un Ripe 26-01-2015 PRINTING INDUSTRY, 1050 KW O/O No. WTR and IC of Civil Line 136/4783-89 dt. transformer awaited. Sargodha Road, Faisalabad. 25-06-15 24-13125-5504015 U 7 196/B-3/Ext. MIMA COTTON MILLS LIMITED, 2985 + 1965 Approved vide DN paid on 10-09-15. Un Ripe 12-03-2015 38-Km Sheikhupura Road Faisalabad. = 4950 KW O/O No. Double circuit 11 KV line Chak Jhumra 24-13154-5402600 U 30/1454-59 dt. of Mima feeder under 27-08-15 const. with PD (Const). WTR and IC of transformer awaited. 8 204/B-3/Ext. MOON TEXTILE INDUSTRIES (PVT) 989 + 1140 Approved vide DN paid on 19-09-16. Un Ripe 29-04-2015 LTD, = 2129 KW O/O No. Feeder under Civil Line 171/2560-66 dt. construction with PD Sargodha Road, Faisalabad. 03-06-16 (Const). WTR and IC of 24-13123-5307000 U. grid panel awaited. 9 210/B-3/Ext. IMAGE TEXTILE MILLS (PVT) LTD, 980 + Approved vide DN paid on 30-06-16. Un Ripe 24-08-2015 02-Km Jaranwala Road Khurrianwala 1141.952 = O/O No. Feeder under Chak Jhumra Faisalabad. 24-13153-5304200 R 2121.952 195/9588-95 dt. construction with PD KW 04-07-16 (Const). WTR and IC of tranformer awaited. 10 211/B-3/Ext. AMMAR BILAL TEXTILE, 453 + 597 = Approved vide DN paid on 29-08-16. Un Ripe 08-09-2015 Chak No. 7/JB, Same Nala Small Estate 1050 KW O/O No. Feeder under Civil Line Sargodha Road, Faisalabad. 210/1835-41 dt. construction with PD 24-13123-5303166 U 25-08-16 (Const). 11 212/B-3/Ext. BASHIR PRINTING INDUSTRIES (PVT) 643 + 557 = Approved vide DN paid on 23-09-16. Un Ripe 08-09-2015 LTD, 1200 KW O/O No. Feeder under Civil Line 209/1823-28 dt. construction with PD Chak No. 07/JB, Sargodha Road, Faisalabad. 25-08-16 (Const). WTR and IC of 24-13123-5303700 tranformer awaited. 12 213/B-3/Ext. KASHIF TEXTILE, 502 + 248 = Approved vide DN paid on 22-09-16. Un Ripe 08-09-2015 Sadiqabad off Sargodha Road, punj puli, 750 KW O/O No. Feeder under Civil Line Faisalabad. 24-13123-5311750 U 226/2587-94 dt. construction with PD 23-09-16 (Const). WTR and IC of grid panel and tranformer 13 219/B-3/Ext. NAGRA SPINNING MILL (PVT) LTD, 3484 + 1219 Approvedawaited. for kept Un Ripe 11-01-2016 Sheikhupura Road Adda Johal Faisalabad. = 4700 KW pending till decision of Chak Jhumra 24-13154-5403800 R High Court regarding duplicate source of supply.

Page 3 of 10 14 241/B-3/Ext. FAISAL FEEDS, 270 + 606 = Approved vide DN paid on 20-02-18. Un Ripe 28-07-2016 Chiniot Road Faisalabad. 876 KW O/O No. 13/624- Feeder under Chiniot 24-13161-5100902 R 30 dt. 31-01-18 construction with PD (Const). WTR, IC Certificate of panel & transformer awaited. 15 242/B-3/Ext. AL-NOOR PROCESSING AND 752 + Approved vide DN paid on 19-03-18. Un Ripe 29-07-2016 TEXTILE MILLS (PVT) LTD, 237.50 = O/O No. 20/983- IC of transformer Civil Line 989.50 KW 88 dt. 19-02-18 awaited. Chak No. 7/JB Sargodha Road Faisalabad. 24-13123-5315102 U 16 243/B-3/Ext. AL-REHMAN PAPER MILLS, 452 + 448 = Approved vide DN paid on 13-04-18 Un Ripe 01-08-2016 Moza Rajoya near Zamindar Chemical Mills 900 KW O/O No. 18/927- Feeder under Chiniot Chiniot. 24-13161-5101014 R 33 dt. 16-02-18 construction with PD (Const). WTR and IC of grid panel and tranformer awaited. 17 246/B-3/Ext. BISMILLAH TOWEL INDUSTRIES, 450 + 400 = Approved vide DN paid on 17-04-18. Un Ripe 14-10-2016 Near Darbar Jewan Shah Faisalabad Road 850 KW O/O No. Feeder under Chiniot Chiniot. 24-13161-5100911 R 30/1604-10 dt. construction with PD 13-03-18 (Const). WTR and IC of grid panel and tranformer awaited. 18 250/B-3/Ext. KAMAL HOSIERY MILLS, 2520 + 2450 Estimate and sketch has Un Ripe 28-11-2016 03-Km Jhumra Road Khurrianwala Faisalabad. = 4970 KW been sent to XEN (C) Chak Jhumra 24-13152-5200840 R FESCO Faisalabad for vetting as per revised proposal vide memo No. 4676-77 dt. 26-06-2019. 19 255/B-3/Ext. KAY & EMMS (PVT) LTD, 947 + 653 = Approved vide Revised DN paid on 21- Un Ripe 27-01-2017 Chak No. 117/JB Dhanola Near Millat Road, 1600 KW O/O No. 06-18. Feeder under Civil Line Faisalabad. 24-13127-5701000 U 74/5272-78 dt. construction with PD 05-06-18 (Const). WTR and IC of grid panel and tranformer awaited. 20 259/B-3/Ext. MJ TEXTILE, 492 + 706 = Approved vide DN paid on 15-05-18. Un Ripe 19-04-2017 6.5 Km Jaranwala Road Khurrianwala 1198 KW O/O No. Feeder under Chak Jhumra Faisalabad. 24-13153-5309502 R 36/1919-25 dt. construction with PD 20-03-18 (Const). WTR and IC of grid panel and tranformer awaited. 21 261/B-3/Ext. GOHAR ENTERPRISES, 490 + 706 = Approved vide DN paid on 18-05-18. Un Ripe 08-05-2017 Chak No.103/RB Jaranwala Road Khurrianwala 1196 KW O/O No. Feeder under Chak Jhumra Faisalabad. 24-13153-5309501 R 57/1932-38 dt. construction with PD 20-03-18 (Const). WTR and IC of 22 270/B-3/Ext. UNITED INDUSTRIES LTD, 1205 + 1800 Approved vide DNgrid paid panel on and 14-06-18. tranformer Un Ripe 20-11-2017 = 3005 O/O No. Feeder under Kashmir Road Faisalabad. Abdullahpur KW 78/5565-71 dt. construction with PD 28-13132-5204300 U. 12-06-18 (Const). WTR and IC of 23 277/B-3/Ext. AA PROCESSING INDUSTRY, 495 + 455 Approved vide DNgrid paidpanel on and 28-09-18 tranformer Un Ripe 05-01-2018 Samana pull, Sargodha Road, Faisalabad. = 950 KW O/O No. WTR, IC of panels & Civil Line 24-13123-5300155 U 102/1002-08 dt, transformer awaited. 31-08-18 24 281/B-3/Ext. ITTEHAD FABRICS (PVT) LTD, 580 + 138 Approved to keep Un Ripe 12-04-2018 01- Km Jaranwala Road Khurrianwala, = 718 KW pending till decision of Chak Jhumra Faisalabad. 24-13153-5300325 R NEPRA. 25 285/B-3/Ext. PAK PUNJAB PAPER AND BOARD 498 + 198.5 Approved vide DN paid on 21-05-19. Un Ripe 08-06-2018 MILLS, = 696.5 KW O/o No. WTR, IC of panels & Chak Jhumra 33/2997-3004 transformer awaited. 32-Km Sheikhupura Road Faisalabad. dt. 23-04-19 24-13154-5400525 R 26 287/B-3/Ext. STATION INCHARGE PARCO, 1987 + 1013 Under approval of BOD. Un Ripe 25-06-2018 Chak No. 202/RB Gatti Faisalabad. = 3000 KW Chak Jhumra 24-13151-5101600 R 27 289/B-3/Ext. KAY & EMMS (PVT) LTD, 487 + 418 = Approved vide DN paid on 24-04-19. Un Ripe 10-08-2018 Chak No. 117/JB Dhanola Near Millat Road, 905 KW O/o No. Amount under Civil Line Faisalabad. 24-13127-5702010 R 34/3011-18 dt. verification. 23-04-19

Page 4 of 10 28 291/B-3/Ext. FASHION & TRENDS (PVT) LTD, 720 + 270 = Approved vide DN issued on 01-07-19. Un Ripe 05-10-2018 Chak No. 196/RB Millat Road Faisalabad 990 KW O/o No. WTR sent to XEN(O) for Civil Line 28-13127-5701960 U 53/4791-97 dt. verification vide memo 01-07-19 No. 5890 dt. 20-08-19.

29 294/B-3/Ext. AL-RAHEEM TEXTILE PROCESSING, 452.70 + Approved to keep Un Ripe 17-10-2018 72-73A Small Industrial Esate Faisalabad 477 = pending on consumer Civil Line 28-13125-5509145 U 929.70 KW request. 30 295/B-3/Ext. FAISAL SAEED PROCESSING MILLS, 492 + 500 = Approved vide DN paid on 28-08-19. Un Ripe 18-10-2018 Chak No. 121/JB Faisalabad 992 KW O/O Amount under Civil Line 24-13127-5701174 U No.63/5958-65 verification. dt. 26-08-19 31 296/B- ALLAHU AKBAR TEXTILE (PVT) LTD, 143 + 1064 Approved to keep the Un Ripe 3/Ext./CON 32-Km Sheikhupura Road Faisalabad = 1208 KW case pending till vocation 08-11-2018 24-13154-5401100 R of stay order and Chak Jhumra energization of independent feeder. 32 297/B-3/Ext. AL-KARAM CLOTH MILLS (PVT) LTD, 492 + 995 = Approved vide DN paid on 06-09-19. Un Ripe 09-11-2018 Chak No. 121/JB Sargodha Road Faisalabad 503 KW O/O Amount under Civil Line 24-13127-5701173 U No.64/5973-80 verification. dt. 26-08-18 33 300/B-3/Ext. GILLAN DYING, 699 + 851 = Approved vide DN issued on 26-08-19. Un Ripe 01-02-2019 Chak No. 107/JB Millat Road Faisalabad. 1550 KW O/O Civil Line 28-13127-5701172 U No.65/5987-93 dt. 26-08-19 34 301/B- JUBILEE TEXTILE INDUSTERIES 800 + 180 = Submitted for approval Un Ripe 3/Ext./CON (PVT) LTD, 980 KW 15-02-2019 Waheed Park, Abdullahpur, Faisalabad. Abdullahpur 24-13132-5200600 U 35 303/B-3/Ext. AHMAD JAMAL TEXTILE MILLS, 1750 + 2750 Estimate and sketchsent Un Ripe 20-02-2019 04-Km Jhumra Road, Chak No. 189/RB = 4500 KW XEN (C) for verification Chak Jhumra Khurrianwala Faisalabad vide memo No. 6297 dt. 28-13153-5300124 R. 04-09-19. 36 304/B-3/Ext. SHOUKAT ALI S/O MUHAMMAD 453 + 534 = Approved to keep Un Ripe 22-02-2019 HANIF, 990 KW pending on consumer Chak Jhumra request for one month Chak No. 97/RB Johal Bypass Faisalabad i.e. upto 25-10-2019 24-13154-5400115 R. 37 305/B-3/Ext. ARZOO TEXTILE MILLS (PVT) LTD, 2700 + 1300 Prepared Un Ripe 25-02-2019 2.6 Km Jaranwala Road Khurrianwala = 4000 KW Chak Jhumra Faisalabad. 28-13153-5301100 R. 38 306/B-3/Ext. SHAKARGUNJ FOOD PRODUCTS 967 + 1533 Under process Un Ripe 26-02-2019 LTD, = 2500 KW Jaranwala 4-Km Lahore Road Jaranwala Faisalabad. 28-13142-5200710 U.

39 307/B-3/Ext. H.A. HAQ SPINNING MILLS (PVT) LTD, 2000 + 2000 Cancellaed due to failing Cancelled on 20- 04-03-2019 28-Km sheikhupuar Road Chak No. 74/RB = 4000 KW to submit reply of 09-2019 Chak Jhumra Draman wala More, Faisalabad. observaons vide memo 28-13154-5504100 R. No. 4808-10 dated 01-07- 2019

40 310/B-3/Ext. ZAHIDJEE TEXTILE MILLS LIMITED 1000 + 2500 Under process Un Ripe 06-03-2019 UNIT NO. 4 WEAVING, = 3500 KW Jaranwala Chak No. 232/GB Road Sariana Faisalabad. 28-13144-5402200 R. 41 311/B- G.N. SPINNING MILLS, 489 + 310 = Under process. Un Ripe 3/Ext./CON Chak No. 74/RB, Sheikhupura Road Faisalabad. 799 KW 06-03-2019 24-13154-5404507 R. Chak Jhumra 42 313/B-3/Ext. MUHAMMAD ASGHAR S/O ABDUL 453 + 429 = Under process Un Ripe 02-04-2019 MAJEED, 882 KW Chak Jhumra 32-Km Sheikhupura Road near Bundala Grid station Faisalabad. 24-13154- R. 43 314/B-3/Ext. SULTANI FABRICS (PVT) LTD, 490 + 452 = Under process Un Ripe 08-05-2019 18-Km Jaranwala Road Chak No. 216/RB 942 KW Jaranwala Faisalabad. 24-13145-5507000 R.

Page 5 of 10 44 315/B-3/Ext. SULTANI ELASTO PRODUCTS (PVT) 2492.28 + Under process Un Ripe 08-05-2019 LTD, 1792.72 = Abdullahpur 4285 KW Chak No. 216/RB Muhammadwala Faisalabad. 28-13138-5804200 U 45 317/B-3/Ext. MEGNA TEXTILE INDUSTRY (PVT) 2000 + 750 Under process Un Ripe 12-06-2019 LTD, = 2750 KW Chak Jhumra 2.6 Km Jaranwala Road khurrianwala Faisalabad. 28-13153-5303300 U. 46 319/B- G.N. SPINNING MILLS, 425 + 360 = Under process Un Ripe 3/Ext./CON 27-Km Sheikhupura road Faisalabad. 785 KW 19-06-2019 24-13154-5404508 R. Chak Jhumra 47 320/B-3/Ext. BAHOO SPINNING MILLS, 492 + Under process Un Ripe 27-08-2019 30-Km Sheikhupura Road Faisalabad. 397.96 = Chak Jhumra 24-13154-5400130 R. 889.96 KW 48 321/B-3/COL. FAZAL-E-RABBI TEXTILES, 750 + 499 = Under process Un Ripe 02-09-2019 Plot No. 774 to 777, Small Industrial Estate, 1249 KW Civil Line Faisalabad. 24-13125-5508318 U 49 322/B-3/Ext. AL-HAMRA FABRICS (PVT) LTD, 966 + Under process Un Ripe 24-09-2019 10-Km Sargodha Road Faisalabad. 1554.8 = Civil Line 28-13125-5507310 U. 2520.8 KW STATUS OF PENDING B-4 EXTENSION OF LOAD CASES UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 31/B-4/Ext. MASOOD TEXTILE MILLS LIMITED, 5400 + Approved vide Committee constituted Ripe 02-04-2014 32-Km Sheikhupura Road, Faisalabad. 24- 2550 = 7950 O/O No. for energization of the Chak Jhumra 13152-5201800 U KW 259/5172-81 dt. connection vide O/o No. 28-12-16 15/702-09 dt. 24-01-19 2 37/B-4/Ext./COL GOHAR TEXTILE MILLS (PVT) LTD, 4181+2525+ Approved vide DN paid on 06-02-18. Un Ripe 12-09-2017 3-Km Jhumra Road Khurrianwala, Faisalabad. 2494 = 9200 O/O No. 01/137- Amount transferred to PD Chak Jhumra KW 48 dt. 09-01-18 GSC for construction of T/L. 3 42/B-4/Ext. BEST FIBRES (PVT) LTD 4950 + Approved vide Principle approval Un Ripe 01-02-2019 19-Km Sheikhupura Road Khurrianwala, 6050 = O/O No. accrded for construction Chak Jhumra Faisalabad. 24-13152-5309700 R 11000 KW 44/4180-87 dt. of grid station. 03-06-19 4 44/B-3/Ext. SADAQAT LTD, 4200 + 3300 Approved vide DN issued on 31-07-19 Un Ripe 07-05-2019 Sahianwala Road Khurrianwala Faisalabad = 7500 KW O/O No. Chak Jhumra 28-13152-5200830 R 58/5516-28 dt. 31-07-19 STATUS OF PENDING CHANGE OF NAME CASES UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 15/B-3/CON FAISALABAD OIL REFINERY (PVT) 750 KW Approved vide SJO issued for Ripe 15-08-2017 LTD, O/O No. implementation on 31-07- Chiniot 81/5596-99 dt. 2018. Faisalabad Road Chiniot. 24-13161-5101100 12-06-18 2 18/B-3/CON AMTEX LIMITED, 503 KW Under process Ripe 27-08-2017 Industrial Estate Road Faisalabad. Civil Line 24-13161-5101100 STATUS OF PENDING C-2 EXTENSION OF LOAD CASES 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 66/C-2/Ext. ALLIED HOSPITAL / PUNJAB 2766 + 2184 Approved vide DN issued on 27-08-19 Un Ripe 31-08-2017 MEDICAL COLLEGE, = 4950 KW O/O No. and requested for Civil Line 66/6084-91 dt. extension of due date of Faisalabad . 28-13123-5312500 U 27-08-19 payment for one month. 2 76/C-2/Ext. SUI NORTHERN GAS PIPELINE LTD, 503 + 297 = Under process Un Ripe 06-05-2019 Sargodha Road, Faisalabad . 800 KW Civil Line Ref. No. 28-13123-5308110 U. 3 77/C-2/Ext. SUI NORTHERN GAS PIPELINE LTD, 5043+ 297 Under process Un Ripe 06-05-2019 Sargodha Road, Faisalabad . = 800 KW Civil Line Ref. No. 28-13123-5308100 U STATUS OF PENDING A-2(C) NEW CONNECTION CASE UPTO 30-09-2019 1ST CIRCLE FESCO FAISALABAD 1 24/A-2(C)/New GRAND ATRIUM, 1366 KW Approved vide DN paid on 25-04-2019. Un Ripe 29-03-2018 West Canal Road Adjacent Toyota Motors O/O No. Feeder under Abdullahpur Faisalabad. 29/2867-75 dt. construction with PD Page 6 of 10 17-04-19 (Const). STATUS OF PENDING B-3 NEW CONNECTION CASES UPTO 30-09-2019 2ND CIRCLE FESCO FAISALABAD

1 77/B-3/New MOTI FABRICS (PVT) LTD, 800 KW Approved vide DN paid on 22-12-17 and Un Ripe 02-05-2017 Ghulam Rasool Nagar Dagranwan Road O/O No. 28-12-17. WTR and IC of Peoples Colony Faisalabad. 119/8232-38 panel and transformer dt. 22-11-17 awaited. STATUS OF PENDING B-3 EXTENSION OF LOAD CASES UPTO 30-09-2019 2ND CIRCLE FESCO FAISALABAD 1 180/B- TAUSEEF ENTERPRISES (PVT) LTD, 975.3 + 334 Approved vide DN paid on 08-09-15. Un Ripe 3/COL/Ext. Chak No. 219/RB, Jugewala, Faisalabad. 24- + 119 = O/O No. 02/289- Feeder under const. with 22-12-2014 13223-5306910 U 199+801 = 95 dt. 13-07-15 PD (Const). WTR and IC G.M. Abad 3000 KW of panel & transformer awaited. 2 266/B-3/Ext. ZAM ZAM TEXTILE INDUSTRIES (PVT) 146 + 814 Approved vide DN paid on 11-07-18. Un Ripe 25-09-2017 LTD, = 960 KW O/O No. WTR, IC of panels and Peoples Colony 76/5538-44 dt. transformer awaited. Satiana Road, Chak No. 214/RB, Faisalabad. 24- 12-06-18 Notice issued on 25-7- 13241-5101800 R 19. 3 298/B- PUNJAB BEVERAGE COMPANY (PVT) 3723 + 800 Approved vide DN issued on 27-08-19 Un Ripe 3/Ext./COL LTD, = 4523 + O/O No. and requested to extend 02-01-2019 427 = 4950 67/6106-11 dt. the due date of payment Road, Nisar conlyFaisalabad. 28- Peoples Colony KW 27-08-19 upto 27-10-2019. 13211-5101800 U and 28-13211-5101805 U

4 309/B-3/Ext. GULZAR DYING WORKS, 64 + 549 = Letter written to Un Ripe 05-03-2019 Chak No. 123/JB Jilal Street, Faisalabad. 24- 613 KW consumer mismatch of G.M. Abad 13227-5203000 U signature. 5 312/B-3/Ext. PARACHA SOAP & CHEMICAL 497.44 + Under process Un Ripe 08-03-2019 INDUSTRIES (PVT) LTD, 220.44 = Nazimabad 717.88 KW Chak No. 67/JB, Saddhar Faisalabad, Faisalabad. 24-13216-5605300 R 6 316/B-3/Ext. MUJTABA MASOOD TEXTILE, 494.5 + Estimate and sketch sent Un Ripe 14-05-2019 Chak No. 245/RB Abbaspur Jhang Road 525.5 = XEN (C) for vetting vide G.M. Abad Faisalabad. 24-13225-5505963 R 1020 KW memo No. 6727 dt. 24-09- 2019. STATUS OF PENDING A-2 NEW CONNECTION CASES UPTO 30-09-2019 2ND CIRCLE FESCO FAISALABAD 1 21/A-2 (C)/New PARADISE TOWER, 1117.67 KW Approved vide DN paid on 23-09-15. Un Ripe 31-03-2015 136-C Peoples Colony, Faisalabad. O/O No. Feeder under const. with Peoples Colony 26/1369-76 dt. PD (Const). WTR, I.C. of 24-08-15 Metering Panel, Grid Panel and transformer awaited STATUS OF PENDING C-2 EXTENSION OF LOAD CASES 30-09-2019 2ND CIRCLE FESCO FAISALABAD 1 69/C-2/Ext. SDO (MES) PAKISTAN AIR FORCE, 200 + 300 = Approved vide DN paid on 16-10-2018 Un Ripe 08-12-2017 Risalawala, Faisalabad 500 KW O/O No. Feeder under const. with Nazimabad 106/1104-09 dt. PD (Const). WTR, I.C. of 06-09-18 transformer awaited

STATUS OF PENDING CHANGE OF NAME CASES UPTO 30-09-2019 2ND CIRCLE FESCO FAISALABAD 1 17/B-3/CON 03- SUN SHINE BOARDS, 987 KW Cancelled vide memo Cancelled on 26- 08-2018 Chak No. 67/JB Faisalabad. No. 6805-07 dt. 26-09-19 09-2019 Nazimabad 28-13215-5501484 R. due to failing to attend the observation within speciied period. STATUS OF PENDING NEW CONNECTION UNDER TARIFF A-3 UPTO 30-09-2019 2ND CIRCLE FESCO FAISALABAD

Page 7 of 10 1 07/A-3/Ext. GOVT GENERAL HOSPITAL, 2460.185 Submitted for approval Un Ripe 16-05-2019 Chak No. 224/RB, Faisalabad. KW Peoples Colony

STATUS OF PENDING B-3 NEW CONNECTION CASES UPTO 30-09-2019 JHANG CIRCLE FESCO JHANG 1 111/B-3/New ILYAS & SONS WOOD INDUSTERIES 4750 KW Estimate and sketch has Un Ripe 20-05-2019 (PVT) LIMITED, been sent to XEN (C) Darya Khan FESCO Jhang for vetting Moaza Fazil MM Road Kaloorkot Bhakkar vide memo No. 5470 dt. 29-07-2019. Estimate and sketch has been sent to XEN (C) FESCO Jhang for vetting vide memo No. 5470 dt. 29-07-2019. 2 112/B-3/New KASHMIR WOOD INDUSTERIES (PVT) 4600 KW Estimate and sketch has Un Ripe 30-05-2019 LTD, been sent to XEN (C) Darya Khan FESCO Jhang for vetting Moaza Fazil MM Road Kaloorkot Bhaakar vide memo No. 5470 dt. 29-07-2019. STATUS OF PENDING B-3 EXTENSION OF LOAD CASES UPTO 30-09-2019 JHANG CIRCLE FESCO JHANG 1 104/B-3/Ext. HASSAN LTD, 8- 2880 + 2010 Approved vide DN paid on 23-05-2014 Un Ripe 03-09-2013 Km Samundri Road Gojra. = 4890 KW O/O no. Feeder under Gojra 24-13332-5207800 U 84/2723-28 dt. construction with PD 25-04-14 (Const). 2 279/B-3/Ext. HAR TEXTILE MILLS (PVT) LTD, 1876 + 274 Approved vide DN paid on11-07-18. Ripe 01-03-2018 Fatehabad Near Nia Lahore = 2150 KW O/O No. Committee constituted Gojra 79/5578-83 dt. for energization of 28-13334-5400900 R 12-06-18 connection vide O/o No. 125/3102-06 dt. 30-11-18 3 318/B-3/Ext. MAQBOOL TEXTILE MILLS LTD, 2090 + Sketch and estimate sent Un Ripe 12-06-2019 7-Km Rajana Road Pirmahal 414.93 = XEN(C) for verification Kamalia 2504.93 KW on 04-09-2019. 28-13334-5400900 R STATUS OF PENDING C-2 EXTENSION OF LOAD CASES 30-09-2019 JHANG CIRCLE FESCO JHANG 1 61/C-2/Ext. UAF SUB CAMPUS T.T.SINGH 143 + Approved vide DN paid on 08-03-16. Un Ripe 07-09-2015 1178.63 = O/O no. Feeder under Kheekha Road T.T.Singh. T.T.Singh 1321.63 KW 109/5123-30 dt. construction with PD 24-13322-5201106 R 17-02-16 (Const). 2 70/C-2/Ext. GE (AIR) PAG BASE RAFIQUI, 2400 + 2400 Approved vide DN paid on 27-06-18. Un Ripe 05-03-2018 = 4800 KW O/O No. 88/356- Reconductoring from Shorkot Cantt. 24- T.T.Singh 61 dt. 27-07-18 Dog to Double Circuit 13328-5101800 U. osprey line of exisitng feeder under construction with PD (Const).

STATUS OF PENDING CHANGE OF NAME CASES UPTO 30-09-2019 JHANG CIRCLE FESCO JHANG 1 19/B-3/CON 27- HAR FIBRES (PVT) LTD, 2150 KW Under process Un Ripe 09-2019 Gojra 41-Km Faisalabad Jhang Road, Fatehabad near Nia Lahore 28-13334-5400900 R. STATUS OF PENDING B-4 NEW CONNECTION CASES UPTO 30-09-2019 JHANG CIRCLE FESCO JHANG 1 35/B-4/New PAK ARAB REFINERY CO LTD, 5003 KW Approved vide Principal approval Un Ripe 11-08-2016 PARCO pumping station No. 6, Kot Bahador O/o No. 4887- accorded for constrcution Sultan Bhu ShahTehsil Shorkot District Jhang. 93 dated 30-06- of grid stion 17. STATUS OF PENDING B-3 NEW CONNECTIONS UPTO 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA

Page 8 of 10 1 94/B-3/New AGRITECH LTD, 4900 KW Approved vide DN paid on 08-03-19. Un Ripe 15-08-2018 Daud Khel Skanadarabad, Mianwali O/O No. Feeder under Daud Khel 22/1295-1302 construction with dt. 19-02-19 PD(Cost).WTR and IC of grid panel and tranformer awaited. 2 113/B-3/New ARYOOP RICE MILL, 700 KW Submitted for approval Un Ripe 09-07-2019 06-Km Muzaffar garh Road Jauharabad District Jauharabad Khushab STATUS OF PENDING B-3 EXTENSION OF LOAD CASES UPTO 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA 1 299/B-3/EXT. JADEED FARMS (PVT) LTD, Lak More 493.61 Approved vide DN paid on 12-04-2019. Un Ripe 01-02-2019 near Sui Gas Plant, Sargodha. 24-13466- +160.39 = O/O No. IC Panal and T/F Sargodha-3 5700504 R. 654 KW 27/2574-80 dt. awaited WTR sent to 04-04-19 XEN (O) for verification on 25-4-19. 2 302/B-3/Ext. CITRO PAK LIMITED, 2365 + Approved vide DN paid on 12-07-19. Un Ripe 19-02-2019 Chak No. 84/Janubi, Lahore Road, Sargodha. 2334.10 = O/O No. Double Circuit line of 11 Sargodha-II 24-13424-5402200 R 4699.10 KW 54/4229-35 dt. KV Citro Pak feeder 08-07-19 under construction with PD (Cost). STATUS OF PENDING C-2 NEW CONNECTION CASES UPTO 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA 1 28/C-2/New ARMY CAMP SODHI, 4000 KW Approved vide Committee constituted Ripe 09-02-2007 Sodhi Jaywali, Khushab O/O No. for energization of Jauharabad 145/5530-34 dt. connection vide O/o No. 24-06-09 45/2082-85 dt. 26-03-15.

2 65/C-2/New UNIVERSITY COLLEGE OF 800 KW Approved vide DN paid on 21-03-2018. Un Ripe 14-04-2017 ENGINEERING & TEECHNOLOGY, O/O no. 12/611- Reminder sent on 01-08- Sargodha 17 dt. 31-01-18 19 for subbmission of Chak No. 51/NB Sargodha WTR and IC of panels and transformer. 3 67/C-2/New GARRISON ENGINEER (ARMY) CMH 1000 KW Approved vide DN paid on 16-02-18. Un Ripe 09-10-2017 SARGODHA, O/O No. 19/940- Feeder under const. with Sargodha 46 dt. 16-02-18 PD (Construction). Cantt Sargodha. 4 72/C-2/New GARRISON ENGINEER PAF BASE 2000 KW Submitted for approval Un Ripe 03-12-2018 MUSHAF NEAR MAIN GUARD ROOM, Sargodha (PAF FEEDER) Cantt Sargodha. 5 73/C-2/New GARRISON ENGINEER PAF BASE 1000 KW Submitted for approval Un Ripe 03-12-2018 MUSHAF NEAR MAIN GUARD ROOM, Sargodha SHAHEEN FEEDER) Cantt Sargodha. STATUS OF PENDING C-2 EXTENSION OF LOAD CASES UPTO 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA 1 50/C-2/Ext./COL DHQ HOSPITAL, KHUSHAB 303.350 + Approved vide DN paid on 20-08-14 Ripe 02-06-14 Jauharabad. 216.65 = O/O no. Committee constituted Jauharabad 520 KW 152/4908-15 dt. for energization of 25-06-14 connection vide O/o No. 117/2140-44 dt. 17-10- 2018 2 51/C-2/Ext. UNIVERSITY OF SARGODHA 901.04 + Approved vide DN paid on 29-04-15. Un Ripe 04-06-14 Sargodha. 1217.65 = O/O No. Feeder under const. with Sargodha 24-13423-5316600 U 2118.69 KW 176/6858-69 dt. PD (Const). 12-09-14 3 71/C-2/Ext. CENTRAL AMMUNITION DEPOT, 1000 + 1000 Approved vide DN paid on 18-10-2018. Ripe 24-04-18 Sargodha. = 2000 KW O/O No. Committee constituted Sargodha-II 24-13428-5814600 U 108/1453-58 dt. for energization of 18-09-18 connection vide O/O no. 52/4645-49 dt 26-06- 2019. 4 74/C-2/Ext. GE (AIR) PAF COLONY MIANWALI 2460 + 920 Single line diagram and Un Ripe 04-03-19 28-13451-5100100 U = 3380 KW node to node data Mianwali awaited from XEN(O). Reminder sent on 24-09- Page 9 of 10 2019 5 75/C-2/Ext. GE (AIR) PAF BASE MIANWALI 2400 + 1031 Single line diagram and Un Ripe 04-03-19 28-13451-5100200 U = 3431 KW node to node data Mianwali awaited from XEN(O). Reminder sent on 24-09- 2019 STATUS OF PENDING C-2 REDUCTION OF LOAD CASES 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA 1 63/C-2/ROL CHASHMA HYDEL POWER STATION. 650 KW out Under objections of tariff Un Ripe 09-08-16 Mianwali of 19800 raised by GM(T). Mianwali 24-13456-5600400 U KW

2 64/C-2/ROL CHASHMA HYDEL POWER STATION. 3740 KW Under objections of tariff Un Ripe 09-08-16 Mianwali out of 19800 raised by GM(T). Mianwali 24-13456-5600400 U KW

3 64A/C-2/ROL CHASHMA HYDEL POWER STATION. 200 KW out Under objections of tariff Un Ripe 09-08-16 Mianwali of 19800 raised by GM(T). Mianwali 24-13456-5600400 U KW

STATUS OF PENDING C-3 REDUCTION OF LOAD CASES UPTO 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA 1 16/C-3/ROL CHASHMA NUCLEAR POWER 36-18 = 18 Approved vide WTR and IC of Electric Un Ripe 22-11-2016 PROJECT UNIT-3. MW O/o No. 01/04- Inspector is awaited Mianwali 14 dt. 02-01-16 PAEC Colony Chashma Mianwali. STATUS OF PENDING C-3 NEW CONNECTIONS CASES UPTO 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA 1 15/C-3/New CHASHMA NUCLEAR POWER 18 MW Approved vide WTR and IC of Electric Un Ripe 21-11-2016 PROJECT UNIT-4. O/o No. 02/15- Inspector is awaited Mianwali 25 dt. 02-01-16 PAEC Colony Chashma Mianwali. 2 17/C-3/New PAKISTAN ATOMIC ENERGY 70 MW Approved vide DN paid on 31-08-2017 Un Ripe 28-11-2016 COMMISSION, O/O No. 4429- and 20-10-2017. Grid Sargodha 30 dt. 09-06-17 station is under 04-Km Wan Bachrian Harnoli Road Mianwali. construction. STATUS OF PENDING B-4 EXTENSION OF LOAD CASES UPTO 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA 1 34/B-4/Ext. FLYING CEMENT COMPANY 24811.52 + Approved vide Principal approval Un Ripe 11-08-2016 LIMITED, 24830.10 = O/O No. 1149- accorded for Jauharabad 49642.10 56 dt. 07-09-18 enhancement of grid 25-KM Lilla Interchange (LHR-ISB Motorway) KW station capacity. Mangwal District Khushab. 24-13442- 5204101 2 36/B-4/Ext. MAPLE LEAF CEMENT FACTORY 40 + 10 = 50 Letter written to PD Un Ripe 08-06-2017 LIMITED, MW (GSC) for preparation of Mianwali estimate on 29-07-19. Sakandarabad District Mianwali. 24-13453-5300102 STATUS OF PENDING EXTENSION OF LOAD CASES UNDER TARIFF A-3 UPTO 30-09-2019 SARGODHA CIRCLE FESCO SARGODHA 1 06/A-3/Ext. THQ HOSPITAL PIPLIAN, 85 + 515 = Estimate and sketch sent Un Ripe 04-12-2018 Piplian Mianwali. 600 KW to XEN(C) Jhang for Mianwali 24-13456-5600302 U. vetting vide memo No.