Scope of Services Template

Scope of Services Template

SEPTEMBER 2019 EXHIBIT A DRAFT SCOPE OF SERVICES FOR I-4 FLORIDA’S REGIONAL ADVANCED MOBILITY ELEMENTS (FRAME) SYSTEMS MANAGER CONSULTANT FINANCIAL PROJECT ID(S). 445362 1 32 01 DISTRICT SEVEN HILLSBOROUGH, POLK, OSCEOLA AND ORANGE COUNTIES FPN: 445362 1 32 01 1 PURPOSE __________________________________________________________34 2 PROJECT DESCRIPTION ___________________________________________36 2.1 Project General and Roadway (Activities 3, 4, and 5) ___________________37 2.2 Drainage (Activities 6a and 6b) (Not applicable to this project) ___________38 2.3 Utilities Coordination (Activity 7) __________________________________38 2.4 Environmental Permits, Compliances, and Environmental Clearances (Activity 8) __________________________________________________________40 2.5 Structures (Activities 9 – 18) ______________________________________40 2.6 Signing and Pavement Markings (Activities 19 & 20) (Not applicable to this project) ______________________________________________________40 2.7 Signalization (Activities 21 & 22) __________________________________40 2.8 Lighting (Activities 23 & 24) (Not applicable to this project)_____________41 2.9 Landscape Architecture (Activities 25 & 26) (Not applicable for this project) 41 2.10 Survey (Activity 27) _____________________________________________41 2.11 Photogrammetry (Activity 28) (Not applicable to this project) ____________41 2.12 Mapping (Activity 29) ___________________________________________41 2.13 Terrestrial Mobile LiDAR (Activity 30) (Not applicable to this project) ____41 2.14 Architecture (Activity 31) (Not applicable for this project) ______________41 2.15 Noise Barriers (Activity 32) (Not applicable to this project) ______________41 2.16 Intelligent Transportation Systems (Activities 33 & 34) _________________41 2.17 Geotechnical (Activity 35) ________________________________________46 2.18 3D Modeling (Activity 36) (Not applicable to this project) ______________46 2.19 Project Schedule ________________________________________________46 2.20 Submittals _____________________________________________________47 2.21 Provisions for Work _____________________________________________47 3 PROJECT COMMON AND PROJECT GENERAL TASKS _______________54 Project Common Tasks _______________________________________________54 Project General Tasks ________________________________________________56 3.1 Public Involvement __________________________________________56 3.1.1 Community Awareness Plan (Not applicable to this project) _____________57 3.1.2 Notifications (Not applicable to this project) __________________________57 3.1.3 Preparing Mailing Lists (Not applicable for this project) ________________57 3.1.4 Median Modification Letters (Not applicable to this project) _____________57 3.1.5 Driveway Modification Letters (Not applicable to this project) ___________57 3.1.6 Newsletters (Not applicable to this project) ___________________________57 3.1.7 Renderings and Fly-Throughs (Not applicable to this project) ____________57 3.1.8 PowerPoint Presentations _________________________________________57 3.1.9 Public Meeting Preparations (Not applicable to this project) _____________57 A-2 FPN: 445362 1 32 01 3.1.10 Public Meeting Attendance and Follow-up (Not applicable to this project) _57 3.1.11 Other Agency Meetings _________________________________________57 3.1.12 Web Site (Not applicable to this project) ___________________________57 3.2 Joint Project Agreements (Not applicable to this project) ________________57 3.3 Specifications Package Preparation _________________________________57 3.4 Contract Maintenance and Project Documentation _____________________58 3.5 Value Engineering (Multi-Discipline Team) Review (Not applicable to this project) ______________________________________________________58 3.6 Prime Consultant Project Manager Meetings _________________________58 3.7 Plans Update (Not applicable for this project) _________________________58 3.8 Post Design Services ____________________________________________58 3.9 Digital Delivery ________________________________________________59 3.10 Risk Assessment Workshop (Not applicable to this project) ______________59 3.11 Railroad, Transit and/or Airport Coordination_________________________59 3.11.1 Aeronautical Evaluation ________________________________________59 3.12 Landscape and Existing Vegetation Coordination (Not applicable for this project) ______________________________________________________59 3.13 Other Project General Tasks (Not applicable to this project) _____________59 4 ROADWAY ANALYSIS ______________________________________________59 4.1 Typical Section Package (Not applicable for this project)________________60 4.2 Pavement Type Selection Report (Not applicable for this project) _________60 4.3 Pavement Design Package (Not applicable to this project) _______________60 4.4 Cross-Slope Correction (Not applicable to this project) _________________60 4.5 Horizontal/Vertical Master Design Files (Not applicable to this project) ____60 4.6 Access Management (Not applicable to this project) ___________________60 4.7 Roundabout Evaluation (Not applicable to this project) _________________60 4.8 Roundabout Final Design Analysis (Not applicable to this project) ________60 4.9 Cross Section Design Files (Not applicable to this project) ______________60 4.10 Temporary Traffic Control Plan (TTCP) Analysis _____________________60 4.11 Master TTCP Design Files ________________________________________61 4.12 Selective Clearing and Grubbing ___________________________________61 4.13 Tree Disposition Plans (Not applicable to this project) __________________61 4.14 Design Variations and Exceptions __________________________________61 4.15 Design Report (Not applicable to this project) ________________________62 4.16 Quantities _____________________________________________________62 4.17 Cost Estimate (Not applicable to this project) _________________________62 4.18 Technical Special Provisions and Modified Special Provisions ___________62 4.19 Other Roadway Analyses (Not applicable to this project) ________________62 4.20 Field Reviews (Not applicable to this project) _________________________62 4.21 Monitor Existing Structures (Not applicable to this project) ______________62 4.22 Technical Meetings (Not applicable to this project) ____________________62 4.23 Quality Assurance/Quality Control (Not applicable to this project) ________62 4.24 Independent Peer Review (Not applicable to this project)________________62 4.25 Supervision (Not applicable to this project)___________________________62 4.26 Coordination (Not applicable to this project)__________________________62 A-3 FPN: 445362 1 32 01 5 ROADWAY PLANS and tasks 5.1 – 5.28 are not applicable for this project. ___62 5.1 Key Sheet (Not applicable to this project) ____________________________62 5.2 Summary of Pay Items Including Quantity Input (Not applicable to this project) ______________________________________________________62 5.3 Typical Section Sheets (Not applicable to this project) __________________62 5.4 General Notes/Pay Item Notes (Not applicable to this project) ____________62 5.5 Summary of Quantities Sheets (Not applicable to this project) ____________62 5.6 Project Layout (Not applicable to this project) ________________________62 5.7 Plan/Profile Sheet (Not applicable to this project) ______________________62 5.8 Profile Sheet (Not applicable to this project) __________________________63 5.9 Plan Sheet (Not applicable to this project) ____________________________63 5.10 Special Profile (Not applicable to this project) ________________________63 5.11 Back-of-Sidewalk Profile Sheet (Not applicable to this project) ___________63 5.12 Interchange Layout Sheet (Not applicable to this project)________________63 5.13 Ramp Terminal Details (Plan View) (Not applicable to this project) _______63 5.14 Intersection Layout Details (Not applicable to this project) ______________63 5.15 Special Details (Not applicable to this project) ________________________63 5.16 Cross-Section Pattern Sheet(s) (Not applicable to this project) ____________63 5.17 Roadway Soil Survey Sheet(s) (Not applicable to this project) ____________63 5.18 Cross Sections (Not applicable to this project) ________________________63 5.19 Temporary Traffic Control Plan Sheets (Not applicable to this project) _____63 5.20 Temporary Traffic Control Cross Section Sheets (Not applicable to this project) ______________________________________________________63 5.21 Temporary Traffic Control Detail Sheets (Not applicable to this project) ___63 5.22 Utility Adjustment Sheets (Not applicable to this project) _______________63 5.23 Selective Clearing and Grubbing Sheet(s) (Not applicable to this project) ___63 5.24 Tree Disposition Plan Sheet(s) (Not applicable to this project) ____________63 5.25 Project Network Control Sheet (Not applicable to this project) ___________63 5.26 Environmental Detail Sheets (Not applicable to this project) _____________63 5.27 Utility Verification Sheet(s) (SUE Data) (Not applicable to this project) ____63 5.28 Quality Assurance/Quality Control (Not applicable to this project) ________63 5.29 Supervision (Not applicable to this project)___________________________63 6a DRAINAGE ANALYSIS and tasks 6a.1 – 6a.25 are not applicable for this project._____________________________________________________________63 6a.1 Drainage Map Hydrology (Not applicable to this project) _______________63 6a.2 Base Clearance Calculations (Not applicable to this project) _____________63 6a.3

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    213 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us