Guideline: Vacuum Sewer Systems

Guideline: Vacuum Sewer Systems

FRAUNHOFER-INSTITUT FÜR GRENZFLÄCHEN- UND BIOVERFAHRENSTECHNIK IGB Guideline: Vacuum sewer systems Guideline: Vacuum sewer systems December 2016 Dr.-Ing. Marius Mohr, Jan Iden, Marc Beckett Fraunhofer-Institut für Grenzflächen- und Bioverfahrenstechnik IGB Nobelstraße 12 70569 Stuttgart Content 1 Introduction ........................................................................................................... 1 2 Technology of vacuum sewer systems ................................................................ 4 2.1 Concept ................................................................................................................... 4 2.2 Components and their tasks..................................................................................... 5 2.3. Manufacturers / System providers .......................................................................... 21 3. Investment costs ................................................................................................. 25 4. Operation and Maintenance costs ..................................................................... 29 4.1. Electricity costs ....................................................................................................... 30 4.2. Personnel cost ........................................................................................................ 31 4.3. Material cost .......................................................................................................... 33 4.4. Other costs ............................................................................................................ 34 5. Durability (life span/life cycle) ........................................................................... 35 6. Operational and maintenance skills required .................................................. 38 6.1. Normal and preventive maintenance ...................................................................... 38 6.2. Emergency maintenance ........................................................................................ 41 6.3. Record keeping ...................................................................................................... 42 6.4. O&M manual ......................................................................................................... 44 6.5. Spare parts ............................................................................................................. 45 6.6. Summary................................................................................................................ 45 7. User friendliness .................................................................................................. 46 8. Cases for application ........................................................................................... 49 9. Reference projects ............................................................................................... 50 10 Vacuum sewers as part of an integrated water management concept ......... 54 11. Critical issues for building and operating a vacuum sewer system ............... 61 11.1. Pros and Cons ........................................................................................................ 61 11.2. Critical features ...................................................................................................... 62 11.2.1. General .................................................................................................................. 62 11.2.2. Collection pits ........................................................................................................ 63 11.2.3. Interface valve ........................................................................................................ 64 11.2.4. Vacuum lines / network .......................................................................................... 64 11.2.5. Vacuum station ...................................................................................................... 65 12. Summary & conclusion ....................................................................................... 67 References ........................................................................................................................... 69 Annex 1: ............................................................................................................................ 73 Annex 2: ............................................................................................................................ 76 Annex 3: ............................................................................................................................ 78 Annex 4: ............................................................................................................................ 79 Fraunhofer IGB Vacuum sewer system GIZ GmbH I | IV List of Figures Figure 1: Overview of a vacuum sewer system involving the vacuum valve unit at the valve pits, vacuum mains and the central vacuum station [8] 5 Figure 2: Left: Schematic layout of a collection pit with vacuum valve ; Right: prefabricated collection pit . 6 Figure 3: Vacuum valve [12] 8 Figure 4: Valve pit with two interface valves to accommodate higher discharges [5]. 9 Figure 5:Hierachy of pipes within a vacuum sewer system and the corresponding pipe diameters [5]. 10 Figure 6: Saw-tooth profile of a vacuum sewer line [5] 11 Figure 7: Filling material of excavation for a vacuum line. Trenching material in the top layer, followed by a layer of gravel and a liner which separates the gravel from the sand [7] 13 Figure 8: Division valve with gauge tap at a vacuum main [5] 13 Figure 9: Service lateral connection [1]. Note that the diameter of der service lateral is equal to the diameter of the interface valve (= 3 inch = 7.6 cm). Pipes should be joined at the upper part of the receiving pipe at an angle of 60° 15 Figure 10: The vacuum station can be designed with high flexibility. Anything from prefabricated houses to underground stations which are integrated into the environment exists [12]. 16 Figure 11: All vacuum pumps are connected to the same pipe. The pumps are setup in parallel. 17 Figure 12: Layout of a vacuum station with the collection tank in the ground and the sewage pumps outside of the tank. The vacuum reservoir tank is integrated into the collection tank in most layouts[5, 14] 18 Figure 13: Biofilter used for odour control from a vacuum tank. Right: woodchips are a common filling material [1] 19 Figure 14:Vacuum station with external power connection for power supply in case of blackouts [12] 20 Figure 15: Comparison of elements most susceptible to failure in different sewer systems; diagram based on [26] 47 Figure 16: Reconditioning time for different sewer systems [26] 48 Figure 17: Number of vacuum sewer projects implemented by ROEDIGER and AIRVAC (now Aqseptence Group) between 1973 and 2008 [28] 51 Figure 18: Vacuum pipe installed in existing channels; the PE pipe is attached to the wall of the channel [46]. 54 Fraunhofer IGB Vacuum sewer system GIZ GmbH II | IV Figure 19: Layout of the sanitation and reuse concept in Outapi, Namibia [39]. 56 Figure 20: Schematic overview on how water management was designed in DEUS 21 with vacuum sewers being the selected technology for wastewater conveyance [40] 57 Figure 21: Left: Garbage disposal unit in kitchen sink; Right: Vacuum toilet [1] 58 Figure 22: Black water and grey water are separately collected in separate collection sumps within the same collection pit of the vacuum system [43] 59 Figure 23: Vacuum station in Böblingen-Dagersheim 79 Figure 24: Collection pit in Waldsee. Access is restricted due to construction of wooden terrace. Access to the collection pit should be kept clear. 79 Figure 25: Vacuum tank placed in hedge in Waldsee. The components of the vacuum station have been integrated in the hedge instead of a building. 80 Figure 26: Collection pit with vacuum valve in Walldorf. The collection pit is located on a drivable road made of concrete. Respective measures were implemented. 80 Figure 27: Vacuum tank constructed underground at the vacuum station in Walldorf. The relevant pipe connections and sensor provisions are located at the top of the tank. 81 Figure 28: Biofilter with additional aeration pipe at the vacuum station in Walldorf. Plants grow on the filter material. 81 Figure 29: Vacuum tank at the vacuum station in Knittlingen. The wastewater pumps are placed outside the tank. 82 Fraunhofer IGB Vacuum sewer system GIZ GmbH III | IV List of Tables Table 1: Pipe diameters and the relation to maximum flow per minute and maximum number of served households (data from [3]) 11 Table 2: Approximate investment costs for selected components of vacuum sewers under conditions in Germany 26 Table 3: Cost of PE and PVC-U pipes per meter for different diameters under German market conditions; note that material for PE is more expensive but the prices for PVC pipes include solvent welding (not included for PE) and are thus higher [18] 27 Table 4: Costs which can vary significantly by region and affect the investment costs 28 Table 5: Selected tasks and their approximate duration (values based on experiences in Germany and the USA) 32 Table 6: Approximate material costs for selected components of vacuum sewers 34 Table 7: Potential other costs related to O&M of vacuum sewers 35 Table 8: Durability of major components of a vacuum sewer network [2, 10, 12, 12, 18, 23, 24] 36 Table 9: Overview of normal and preventive maintenance tasks and their frequencies

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    88 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us