Care of Churches and Ecclesiastical Jurisdiction Measure 1991

Care of Churches and Ecclesiastical Jurisdiction Measure 1991

Diocesan Advisory Committee for the Care of Churches AGENDA ______________________________________________________________________________ ______________________ There will be a meeting of the Diocesan Advisory Committee At Jubilee House, Southwell on Monday 11 March 2019 at 12.30pm for 1.30pm [papers and plans will be on display from 12.30pm] [sandwiches, biscuits, tea & coffee will also be available] Mr J Pickett DAC SECRETARY A G E N D A 1 PRAYERS 2 APOLOGIES 3 MINUTES The minutes of the Meeting held on Monday 11 February 2019 to be confirmed and signed. 4 CONFLICTS OF INTEREST 5 MATTERS ARISING from the Minutes a) 014DF Beckingham All Saints [Grade II* - 12th Century] Architect: Mr G W Smith Local Authority: Bassetlaw To undertake repairs to the Chancel wall and the East Window - AA 3/9/2018 1 To undertake urgent repairs to the east and south walls of the Chancel and the repair and refitting of the East window 2 East Window: Whilst the lead matrix of the window remains reasonably firm in situ, the removal of all the panels for structural masonry works will compromise the strength of the panels. 3 The dismantling and re-leading of the panels will allow the long-term repair of the large number of cracks thal resulted from the bomb damage in 1941 and will enable the elimination of the structural rifts in the panels. 4 To replace the existing ferrous tie-bars with new architectural brass tie-bars 5 To re-fix the wire guards with new stainless steel fixings and screws. 6 On completion of the conservation works a standard post-conservation report to be produced. The report to detail the treatments used and the extent of any interventions, a care and maintenance plan, and a photographic record of the project 7 Structural Repairs: to provide restraining rods to the east, north and south walls at upper level of the chancel as per drawings; piles designed to meet the conditions obtained in investigation of the ground conditions recently completed 8 Chancel Repairs: After an agreed period of time, possibly six months after completion of the structural works, to re-plaster the internal walls in an approved lime based plaster specification 9 After a further period of six months to assess the walls and then if in a satisfactory condition to re-decorate the plaster wall surfaces in a lime finish; rake out and re-point external cracked and open joints 10 All in accordance with Report on Structural Movement dated 1 February 2018 and schedule as per letter dated 3 January 2019 from Mr G W Smith, Church Architect and drawings & specifications P463/10, 11 & 12 dated Dec 2018 from Capstone Consulting Engineers, Buxton, Derbyshire and Site Investigation Report dated 30 November 2018 from Geo Investigate, Stokesley, Nth Yorkshire b) 113T Mansfield St John the Evangelist [Grade II - 1856] Architect: Mr P C Rogan Local Authority: Mansfield Doors to Store Room - AA 28/1/2019 1 To fit oak faced wooden doors and frame to arched entrance way of new store room at the east end of the north aisle 2 Doors and frame to be oak faced to match existing inner entrance doors to south porch 3 Fit 1 pair of oak faced FD30 doors and 1no softwood frame constructed to cover existing hooks 4 Clad with oak on a softwood frame and fit with a 5 lever mortice sash lock and lever hook handles to match existing 5 All in accordance with drawing provided by Mr Peter Rogan, Church Architect and quotation dated 17 May 2017 from Beech Wood Joinery, Mansfield, Notts c) 114M Mansfield St Lawrence [Grade II - 1909] Architect: Mr. C J Moxon Local Authority: Mansfield Toilet & Tea Bar - IC 28/1/2019 To report on a visit by Carl Andrews, Jonathan Pickett, Revd Bronwen Gamble and th Roger Howes on Monday 25 February. d) 048BX Cropwell Bishop St Giles [Grade I - 13th Century] Architect: Mr C Andrews Local Authority: Rushcliffe Garden of Remembrance - AA 29/1/2019 1 To set aside an additional Garden of Remembrance to the north of the church 2 Rows of spaces to run parallel with the north aisle, each approx 20" wide x 24" deep to accommodate 43 plots 3 Memorial plaques in individual spaces to be 12" square to be set slightly below ground level; plaques to be dark granite, with plain of gold inscriptive lettering as existing Garden of Remembrance 4 A buried receptacle for flowers to be located behind the main sign for the Garden of Remembrance 5 Box bushes to be planted at the outer corners of the plot as per the plan 6 A stone to be provided bearing the words "Garden of Remembrance", positioned as per the plan approx 2000 x 160mm, to match the existing area 7 Interments will be recorded on the plan and in the burial record book 8 The plan to allow space for a bench, to have a simple brass plaque with the inscription "In memory of loved ones" 9 All in accordance with plans, photograph and Statement of Significance provided e) 139BH Nottingham St Peter with St James [Grade I - 12th Century] Architect: Mr P C Rogan Local Authority: Nottingham Dais & West End Porch - IC 8/1/2019 Visit by Jonathan Pickett, Mark Goodwill-Hodgson, Revd Bronwen Gamble, Revd David Stevenson on Tuesday 26th February. 6 NEWARK ARCHDEACONRY 6.1 FACULTY APPLICATIONS a) 039H Hayton St Peter [Grade I - 12th Century] Architect: Mr. C J Moxon Local Authority: Bassetlaw Stonework Repairs (List B) 28/1/2019 1 To undertake repairs to the stonework as identified in the latest Quinquennial Report 2 Nave: undertake patch pointing as specified; replace badly eroded stones as specified; 1 no ashlar stone replacement; repoint crack to south side of window; repoint around west window and to sill 3 Replace any hard-cementitious mortar with a lime mortar; minor repoint to buttress 4 Undertake a mortar repair to badly eroded stone on the string course on the west wall of the porch and 3 sq.m of pointing at low level 5 Chancel: reset bottom two stones and repoint bottom three at east end of chancel; rebed a total of 9 linear metres of ridge tiles 2 6 Rack out and repoint 13.5 sq.m of badly eroded mortar to a large area of field stones; approx 10 stone replacements and galleting where required 7 Check condition of delaminating stone, allow for repair/replacement; repair mortar flashing with LHL5 mortar 8 Reinstate stone cross at east wall chancel 9 All in accordance with specification and quotations dated 24 February 2018 and 2 March 2018 from Benchmark Brickwork and Masonry, Walkeringham, Notts b) 058K Syerston All Saints [Grade II - 13th Century] Architect: Mr J Keays Local Authority: Newark & Sherwood Tower Repairs (List B) 8/2/2019 1 To undertake repairs to the perished lead on the tower 2 Remove damaged lead and fix 600mm code 5 lead 3 All internal and external corners to be welded; seal all cover flashings with 3:1:1 sand/cement/lime mix 4 All in accordance with quotation dated 7 November 2018 from Brian Wallace Roofing Contractor, Balderton, Newark c) 059F Eastwood St Mary [Unlisted, but in conservation area - Reb 1967] Architect: Mr M Stewart Local Authority: Broxtowe Refurbishment to the Toilet and Kitchen Areas 9/2/2019 1 To redesign the toilet area at the front of the church and refurbish and extend the kitchen area to the Parish Room and install new suspended ceilings 2 Kitchen: remove existing partition between hall and kitchen and enlarge as per plan 3 Strip out existing kitchen and install new Howdens kitchen complete with cooker range and all electrical and plumbing connections as required 4 Walls to be clad in Altro Whiterock with flooring in non-slip Poly floor vinyl; paint in two coats mould resistant matt emulsion; to all joinery, prime, undercoat and gloss 5 Toilets: remove all sanitaryware and pipework from existing washrooms and take down cubicles and radiators 6 Erect partitions as per plan and form 4 no cubicles and include for 1 to be access compliant; erect 2 no stud walls either side of new washrooms to facilitate new radiators in lobby area 7 Supply and install new toilet pans and concealed cisterns to 3no cubicles with wash hand basins and connect to existing drainage 8 No 4 cubicle to be fitted with doc M pack with wall hung baby change unit and radiator 9 Supply and install suspended ceiling throughout washrooms to accommodate extraction system and new LED lighting to new washroom areas 10 Supply and fit new cubicle doors fitted with indicator latches; tile all new surfaces to washrooms; supply and install new flooring with non-slip Poly floor with 100mm upstand around perimeter 11 Decorate all new surfaces; all lighting to be operated by movement sensors 12 Ceilings: Main ceiling; supply and install approx 72 sq.m of suspended ceiling grid and tiles complete with 10 no LED lights and 25mm acoustic insulation above 13 Annex ceiling: supply and install approx 35sq.m of suspended ceiling grid and tiles complete with 6 no LED lights and 25mm acoustic insulation 14 Windows: install 4 no high level frames with fixed lights and 4 no additional frames with openers as existing 15 All in accordance with quotations dated 5 and 8 February 2018 from Eastwood Joinery & Building Services, Eastwood, Nottingham; specification dated 31 July 2018 from Mr M Stewart, Church Architect and quotation dated 8 February 2018 from Darren Terry Windows. d) 208BX Thurgarton St Peter [Grade I - 13th Century] Architect: Mr M Goodwill-Hodgson Local Authority: Newark & Sherwood Handrail and Grab Bar 12/2/2019 1 To install a grab bar for the single external step at the door of the north porch and a handrail to the internal steps at the interior door of the north porch 2 Both to be painted gloss black and to match existing detailing

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us