Rimutaka Incline Railway Heritage Trust Annual Report 2016–2017 Passenger service within Rimutaka Incline Railway’s Maymorn yard. Photo: Grant Morrell. Adopted: 18 October 2017 Chairperson's Report The predominant physical project work for the Trust during 2016-2017 were focused on developing railway facilities at Maymorn, 6km northeast of Upper Hutt. In the future this will be the departure point for heritage train services that the Trust proposes to operate over the former railway route between Upper Hutt and Featherston. Maymorn station is ideally situated, connected to Upper Hutt, Wellington and the Wairarapa via current Metlink passenger services, and only a short distance from the heritage railway route proper. Facilities at Maymorn currently under development, whilst currently required for the construction phase, will be used without modification for the future railway operation. For example, the rail vehicle shed will store operational locomotives and carriages, and initial railway track being built will become our future mainline. During the year the workshop extension to the rail vehicle shed was closed in and a start made on lining and fitting out. Once the rail vehicle shed and initial track developments are further advanced attention will turn to investigating ways in which to present local railway heritage to the public at the Maymorn site. Developments at Maymorn The Maymorn operational base is important in a number of ways. It is the current focus of volunteer activity, which the Trust is entirely reliant upon for its future. Metlink Wairarapa Connection passenger services service Maymorn, which provides connection to and from Wellington, the Hutt Valley and the Wairarapa — and strategically, a future life-line for tourist visitation to the railway. The facilities under construction at Maymorn will protect the Trust’s current rail vehicle fleet, and facilitate their future restoration, operation and maintenance. Plans have also been prepared and resource consent approved for a large station building incorporating a visitor centre, historic and interpretive displays, and a cafe. These facilities will play a central role in the Trust’s future operations, being the departure point for a journey back in time over the historic Rimutaka Incline. Train Operations We have been offering train rides for the public at Maymorn since 2 October 2013, initially with cab rides in our shunting locomotive and jigger rides. On 11 May 2014 locomotive-hauled train services commenced, catering for around 40 people at a time. A trailer car from the 'Cyclops' electric multiple unit set gives a seating capacity of 50 people per trip. We have continued to offer short rides in our station yard through the year, with a number of exhibits available for viewing in the rail vehicle shed. By the end of the 2016-2017 year we had carried close to 1,000 people on the railway. Entry tickets are sold at the gate at $5 per person or $15 for a family ticket for up to four rides per ticket along with tours of the rail vehicle shed. Passenger operation at Maymorn, 11 September 2016 Rail Vehicle Shed The rail vehicle shed at Maymorn has been the primary project for the Trust over the last seven years. A huge amount of design work, engineering consultation, planning and project management has gone into the structure. Ab 745 and Tr 189 stand outside the Maymorn rail vehicle shed, 2016. The vast majority of the foundation work, component fabrication and final construction has been undertaken by volunteers working in their spare time. The decision to replicate an original 1911 New Zealand Railways 2-road engine shed design has paid dividends in that the Maymorn station has a real railway depot “feel” about it. The building will also complement future heritage railway operations. We are indebted to Rimutaka Charitable Trust, Lottery Grants Board, Wellington Community Trust, Rotary Club of Upper Hutt, Pelorus Trust, Upper Hutt Summer Carnival and a host of other donors for their continued support for the project, with considerable funding put into the rail vehicle shed in particular. Backfilling and compaction to protect and complete foundations of shed. Backfilling foundations along the south wall. Improvements to under foot conditions - completion of stairs and floor at Upper Hutt end of shed. Concrete floor improvements at Kaitoke end of shed. Workshop Workshop train door fit-out, August - September 2016 Train door fully clad and flashings fitted - 15 October 2016 External gutter fitted to the workshop - 25 March 2017. The exterior shell of the rail vehicle shed is nearly complete, gutters and storm water being main work remaining to be done. Servicing facilities and a 15-metre long workshop extension to the south of the main shed are also nearing completion. The workshop is of similar design to the rail vehicle shed and gives the appearance of a 4-road engine shed when viewed end-on. The rationale for the workshop is to provide space for a machine shop for future restoration and maintenance of locomotives, carriages and wagons. There is a window of opportunity to efficiently construct the workshop, dovetailing onto structural work associated with the rail vehicle shed. Volunteers are experienced with the required building work. The workshop is also a condition of the Trust’s Resource Consent for rail activities at Maymorn. Track Building our mainline track through the Maymorn yard towards Kaitoke is a tangible step we can make at this early stage in the railway’s development. The extent of the work achieved has been possible due to a great deal of support from the rail civil engineering industry. We are also fortunate to have Trust members skilled in both project management and track construction to plan and carry out this work. The extension of our future mainline track through the Maymorn station is helping to transform the current construction site into an operational base for our railway. Major donations of track materials received from KiwiRail and Holcim (New Zealand) Limited have been used to extend the mainline at Maymorn station.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages32 Page
-
File Size-