Proposal for Bidding Purposes for the Construction Of

Proposal for Bidding Purposes for the Construction Of

SCOPE OF WORK SKAGIT COUNTY STREET WASTE FACILITY PROJECT #WA402170 This contract provides for the construction of a street waste decant and disposal facility within an existing incinerator building in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The project includes the following: • Demolition and replacement of a portion of the existing tipping floor to create a decant settling area. • Installation of concrete partition walls to separate decant dump areas from decant settling area. • Vertical extension of the existing pit wall to form a concrete push wall at the rear of the decant dump and settling areas. • Installation of a concrete sump and sump pump within the existing refuse pit, and discharge piping connection to an existing wastewater manhole. • Extension of electrical power to sump pump and control panel location, and installation of flow meter on the sump discharge line. • Installation of accessory structures including chain link fence and an access ladder. Schedule: This project will be ready to proceed upon contract execution. Measurement and Payment: Each item will be per the bid proposal. Project Location: 14104 Ovenell Road, Mount Vernon, WA 1 CONTENTS 2 PAGE 3 INTRODUCTION--------------------------------------------------------------------------------------- 1 4 AMENDMENTS TO THE STANDARD SPECIFICATIONS 5 Section 1-01, Definition and Terms ---------------------------------------------------------------- 1 6 Section 1-02, Bid Procedures and Conditions -------------------------------------------------- 2 7 Section 1-03, Award and Execution of Contract ------------------------------------------------ 2 8 Section 1-05, Control of Work ---------------------------------------------------------------------- 2 9 Section 1-06, Control of Material ------------------------------------------------------------------- 2 10 Section 1-07, Legal Relations and Responsibilities to the Public -------------------------- 3 11 Section 1-08, Prosecution and Progress --------------------------------------------------------- 5 12 Section 1-09, Measurement and Payment ------------------------------------------------------- 6 13 Section 3-01, Production From Quarry and Pit Sites ------------------------------------------ 6 14 Section 3-04, Acceptance of Aggregate ---------------------------------------------------------- 6 15 Section 4-06, Asphalt Treated Base--------------------------------------------------------------- 7 16 Section 5-01, Cement Concrete Pavement Rehabilitation ----------------------------------- 8 17 Section 5-02, Bituminous Surface Treatment --------------------------------------------------- 8 18 Section 5-04, Hot Mix Asphalt --------------------------------------------------------------------- 11 19 Section 5-05, Cement Concrete Pavement ---------------------------------------------------- 12 20 Section 6-02, Concrete Structures --------------------------------------------------------------- 13 21 Section 6-03, Steel Structures -------------------------------------------------------------------- 17 22 Section 6-05, Piling ---------------------------------------------------------------------------------- 20 23 Section 6-06, Bridge Railings --------------------------------------------------------------------- 20 24 Section 6-07, Painting ------------------------------------------------------------------------------ 20 25 Section 6-10, Concrete Barrier ------------------------------------------------------------------- 21 26 Section 6-12, Noise Barrier Walls ---------------------------------------------------------------- 22 27 Section 6-13, Structural Earth Walls ------------------------------------------------------------ 23 28 Section 6-14, Geosynthetic Retaining Walls -------------------------------------------------- 23 29 Section 6-15, Soil Nail Walls ---------------------------------------------------------------------- 23 30 Section 6-16, Soldier Pile and Soldier Pile Tieback Walls --------------------------------- 24 31 Section 6-17, Permanent Ground Anchors ---------------------------------------------------- 25 32 Section 6-19, Shafts --------------------------------------------------------------------------------- 25 33 Section 7-02, Culverts ------------------------------------------------------------------------------ 28 34 Section 7-03, Structural Plate Pipe, Pipe Arch, Arch, and Underpass ------------------ 28 35 Section 7-04, Storm Sewers ---------------------------------------------------------------------- 28 36 Section 7-05, Manholes, Inlets, Catch Basins, and Drywells ------------------------------ 29 SKAGIT COUNTY STREET WASTE FACILITY Project No.: WA402170 March 2014 A PAGE 1 Section 7-08, General Pipe Installation Requirements ------------------------------------- 29 2 Section 7-09, Water Mains ------------------------------------------------------------------------ 29 3 Section 8-01, Erosion Control and Water Pollution Control -------------------------------- 29 4 Section 8-02, Roadside Restoration------------------------------------------------------------- 36 5 Section 8-03, Irrigation Systems ----------------------------------------------------------------- 38 6 Section 8-04, Curbs, Gutters, and Spillways -------------------------------------------------- 38 7 Section 8-07, Precast Traffic Curb and Block Traffic Curb --------------------------------- 39 8 Section 8-11, Guardrail ----------------------------------------------------------------------------- 39 9 Section 8-12, Chain Link Fence and Wire Fence -------------------------------------------- 40 10 Section 8-15, Riprap -------------------------------------------------------------------------------- 43 11 Section 8-20, Illumination, Traffic Signal Systems, And Electrical ----------------------- 43 12 Section 8-21, Permanent Signing ---------------------------------------------------------------- 52 13 Section 8-22, Pavement Marking ---------------------------------------------------------------- 55 14 Section 8-25, Glare Screen------------------------------------------------------------------------ 56 15 Section 8-29, Wire Mesh Slope Protection ---------------------------------------------------- 56 16 Section 9-02, Bituminous Materials-------------------------------------------------------------- 58 17 Section 9-03, Aggregates -------------------------------------------------------------------------- 60 18 Section 9-04, Joint And Crack Sealing Materials --------------------------------------------- 62 19 Section 9-05, Drainage Structures, Culverts, and Conduits ------------------------------- 63 20 Section 9-06, Structural Steel and Related Materials --------------------------------------- 65 21 Section 9-07, Reinforcing Steel ------------------------------------------------------------------ 65 22 Section 9-10, Piling ---------------------------------------------------------------------------------- 65 23 Section 9-13, Riprap, Quarry Spalls, Slope Protection, & Rock for Erosion 24 and Scour Protection and Rock Walls ----------------------------------------------------- 66 25 Section 9-14, Erosion Control and Roadside Planting -------------------------------------- 66 26 Section 9-15, Irrigation System ------------------------------------------------------------------- 72 27 Section 9-16, Fence and Guardrail -------------------------------------------------------------- 72 28 Section 9-18, Precast Traffic Curb and Block Traffic Curb --------------------------------- 76 29 Section 9-20, Concrete Patching Material, Grout, and Mortar ---------------------------- 76 30 Section 9-23, Concrete Curing Materials and Admixtures --------------------------------- 76 31 Section 9-26, Epoxy Resins ----------------------------------------------------------------------- 76 32 Section 9-28, Signing Materials and Fabrication --------------------------------------------- 77 33 Section 9-29, Illumination, Signal, Electrical -------------------------------------------------- 77 34 Section 9-34, Pavement Marking Material ---------------------------------------------------- 106 35 Section 9-36, Shaft-Related Materials --------------------------------------------------------- 106 36 SKAGIT COUNTY STREET WASTE FACILITY Project No.: WA402170 February 2014 B PAGE 1 SPECIAL PROVISIONS 2 DIVISION 1 3 GENERAL REQUIREMENTS 4 DESCRIPTION OF WORK ----------------------------------------------------------------------- 108 5 Definitions -------------------------------------------------------------------------------------------- 108 6 BID PROCEDURES AND CONDITIONS ----------------------------------------------------- 110 7 Prequalification of Bidders ------------------------------------------------------------------------ 110 8 Plans and Specifications -------------------------------------------------------------------------- 110 9 Preparation Of Proposal -------------------------------------------------------------------------- 110 10 Delivery of Proposal -------------------------------------------------------------------------------- 111 11 Public Opening Of Proposal ---------------------------------------------------------------------- 111 12 Irregular Proposals --------------------------------------------------------------------------------- 111 13 Disqualification of Bidders ------------------------------------------------------------------------ 112 14 AWARD AND EXECUTION OF CONTRACT ------------------------------------------------ 115 15 Department of Ecology Funding Clauses -----------------------------------------------------

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    289 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us