Sydney Metro Northwest Operations and Maintenance

Sydney Metro Northwest Operations and Maintenance

SYDNEY METRO NORTHWEST OPERATIONS AND MAINTENANCE Sydney Metro Northwest is the first fully automated metro Client: Metro Trains Sydney rail system in Australia and consists of 23 kilometres of newly constructed track from Tallawong Road to Epping and upgrades Year: May 2019 - present for the 13 kilometres of existing rail network between Epping and Chatswood. This upgrade project has also delivered eight Product/Service: new railway stations, 4,000 commuter car parks and a new high Mechanical, Electrical and Instrumentation frequency single deck train system. services – Operations and Maintenance Scope of work Project Delivery Key Benefits • Preventative and corrective maintenance Sydney’s growing North West has one of the on high voltage equipment including highest car ownership levels per household Development and implementation of − 1 x 132kV Switchboard in Australia. The Sydney Metro Northwest comprehensive work packages, permitting and − 21 x 33kV Switchboards upgrade project has provided an alternative isolation procedures − 43 x 11kV Switchboards and RMUs transport option for commuters with trains Enhanced efficiency through seamless − 10 x 1500V Switchboards and RMUs operating every four minutes in the peak with operations handover and technical support at least 15 trains per hour. − 1 x 132/33/11kV Transformer Provision of highly experienced AEO − 10 x 33/0.6kV Traction transformers Having previously delivered commissioning accredited rail subject matter experts − 10 x Rectifiers services on the upgrade project EnerMech − 10 x 33/11kV Transformers was engaged to provide ongoing operations 10-person team provides 24/7 operations and • High voltage switching and maintenance support on Sydney Metro maintenance support • Develop and implement high voltage Northwest. permit procedures and isolation procedures for MTS Our highly experienced AEO accredited team • Develop MTS working procedures of rail subject matter experts have ensured the smooth transition into the operations • Manage high voltage substation access permits phase and continued support through • PCS Commissioning preventative and corrective maintenance campaigns. • 24/7 operations and maintenance support enermech.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us