Thailand's Rail Transport Infrastructure Development Strategy

Thailand's Rail Transport Infrastructure Development Strategy

Thailand’s Rail Transport Infrastructure Development Strategy 2015-2022 Dr.Pichet Kunadhamraks Director of Rail Project Development Office Infrastructure Quality 42 72 56 34 Source: The Global Competitiveness Report, World Economic Forum 2015 Transportation issues in Thailand Time Line of Thailand Railway Modernization (2015-2035) 2035: 2015: Lanuched 8 - Finished final phases double Years Infrastructure tracks finished and 7,XXX km are Modernization Plans in operating - 464 km Metro Lines are in Aug. 2016 Purple Line Open 2022: Yellow, Pink & operating Orange Lines - 4 lines HSR are in operating 2017 Sourth Green Line/ Gold Line 2019: Blue Iine Extension / North Green Line HSR BKK-Rayong 2018: SRT Double Tracks 1st Phase . > 3 MM THB Rail Asset* HSR BKK-Huahin HSR BKK-Chiangmai . > 8% rail transportation sharing 2011: Launched Railway 2020: . 5-8 M person trips daily nd HSR BKK-Korat Modernization Plans - SRT Double Tracks 2 Phase - Red Line Open . Center of ASEAN in railway 2022: Finished Lanuched 8 Years Infrastructure 2017: Launched Modernization Plans Department of Railway & Railway Transportation Act 2016, BBC ranked Bangkok as 2nd most congested city Solutions “Road for Transport People not Vehicles” Bang Sue - Hualumphong 20.8 km Airport Rail Link 28 km Bang Sue – Taling Chan 15 km Taksin Bridge – Bang Wa 7.5 km Onnut - Baring 5.25 km Mo Chit – Onnut National Stadium – Taksin Bridge 24 km 10 Existing Public transport in Bangkok and Metropolitan area Bangkok MRT (Green lines) Opening on December 1999. Transit Type – Heavy rail Total length : 31 kilometers. (2 routes) Ridership : 660,000 passenger-trips/day Existing Public transport in Bangkok and Metropolitan area Bangkok MRT (Blue line) Opening on July 2004. Transit Type – Heavy rail Total length : 20 kilometers. Ridership : 260,000 passenger-trips/working day Existing Public transport in Bangkok and Metropolitan area Airport rail link Opening on August 2010. Connecting Bangkok City Air Terminal and downtown to Suvarnabhumi Airport Transit Type – Heavy rail Total length : 28.5 kilometers. Ridership : 53,000 passenger-trips/working day • Opened to public : on August 6th, 2016 • 21 three-car trainsets from J-TREC 14 Moshit – Kukot (18.4 km) 15% 2020 Bang Sue – Tha Phra – Bang Khae (27 km) 86% 2019 Bearing – Samutprakan (12.8 km) 99% 2018 Bang Sue - Rangsit (26 km) 75% 2020 Operational Status of the current Mass Rapid Transit System Project 17 Nodes Links Outdoor Amphitheatre Area Development Cabinet Approved in 2016 (4 Projects / 112 km) 1 KaeRai- Minburi (34.5 Km.) 4 Bangsue-Hualumpong (8.5 Km.) 4 Bangsue– Phyathai– Huamak (19 Km.) 2 Cultural Center– Minburi (21.5 Km.) 3 Ladpro– Pattanakarn- Samrong (30.4 Km.) 0 2 5 10 กม. Km. 20 Project Details - Straddle monorail - Elevated 34.5 km. and 30 stations Invest Cost 1,522 Million USD Construction May 2017 Start Operation August 2020 Depot & P&R 21 Project Details - Straddle Monorail - Elevated 30.4 km. and 23 stations Invest Cost 1,474 Million USD Construction May 2017 Start Operation August 2020 Depot & P&R 22 Thailand Cultural Centre – Minburi Project Details Underground structure for 12.2 km and 10 Stations Elevated structure for 9 km and 7 Stations Cost 3,133 Million USD Construction February 2017 Start Operation June 2022 23 8 Rangsit - Thammasat University (10 km) 5 Ku Kot - Lamlukka (6.5 km) To be tendered in 2017 (8 projects / 104.3 km) 3 ARL: Donmuang–Phyathai (21.8 Km.) 7 TalingChan-Salaya (14 km) 4 Taling Chan-Cultural Center (17.5 km) Bang Kae–Phutthamonthon Sai 4 2 (8km) 1 Bang sue– Rat Burana (23.8 km) 6 Samutprakan-BangPu 0 2 5 10 กม. (7 km) Km. 24 25 27 28.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    28 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us