Assets & Works

Assets & Works

Assets & Works Infrastructure update Infrastructure ‘FIT FOR THE FUTURE’ ASSET-RELATED PERFORMANCE INDICATORS • Building and Asset Renewal Ratio – currently too low – need to spend more on renewals • Infrastructure Backlog Ratio – currently too high – need to spend more on renewals • Asset Maintenance Ratio – currently too low – need to spend more on maintenance Age of assets CURRENT SITUATION • Many assets require renewal as they were constructed over 30 years ago • Current expenditure on renewals is about a third of the required amount Replacement cost is High Asset Replacement Cost $45,000,000 3% Roads $402,000,000 22% Bridges Footpaths Stormwater $183,000,000 10% Buildings Recreation Facilities $65,000,000 4% $1,013,000,000 56% $97,000,000 5% Renewals are required • Projected Capital Expenditures – Roads and Buildings LTFP - Renewals and 'New' Expenditure Roads and Buildings $40,000,000 $35,000,000 $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $- 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Renewals - Roads Renewals - Buildings New - Roads New - Buildings Gap of funding – safer roads • 1400kms of Sealed road – 14km rebuild, 50 km reseal • Rebuild 100 yrs (life 30 yrs) Reseal 30 yrs (life 15 yrs) Backlog of works • Why do we need to manage Risk ? Level Of Service (LOS) Lowering of LOS 1. Highway traffic 2. Load limited local traffic 3. Pedestrians only 4. No service Road condition Average Road Condition as % of Network (in 2012 – manual inspection) 50 40 30 20 10 % network of 0 1- Very 2- Good 3- Fair 4- Poor 5- Very Good Poor Current roads condition Sealed Road Network Condition 9% 26% 19% Very Poor Poor Average 19% Good 27% Excellent Roads over 30 years old Condition vs Time As New 100 90 80 70 60 50 40 30 20 10 0 Failed 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 Age of road in years Funds to seal “waterproof” roads Condition Distribution - Current Budget 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Very Poor Poor Average Good Excellent Funds spent on patching roads Roads maintenance 2015/2016 Road Maintenance Expenditure $4,000,000 $3,500,000 $3,531,100 $3,000,000 Total expenditure = $8,562,000 $2,500,000 $2,000,000 $1,538,100 $1,500,000 $1,332,400 $1,000,000 $520,400 $513,800 $429,300 $237,100 $222,200 $500,000 $167,700 $69,800 $- Renewal of buildings Maintaining Buildings Milton Theatre Before After Maintaining and renewing priorities BUILDINGS RE-PAINTING • Community Centre, St Georges B (e); RFS, Milton (e); Sanct Pt Youth and Community Centre (e); Amenities, Bomaderry Sporting Complex (e); Club room (potters), Sanct Pt (i); Nowra library (i); Greenwell Pt hall (i); Pavilion, Nowra showground (i) RE-CLADDING • Progress hall, Callala Bay; Boat shed, Carroll Ave, Lake Conjola; Old stables, Muir house, Berry RE-ROOFING • Pavilion – Berry showground; Amenities, Bomaderry oval; Supper room annexe, Nowra School of Arts FLOORING • Cinema – Huskisson; Public hall, Erowal Bay; Cinema, Sussex Inlet Renewing and Risk priorities ROADS – 2017/18 • Milbank Rd, Terara; Jindy Andy Ln, Numbaa; The Wool Rd, Old Erowal Bay • Larmer Ave, Sanctuary Point; Island Pt Rd, St Georges Basin • Bendalong Rd, Conjola • PATHS – 2017/18 • Vincent/Twyford Sts, Vincentia; Deering St, Ulladulla; • Matron Porter Dr, Narrawallee; Yalwal Rd, Nowra; • DRAINAGE – 2017/18 • Nirimba Ave, Sanct Pt; Sussex Inlet Rd, Sussex Inlet; Bendalong Pt; Burrier Rd, Burrier Asset Management Customer Focus Holiday Haven • Holiday Haven Income $21,654,000 (2015/16) • Holiday Haven Expenditure $15,094,000 includes payment of the levy to the Crown in the amount of $1.04M • Balance of $6,562,000 funds works on Crown land • Income from ALL sources involving Crown land $25.4M • Expenditure on maintenance/improving Crown land including parks and reserves - $26.6M Emergency Management • Local Emergency management • Emergency Operations Centre • Combat agencies • Evacuation .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us