![49107-006: West Bengal Drinking Water Sector Improvement Project](https://data.docslib.org/img/3a60ab92a6e30910dab9bd827208bcff-1.webp)
Site-Specific Environmental Management Plan Project number: 49107-006 November 2019 IND: West Bengal Drinking Water Sector Improvement Project – Design and Construction of Intermediate Pumping Station, Ground Storage Reservoirs, Overhead Reservoirs, Water Distribution Networks and Metering Works in Taldangra Block (Zone 18 - OHSR Harmasra) Package No: WBDWSIP/ BK/02BP/02B Prepared by Public Health Engineering Department, Government of West Bengal for the Asian Development Bank. This site-specific environmental management plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Design and Construction of Intermediate Pumping Doc. No. L&T/ SEMP /01 Station, Ground Storage Reservoirs, Overhead Last Revision No. 00 Reservoirs, Water Distribution Networks and Metering Last Revision Date : 00 works in Taldangra Block. Page 1 of 46 (Contract Package No: Original Issue Date : WBDWSIP/DWW/NCB/BK/02B/2018-19) Site Specific Environmental Management Plan Sensitivity: LNT Construction Internal Use Design and Construction of Intermediate Doc. No. L&T/ SEMP /01 Pumping Station, Ground Storage Reservoirs, Last Revision No. 00 Overhead Reservoirs, Water Distribution Last Revision Date : 00 Networks and Metering works in Taldangra Page 2 of 46 Block. Original Issue Date : (Contract Package No: WBDWSIP/DWW/NCB/BK/02B/2018-19) Site Specific Environmental Management Plan Package No Package No :WBDWSIP/ BK/02BP/02B Zone 18- OHSR (Harmasra) under PIU Bankura Package title Design and Construction of Intermediate Pumping Station, Ground Storage Reservoirs, Overhead Reservoirs, Water Distribution Networks and Metering works in Taldangra Block SEMP is as per requirement of the Draft IEE covering package no. DWW/NCB/BK/02B/2018-19 Contractor Larsen & Toubro Ltd. Date of Contract Award 27/05/2019 Date of works commencement for 21/11/2019 particular site Contract period Construction: 3 Years ; O&M: 2 Years SEMP Component Construction of Overhead Service Reservoir – 400 KL Demolition Works No demolition activity involved Project Area Harmasra village, Harmasra Gram Panchayet of Taldangra Block Project Description Individual household water supply schemes for the project Gram Panchayets Indicative Budget for EMP INR 40,75,000/- Implementation for the entire package Project Components As per project detailed design Gram Panchayet: Harmasra Land Status Government and Transferred OHR Capacity 400 KL Location Sensitivity: LNT Construction Internal Use Design and Construction of Intermediate Doc. No. L&T/ SEMP /01 Pumping Station, Ground Storage Reservoirs, Last Revision No. 00 Overhead Reservoirs, Water Distribution Last Revision Date : 00 Networks and Metering works in Taldangra Page 3 of 46 Block. Original Issue Date : (Contract Package No: WBDWSIP/DWW/NCB/BK/02B/2018-19) Site Specific Environmental Management Plan Details of contractors on-site-personnel Zone 18 - OHSR (Harmasra), Harmasra Gram and workers Panchayet of Taldangra Block Project Manager Mr. Sasikumar PS; 8927252613 Site Engineer Mr. Soumya Jana; 9547174116 Site Supervisor Mr. Seshapu Bala Sai Aravind Kumar ;9346466373 EHS Supervisor Mr. Dhabaleswar Biswal- 9939691579 Archeological supervisor NA Skilled / semi-skilled workers 5 skilled and 5semi-skilled Unskilled workers 5 Women workers Nil Workers – local / migrant Local-10 / Migrant-05 (From other districts of West Bengal) Details of facilities Construction camps, (no’s and locations) One labor accommodation at a rented apartment at Harmasra [Ref. Attachment O2: Details of construction camp sites] Sensitivity: LNT Construction Internal Use Design and Construction of Intermediate Doc. No. L&T/ SEMP /01 Pumping Station, Ground Storage Reservoirs, Last Revision No. 00 Overhead Reservoirs, Water Distribution Last Revision Date : 00 Networks and Metering works in Taldangra Page 4 of 46 Block. Original Issue Date : (Contract Package No: WBDWSIP/DWW/NCB/BK/02B/2018-19) Site Specific Environmental Management Plan Table 1: Anticipated Impacts and Mitigation Measures – Pre-construction Environmental Mitigation Plan Field/Issues Anticipated Recommende Actions Taken/ Status Respons Monitoring of Cost and Impact d Mitigation ibility of mitigation source of Measures Impleme fund ntation Utility Electric poles • Locations • Contingency Plan has • Contrac • PIU and • Project and wires, water and been developed by tor, PIU DSISC cost lines within operators of informing to observation proposed these utilities emergency services at site and project area of to be like WBSEDCL, document OHR site. identified as Telecommunication, checking per detailed local administration design and police etc. documents to • First, we are digging prevent the trial pit manually, unnecessary if any obstruction disruption of arise the same is services removed as per during direction of end user construction • The construction work phase. to continue without • Prepare disturbing the existing spoils(Waste pipeline and electric ) poles. management • Spoil Management plan. Plan is included in Attachment O7 included with this SEMP Climate The nature and • Seasonal • Excavation works • Contrac • PIU and • Project intensity of climatic schedule during dry tor, PIU DSISC cost rainfall events in variations season have been observation an area, has should be approved by PMU. at site implications for taken into • If excavation work is surface water account to be conducted management. during during rainy season, scheduling of then preventive construction measures will be in the area. taken as per PMU approved method. Sources of Extraction of • Obtain • No involvement of • Contrac • PIU and • Project Materials materials can construction any new borrow area tor, PIU DSISC cost disrupt natural materials or quarry is observation land contours only from anticipated. at site and and vegetation government • Sand has been document resulting in approved collected from checking accelerated quarries with Damodar River and erosion, prior Aggregate has been disturbance in approval of collected from natural drainage PIU. Panchami quarry. Sensitivity: LNT Construction Internal Use Design and Construction of Intermediate Doc. No. L&T/ SEMP /01 Pumping Station, Ground Storage Reservoirs, Last Revision No. 00 Overhead Reservoirs, Water Distribution Last Revision Date : 00 Networks and Metering works in Taldangra Page 5 of 46 Block. Original Issue Date : (Contract Package No: WBDWSIP/DWW/NCB/BK/02B/2018-19) Site Specific Environmental Management Plan Field/Issues Anticipated Recommende Actions Taken/ Status Respons Monitoring of Cost and Impact d Mitigation ibility of mitigation source of Measures Impleme fund ntation patterns, • On a monthly ponding and basis water logging, documentatio and water n on material pollution. obtained from each source (quarry/borro w pit) should be submitted. • In case of involvement of new quarries/ borrow areas, prior steps will follow for all clearances and permissions as required under law. Consents, Failure to obtain • All necessary • Already done land • Contrac • PIU and • Project permits, necessary consents, requisition, electric tor, PIU DSISC cost clearances, no consents, permits, connection, water observation objection permits, NOCs, clearance, source etc. at site and certificates etc can result to NOCs, etc • Tree felling document (NOCs), etc. design revisions prior to requirement for this checking and/or stoppage award of civil site is not anticipated. of works. works should • Made provision for be obtained. detailed design • All necessary drawing and approvals for documented all construction conditions to be • Please refer obtained Attachment O3 for before start list of relevant permits of and clearances. construction. • Acknowledge in writing and report on compliance consents, permits, clearance, NOCs etc. Sensitivity: LNT Construction Internal Use Design and Construction of Intermediate Doc. No. L&T/ SEMP /01 Pumping Station, Ground Storage Reservoirs, Last Revision No. 00 Overhead Reservoirs, Water Distribution Last Revision Date : 00 Networks and Metering works in Taldangra Page 6 of 46 Block. Original Issue Date : (Contract Package No: WBDWSIP/DWW/NCB/BK/02B/2018-19) Site Specific Environmental Management Plan Field/Issues Anticipated Recommende Actions Taken/ Status Respons Monitoring of Cost and Impact d Mitigation ibility of mitigation source of Measures Impleme fund ntation obtained. Asbestos Cement Health risk due • Obtain details • OHR site free from • Contrac • PIU and • Project Pipes to exposure to on location of any asbestos cement tor, PIU DSISC cost asbestos underground pipes. observation materials Asbestos at site and Cement pipes document • Locate the checking new piper carefully to avoid encountering AC pipes • Leave the Asbestos Cement pipes undisturbed in the ground. Table 2: Anticipated Impacts and Mitigation Measures – Construction Environmental Mitigation Plan Field/Issues Anticipated Recommended Actions Taken/ Responsibility of Monitoring Cost and Impact Mitigation Measures Status Implementation of mitigation source of fund Environmental Irreversible
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages47 Page
-
File Size-