Studies for the Infrastructure Upgrading on Sections of Thessaloniki - Promachonas Railway Line (Part of OEM Corridor) 2014-EL-TM-0311-S

Studies for the Infrastructure Upgrading on Sections of Thessaloniki - Promachonas Railway Line (Part of OEM Corridor) 2014-EL-TM-0311-S

Studies for the infrastructure upgrading on sections of Thessaloniki - Promachonas Railway Line (Part of OEM Corridor) 2014-EL-TM-0311-S Multi-Annual Call Funding Objective 1 Member State(s) involved: Greece C:\Temp\fichemaps\20150630AfterCorrs\2014-EL-TM-031 (Coordinating) Applicant: Ministry of Economy, Infrastructure, Shipping and Tourism Implementation schedule: Image found and displayed. Start date: September 2015 End date: June 2018 Requested funding: Total eligible costs: €1 000 000 Requested funding: €500 000 Requested EU support: 50.00% Promachonas (Greece) and Kulata (Bulgaria) are main border-crossing points Recommended funding: between Greece and Bulgaria. The proposed Action is located on a pre-identified section Vidin-Sofia-Burgas-Thessaloniki-Athina of the Orient/East-Med Corridor. It Recommended total eligible is part of a Global Project to upgrade the railway line between Thessaloniki, €1 000 000 costs: Strimonas and Promachonas that aims to remove bottlenecks on the existing Recommended funding: €500 000 cross-border section and enhance accessibility and connectivity between the two countries. It consists of a set of studies to upgrade, electrify and improve safety of Recommended EU support: 50.00% the railway line between Thessaloniki and Promachonas. The outcome of these studies will lead to works to remove the above mentioned physical bottlenecks. In the long term the proposed action will generate a significant modal split in favour of rail along the southern branch of the Orient/East-Med Corridor. Evaluation Remarks The proposed Action is very relevant as it addresses major bottlenecks on the pre-identified section of the Orient/East-Med Corridor. Its maturity is good as financial and political commitments are ensured. The impact of the proposed Action is good as its results will be used as a decision-making tool to plan further investments. The quality of the proposal is good since the single activity is well described and the costs are realistic..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us