MPOs CCC Regional Multi-Use Trails Committee February 21, 2020 – 10:30 am Meridian One, TBARTA Conference Room 4350 West Cypress Street, Suite 700, Tampa, FL 33607 If unable to attend, a call-in number is available: 1-267-866-0999 6665 70 6432 AGENDA I. CALL TO ORDER 1. Welcome/Introductions II. PRESENTATION/DISCUSSION 1. 2020 Meetings i. Draft 2020 Regional MUTC Meeting Dates ii. 2020 Meetings | Agenda Topics 2. 2020 TBARTA MPOs CCC Board Meeting – June 19th, 2020 i. Regional MUT Committee Report ii. 2020 Regional MUT Priority Projects iii. 2020 Regional MUT Map 3. Regional Trail Corridor Updates i. Coast-to-Coast Trail ii. Peace River to Nature Coast Trail iii. Gulf Coast Trail III. 2020 PRIORITY MAP CHANGES AND ADDITIONS 1. FDOT Proposed Additions i. Adamo Greenway Gap (Hillsborough) ii. SR 54 at Starkey Overpass (Pasco) 2. Other Additions and Changes? i. Roundtable IV. OPEN FORUM/COMMENTS 1. Roundtable Updates V. NEXT MEETING 1. April 17, 2020 All meetings are at TBARTA Office, Meridian One, 4350 W. Cypress St., Suite 700, Tampa, FL 33607 VI. ADJOURNMENT The full agenda packet is available on the MPO’s website, www.planhillsborough.org, or by calling (813) 272-5940. The MPO does not discriminate in any of its programs or services. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Learn more about our commitment to non-discrimination. Persons needing interpreter services or accommodations for a disability in order to participate in this meeting, free of charge, are encouraged to contact Johnny Wong, 813-273-3774 x370 or [email protected], three business days in advance of the meeting. Also, if you are only able to speak Spanish, please call the Spanish helpline at (813) 273-3774, ext. 211. Si necesita servicios de traducción, el MPO ofrece por gratis. Para registrarse por estos servicios, por favor llame a Johnny Wong directamente al (813) 273-3774, ext. 370 con tres días antes, o [email protected] de cerro electronico. También, si sólo se puede hablar en español, por favor llame a la línea de ayuda en español al (813) 273-3774, ext. 211. In accordance with Title 17 U.S.C. Section 107, materials attached are for research and educational purposes, and are distributed without profit to MPO Board members, MPO staff, or related committees or subcommittees the MPO supports. The MPO has no affiliation whatsoever with the originator of attached articles nor is the MPO endorsed or sponsored by the originator. Persons wishing to use copyrighted material for purposes of their own that go beyond ‘fair use’ must first obtain permission from the copyright owner. If a person decides to appeal any decision made by the board, he or she will need a record of the proceedings, and for such purpose may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. TBARTA MPOs CCC 2019 Regional Multi-Use Trails Priority Projects Approved by the TBARTA MPOs CCC Board on July 13, 2018 - Draft Updates for 2019-2020 FDOT DISTRICT 1 - REGIONAL MULTI-USE TRAIL PRIORITIES (MANATEE, POLK, AND SARASOTA) 2019 Regional/State Trail Jurisdiction Project Request/Phase(s) Total Cost Ranking Corridor $425,000 RTAP requested for an $51,379,749 Legacy Trail Northern 7.5-mile northern extension of existing 12-mile Legacy Trail; existing 1 Sarasota County Gulf Coast Trail Environmental survey for the 7.5-mile Includes $8.4M from Sarasota rails-to-trails corridor connecting Venice and Sarasota downtowns. Extension corridor County for ROW Construction of 2.2 mile segment between Lake Parker and SR 33. The Request Design Funding proposed trail provides direct access to 2 regional parks and over 1,600 Peace River to acres of state-owned conservation/recreation land. A component of Funded $500,000 RTAP for PD&E 2 Tenoroc Trail Phase I City of Lakeland $1,674,460 Nature Coast Florida's SUN Trail Network, future phases will link Lakeland's Lake-to- Study of 2.2-mile segment between Lake Connector to the Van Fleet State Trail and Florida's Coast-to- Lake Parker and SR 33 Coast Trail. Need $1,196,000 for Construction From Lincoln Park (Palmetto) to US 301 (Parrish); Design and $2,900,000 $2,700,000 RTAP requested for Design Willow-Ellenton Greenway Multi- construction of enhanced trail system for pedestrians and bicycles Gulf Coast Trail and Construction of trail adjacent the 3 Use Trail from Lincoln Park Manatee County adjacent to the railroad tracks from Lincoln Park to Erie Road. 9-mile Includes $1,700,000 match (Proposed) railroad tracks from Lincoln Park to Erie segment of trail. Minimal ROW acquisition necessary as majority of from Manatee County (Palmetto) to US 301 (Parrish) Rd. corridor owned by Manatee County and FP&L. First phase between Downtown and Grave Ave. was opened in early Programmed/Funded for Construction 4 Haines City Rail/Trail Phase II City of Haines City NA 2016. Phase II extends trail to the Ridge Scenic Highway (state $130,00 for PE $1,554,000 designated scenic highway) and the Lake Eva Recreational Complex. $1,424,00 0 for CST $12,900,000 for extension from Anna Maria Island Multi-Use Cities of Bradenton Gulf Coast Trail 26-mile commuter route spanning five Manatee and Sarasota County Longboat Key to Manatee Avenue 5 $12,900,000 Trail Beach & Holmes Beach (Proposed) island communities. parallel to SR 780/Gulf Drive including downtown cycle tracks Phase II extends nearly 12-miles through state-owned Tenoroc Preserve and will connect Phase I to the SR 570 Polk Parkway Peace River to 6 Tenoroc Trail Phase II Polk County Overpass Trail currently programmed for construction by Florida's $2,000,000 RTAP requested for PD&E $8,700,000 Nature Coast Turnpike (FPN: 438018-1). Project will connect Lakeland's Lake-to- Lake Connector to the Coast-to-Coast Tail via the Van Fleet State Trail. Legacy Trail, Osprey Junction Legacy Trail at East end of Bay Street; Design and construct a 10-foot 7 Sarasota County Gulf Coast Trail wide multi-use trail connecting Legacy Trail to Osprey Park, including $2,000,000 RTAP for Construction $2,000,000 Trailhead parking, restrooms and additional amenities. FDOT DISTRICT 7 - REGIONAL MULTI-USE TRAIL PRIORITIES (CITRUS, HERNANDO, HILLSBOROUGH, PASCO, AND PINELLAS) 2019 Regional/State Trail County Project Request/Phase(s) Total Cost Ranking Corridor Upper Tampa Bay Trail - Approximately 3 miles, the trail will be the final link between the scenic, Hillsborough County has no request this 1 Suncoast Trail Connection Hillsborough SUN Trail Network 7+ mile Upper Tampa Bay Trail and 40+ mile Suncoast Trail between $6,000,000 year pending alignment decision. (UTBT Phase IV) Peterson Rd. Park and the Brooker Creek Headwaters at Van Dyke Rd. Pinellas County section of trail 12-15 Pasco County Section: Extension of the Starkey Blvd. Trail from north of SR 54 in Pasco foot wide paved. Pinellas County section $3.5 million 2a Starkey Gap Pasco/ Pinellas Coast-to-Coast County to the Pinellas Trail in Pinellas County. Approximately 2.9 miles constructed, Pasco County section Pinellas County Section: in Pasco County and 4.9 miles in Pinellas County. funded. $4.5 million Suncoast Trail/Good Neighbor Phase I - 10 to 12-foot wide paved multi- From the Suncoast Trail, extending east along SR50, and thru the City Trail Connector (Coast-to-Coast use trail from Suncoast Trail to Cobb 2b Hernando Coast-to-Coast of Brooksville for approximately 6 miles to connect with the Good Total Cost: $10,600,800 Road. FDOT PD&E complete. PE Connector - Good Neighbor Neighbor Trail. underway. Gap) Suncoast Trail/Good Neighbor Phase II - 10 to 12-foot wide paved multi- Trail Connector (Coast-to-Coast From the Suncoast Trail, extending east along SR50, and thru the City use trail from Cobb Road to Good 2b Hernando Coast-to-Coast of Brooksville for approximately 6 miles to connect with the Good Neighbor Trail Trailhead at Russell Total Cost: $25,800,500 Connector - Good Neighbor Neighbor Trail. Street. MPO study complete. PE Gap) underway. The Duke Energy Trail total length for the gap is 22-miles, for 12-15 foot wide paved bicycle/pedestrian trail with amenities. Request for $22M. John Chestnut Sr Park to Enterprise Road section current Design Build project. From the southern terminus of the Pinellas Trail at John Chestnut Sr. Enterprise Road to Sunset Point Road Total Cost: $22 million Park, extending south along the Duke Energy transmission corridor, to 3 Duke Energy Trail Pinellas Gulf Coast Trail constructed. Sunset Point Road to Old end at Weedon Island. SUN Trail program has funded design/build for Coachman Road designed and funded. SUN Trail: $5.2M PE/CST portion from Enterprise Road to John Chestnut Park. Old Coachman Road to Haines Bayshore Road constructed. Haines Bayshore Road to Roosevelt Blvd unfunded. Roosevelt Blvd constructed. Roosevelt Blvd to Weedon island unfunded. Connection from Gandy Bridge (east of Friendship Trail bridge) to Bayshore Boulevard linear park. Connection 1: From Bridge St. at Tyson Ave east to Manhattan Ave, Trail along Tyson Ave - ROW .75 mile Tampa requests funding for Connection Connection 2: From Manhattan Ave. and Interbay Blvd. west to Picnic Request: 2 construction of 12-foot wide paved Island Park along MacDill Air Force Base north boundary (N Boundary $1.8M million bicycle/pedestrian trail and boardwalk 4 South Tampa Greenway Hillsborough SUN Trail Network Blvd.) - 3.2 mile (where needed) with amenities including Connection 3: From Manhattan Ave.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages6 Page
-
File Size-