Orgosynth Chemicals Pvt. Ltd. At

Orgosynth Chemicals Pvt. Ltd. At

Final Environmental Impact Assessment Report & Environment Management Plan for Proposed Project for manufacturing of Dye Intermediates – 3049 MTPM by Orgosynth Chemicals Pvt. Ltd. at Plot No. J-50, J-51, J-52 and J-53, MPIDC Growth Center Borgaon, Tehsil: Sausar, Dist. Chhindwara, Madhya Pradesh Project Activity: 5(f), Category: A ToR Letter No. F. No. J-11011/249/2020-IA-II(I) (Study Period: October, 2020 to December, 2020) Prepared by San Envirotech Pvt. Ltd. Accredited QCI-NABET Consultant (NABET Accreditation No. NABET/EIA/1619/RA0084; Valid till 26.08.2021) MoEFCC Recognized Environmental Laboratory under EP Act, 1986 Address: 424, Medicine Market, Paldi Cross Road, Ahmedabad-380006, Gujarat Email: [email protected] (July, 2021) Document No. Revision No. Issue No. Release on EIA/SEPL/2020/OCPL/27 -- 01 27/01/2021 EIA/SEPL/2021/OCPL/29 01 02 29/07/2021 San Envirotech Pvt. Ltd., Ahmedabad Contents Particulars Page No. Index I List of Tables X List of Figures XIII List of Annexures XV Index Chapter 1 Introduction Page No. 1.1 Preface 1-1 1.2 Purpose of the Report 1-1 1.3 Identification of Project & Project Proponent 1-2 1.4 Importance of the project 1-3 1.5 Brief description of project 1-3 1.6 Applicable Environmental Regulatory Framework 1-5 1.7 Scope of the study 1-5 1.8 Compliance to terms of reference 1-6 1.9 Objective of EIA 1-22 1.10 Methodology for EIA 1-22 1.11 List of industries surrounding project site 1-23 1.12 Structure of report 1-24 Chapter 2 Project Description 2.1 Introduction 2-1 2.2 Need For The Project 2-1 2.3 Location of The Project 2-2 2.4 Size or magnitude of operation 2-5 2.4.1 Land breakup & project site layout 2-5 2.4.2 Project Magnitude 2-7 2.5 Infrastructure Facilities (Proposed plant Equipments/ 2-8 machineries) 2.6 Description of manufacturing process 2-8 2.7 Project Components 2-39 2.8 Input Requirements 2-39 2.9 Generation of pollutants 2-44 2.9.1 Wastewater generation 2-44 Final EIA Report of Orgosynth Chemicals Pvt. Ltd. I San Envirotech Pvt. Ltd., Ahmedabad 2.9.2 Gaseous emission 2-44 2.9.3 Hazardous & solid waste generation 2-46 2.9.4 Noise Generation 2-46 2.10 Pollution control strategy 2-47 2.10.1 Effluent Management 2-47 2.10.2 Air Pollution Control(APC) Measures 2-49 2.10.3 Hazardous/Solid Waste Management 2-50 2.10.4 Noise Pollution Control Measures 2-50 2.11 Rain Water Harvesting 2-51 2.12 Green Belt Development 2-51 2.13 Occupational Health & Safety 2-51 Chapter 3 Description of Environment 3.1 General 3-1 3.2 Study area 3-1 3.3 Study Period 3-2 3.4 Source of environmental data generation 3-2 3.5 Methodology 3-2 3.6 Land Environment 3-3 3.6.1 Land use pattern of the Study Area 3-3 3.6.2 Objective of Land Use Studies 3-3 3.6.3 Topography 3-5 3.6.4 Seismicity of the area 3-5 3.7 Meteorology 3-6 3.7.1 Site specific micro-meteorological data 3-6 3.7.2 Wind Rose 3-7 3.8 Ambient air quality 3-8 3.8.1 Introduction 3-8 3.8.2 Design Network for Ambient Air Quality Monitoring 3-8 Stations 3.8.3 Reconnaissance 3-8 3.8.4 Parameters, Frequency and monitoring Methodology 3-8 3.8.5 Interpretation of the result 3-10 3.9 Water Environment 3-11 3.9.1 Hydro-Geology of the Study Area 3-11 3.10 Water quality 3-12 3.10.1 Introduction 3-12 Final EIA Report of Orgosynth Chemicals Pvt. Ltd. II San Envirotech Pvt. Ltd., Ahmedabad 3.10.2 Sampling Frequency, Techniques & Methodology 3-13 3.10.3 Surface Water Quality (Primary data) 3-14 3.10.4 Ground Water Quality 3-14 3.10.5 Interpretation 3-14 3.10.6 Conclusion 3-15 3.11 Noise Environment 3-15 3.11.1 Instrument used for Sampling and Monitoring 3-15 3.11.2 Noise Quality Monitoring Locations 3-16 3.11.3 Ambient Noise Standards 3-16 3.11.4 Results 3-16 3.11.5 Conclusion 3-16 3.12 Soil Environment 3-17 3.12.1 Soil sampling locations 3-17 3.12.2 Methodology 3-17 3.12.3 Corollaries 3-18 3.12.4 Conclusion 3-19 3.13 Biological Environment 3-19 3.13.1 Period of the study 3-20 3.13.2 Study methodology 3-20 3.13.3 Floral species in the study area 3-20 3.13.4 Fauna in the study area 3-20 3.14 Socio Economic Environment 3-21 3.14.1 Objective of the study 3-21 3.14.2 Land use pattern and infrastructure 3-22 3.14.3 Demographic and Socio-Economic Environment 3-22 3.14.4 Living Standard and Infrastructure 3-23 Chapter 4 Anticipated Environmental Impacts & Mitigation Measures 4.1 General 4-1 4.2 Identification of Impact 4-2 4.2.1 Identification of Impacting Activities 4-2 4.2.2 Identification of Environment Attributes 4-3 4.3 Impact on Topography 4-3 4.4 Impact on Air Environment 4-3 4.4.1 Air Pollution Dispersion modeling of stack 4-4 4.4.2 Micrometeorology 4-5 Final EIA Report of Orgosynth Chemicals Pvt. Ltd. III San Envirotech Pvt. Ltd., Ahmedabad 4.4.3 Input data 4-6 4.4.4 Receptor Network 4-6 4.4.5 Output of Model (24-hourly GLCs) 4-7 4.4.6 Incremental & cumulative concentration of pollutants 4-7 4.4.7 Conclusion 4-7 4.5 Impact on Water Environment 4-8 4.6 Impact on Noise Environment 4-9 4.7 Impact on Land Environment 4-10 4.8 Impact on Biological Environment 4-11 4.9 Impact on Socio-Economic Environment 4-12 4.10 Impact on Occupational Health & Safety 4-13 4.11 Impact On Traffic Movement 4-14 Chapter 5 Analysis of Alternatives 5.1 Prologue 5-1 5.2 Site Alternative 5-1 5.3 Process Alternative 5-2 Chapter 6 Environmental Monitoring Program 6.1 Prelude 6-1 6.2 Environment Monitoring Program 6-1 6.3 Objective of Monitoring Plan 6-1 6.4 Schedule for Environment Monitoring 6-2 6.5 Ambient Air Quality Monitoring 6-2 6.6 Water Environment Monitoring 6-3 6.7 Noise Environment Monitoring 6-3 Chapter 7 Additional Studies (A) Public Consultation 7-1 (B) Hazard Analysis & Risk Assessment 7-13 7.1 Introduction 7-13 7.2 Risk Assessment- Identification of Hazards 7-13 7.3 Hazardous Materials Storage 7-15 7.4 Risk Screening Approach 7-16 7.4.1 Acute Exposure Guideline Levels (AEGLs) 7-19 7.4.2 Emergency Response Planning Guidelines (ERPGs) 7-20 7.5 QRA Approach 7-21 7.6 Thermal Hazards 7-22 7.7 Damage due to explosion 7-23 Final EIA Report of Orgosynth Chemicals Pvt. Ltd. IV San Envirotech Pvt. Ltd., Ahmedabad 7.8 Toxic release 7-23 7.9 Acid/Alkali Hazards 7-24 7.10 Likely Failure Scenarios 7-25 7.11 Quantitative Risk Assessment & Consequence Analysis 7-25 7.11 Preamble 7-25 7.11.2 Weather Effect 7-26 7.12 Incidents Impacts 7-26 7.13 Consequential Impacts 7-32 7.13.1 Thermal and Explosion Hazards 7-32 7.13.2 Toxic Hazards 7-32 7.13.3 Other Hazards 7-32 7.13.4 Other Toxic Hazards 7-32 7.14 Occupational Health 7-33 7.15 Conclusion & Recommendations 7-34 7.16 Action plan for handling & safety system of Chemical 7-35 7.16.1 Safety Measures for Transportation and Unloading of 7-35 Hazardous Chemicals 7.16.2 Safety Measures for Storage/Handling of Hazardous 7-36 Chemicals 7.16.3 Safety Measures for Process Units 7-36 7.16.4 Safety Measures for Preventive Maintenance 7-37 7.16.5 Safety measures to prevent spillage/leakage of toxic 7-37 chemicals 7.17 Arrange ments for ensuring health & safety of workers 7-38 engaged in handling of toxic materials 7.18 Disaster Management Plan (DMP) 7-39 7.18.1 Definitions 7-40 7.18.2 Objective of the Disaster Management Plan 7-41 7.19 Onsite Emergency Plan 7-41 7.19.1 Incident Controller 7-41 7.19.1.1 Duties of Incident Controller 7-41 7.19.2 Site Main Controller 7-42 7.19.2.1 Duties of Site Main Controller 7-42 7.19.3 Other Key Personnel 7-43 7.19.3.1 Emergency Response Team 7-43 7.19.3.2 Emergency personnel’s Responsibilities outside Normal 7-44 Working Hours of the Factory 7.19.3.3 Assembly Points 7-44 Final EIA Report of Orgosynth Chemicals Pvt. Ltd. V San Envirotech Pvt. Ltd., Ahmedabad 7.19.4 Emergency Control Centre 7-44 7.19.4.1 Role of Emergency Control Centre 7-44 7.19.5 Fire & Toxicity Control Arrangements 7-45 7.19.6 Medical Arrangements 7-45 7.19.7 Transport & Evacuation, Mutual Aid Arrangements 7-45 7.20 Communication System 7-45 7.20.1 Declaring the Emergency 7-45 7.20.1.1 Type of Sirens 7-45 7.20.1.2 Location of Siren 7-46 7.20.1.3 Raising alarm 7-46 7.20.2 Internal Communication 7-47 7.20.2.1 Availability of Key Personnel outside Normal Working 7-47 Hours 7.20.3 Communication to the Authorities 7-48 7.21 Pre-emergency Activities 7-48 7.22 Post-emergency Activities 7-48 7.22.1 Evacuation and Transportation 7-48 7.22.2 Safe Close Down 7-48 7.22.3 Use of Mutual Aid 7-49 7.22.4 Use of External Authorities 7-49 7.22.5 Medical Treatment 7-49 7.22.6 Accounting for Personnel 7-49 7.22.7 Access to Records 7-49 7.22.8 Public Relations 7-49 7.22.9 Rehabilitation 7-49 7.23 Causes of emergency 7-50 7.23.1 Risk 7-50 7.23.1.1 Nature 7-50 7.23.1.2 Various emergency actions 7-50 7.23.1.3 Response time-minutes 7-51 7.24 Off-site emergency plan 7-51 7.24.1 Need of the site emergency plan 7-51 7.24.2 Structure of the off-site emergency plan 7-52 7.24.3 Role of the Factory Management 7-52 7.24.4 Role of Emergency Co-ordination office (ECO) 7-52 7.24.5 Role of local Authority 7-52 Final EIA Report of Orgosynth Chemicals Pvt.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    278 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us