Air Environmental Impact

Air Environmental Impact

E-241 Public Disclosure Authorized Environmental Impact Statements of Improving International Container Multi-model Transportation System Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Aug. 1998 P96 @w-Bd 34 91Ni rI . t R 4 Aff W W w 3 Assessment Section: Environmenfal Impact Assessment Center in Tianjin (Sub-section: Environmental Science Research Center of Nankai University) Assessment certificate number: No.0934 National Environmental Impact Assessment, Class A Manager of EIA Project: ZIiu Tan (Professor & Environmental Specialist) Compiler of TOR: Xu He (Engineer), Z/angli(Engineer), Jia Chunrong (Engineer), Xu Fan (Engineer), Xu Wenke (Engineer). Compilers of EIS: Xu He (Engineer), Zlhang Li (Engineer), Jia Chunrong (Engineer), Xu Fan (Engineer), Xu Wenke (Engineer) Liao hong(Engineer) Wang dali(Engineer) Participators of Project: Xu He, Zhang Li, Jia Chunrong, Xu Fan, Xu Wenke, Zhang Qingming, Liyan, Ren Guozhen, Liu bingyue (professor) Technical Examiner and Verifier: Li Dingyu (Advanced Engineer) Contents Chapter 1 Executive Summary---------------------------------------------1 1.1 Introduction---------------------------------------------------------------1 1.2 Project description------------------------------------------------ --1 1.3 Baseline data of all ICDs ------------------------------------------------2 1.3.1 Natural environment of all ICDs ------------------------------------2 1.3.2 Investigation and assessment of the existing environmental quality of all ICDs -----------------------------------2 1.4 Environmental impact and mitigation plan-------------------------3 1.4.1 Negative impact---------------------------------------------------------3 1.4.1.1 Environmental impact due to construction phase-------------3 1.4.1.2 Environmental impact due to operational phase--------------4 1.4.2 Positive Impact---------------------------------------------------------10 1.4.3 Environmental investments of all ICDs---------------------------- 10 1.5 Analysis of Alternatives-------------------------------------------------10 1.6 Environmental management and training plan--------------------11 1.6.1 Environmental management-----------------------------------------11 1.6.2 Staff training-----------------------------------------------------------13 1.7 Environmental monitoring plan---------------------------------------14 1.8 Public involvement------------------------------------------------------15 1.8.1 Content and form of public involvement--------------------------15 1.8.2 Conclusion of public involvement investigation -----------------15 Chapter 2 Policy, Legal and Administrative Framework--------------21 2.1 China' s EIA policies and laws---------------------------------------21 2.2 Laws and regulations of the project--------------------------------- 21 2.3 China' s environmental protection management organizations--------------------------------------------------------- --- 23 2.4 Assessment basis--------------------------------------------------------23 Chapter 3 Project Description--------------------------------------------- -25 3.1 General introduction of ICDs -----------------------------------------25 3.1.1 The main functions of ICDs---------------------------------------- 26 3.1.2 Analysis of engineering process------------------------------------- 26 3.1.3 Analysis of major pollution source--------------------------------- 28 3.1.4 Assessment contents --------------------------------------------------28 3.1.5 Assessment emphases ------------------------------------------------- 28 3.1.6 Environmental sensitive areas and controlling targets------29 3.1.6.1 Environmental sensitive areas------------------------------------29 3.1.6.2 Controlling targets---------------------------------------------------29 3.1.7 Assessment scope-------------------------------------------------------29 3.2 Description of 11 sub projects------------------------------------------29 3.2.1 Tianjin Port ICD-------------------------------------------------------30 3.2.2 Tangshan ICD-----------30 3.2.3 Qinhuangdao ICD------------------ --------------------- 31 3.2.4 Baoding ICD----------------------------------- -----------------------31 3.2.5 Shijiazhuang ICD---------------------------------------------------31 3.2.6 Cangzliou ICD-----------------------------------------------------32 3.2.7 Handan ICD----------------------------------------------------------32 3.2.8 Baotou ICD---------------------------------------33 3.2.9 Xintang ICD------------------------------ 33 3.2.10 Xiaoshan ICD-------------------------------------------------------34 3.2.11 Huzhou ICD---------------------------------------------------------34 Chapter 4 Baseline data of all ICDs--------------------------------------35 4.1 Baseline data of Tianjin Port ICD ----------------------------------35 4.1.1 Natural environment------------------------------------------------35 4.1.2 Investigation and assessment of the existing environmental quality of Tianjin Port ICD-----------------------------------------------35 4.2 Baseline dada of Tangshan ICD-------------------------------------36 4.2.1 Natural environment-----------------------------------------------36 4.2.2 Investigation and assessment of the existing environmental quality of Tangshan ICD ---------------------------------------------37 4.3 Baseline data of Qinhuangdao ICD---------------------------------37 4.3.1 Natural environment------------------------------------------------37 4.3.2 Investigation and assessment of the existing environmental quality of Qinhuangdao ICD ----------------------------------------38 4.4 Baseline data of Baoding ICD ---------------------- 9------------------39 4.4.1 Natural environment------------------------------------------------39 4.4.2 Investigation and assessment of the existing environmental quality of Baoding ICD---------------------------------------------40 4.5 Baseline data of Shijiazhuang ICD--------------------------------40 4.5.1 Natural environment------------------------------------------------40 4.5.2 Investigation and assessment of the existing environmental quality of Shijiazhuang ICD ---------------------------------------40 4.6 Baseline data of Cangzhou ICD--------------------------------------42 4.6.1 Natural environment-----------------------------------------------42 4.6.2 Investigation and assessment of the existing environmental quality of Cangzhou ICD -------------------------------------------------- 42 4.7 Baseline data of Handan ICD -----------------------------------------42 4.7.1 Natural environment------------------------------------------------42 4.7.2 Investigation and assessment of the existing environmental quality of Handan ICD -----------------------------------------------43 4.8 Baseline data of Baotou ICD-----------------------------------------44 4.8.1 Natural environment------------------------------------------------44 4.8.2 Investigation and assessment of the existing environmental quality of Baotou ICD-------------------------------------------------------44 4.9 Baseline data of Xintang ICD -----------------------------------------45 4.9.1 Natural environment-------------------------------------------------45 4.9.2 Investigation and assessment of the existing environmental quality of Xintang ICD ------------------------------------------------ 45 4.10 Baseline data of Xiaoshan ICD---------------------------------------46 4.10.1 Natural environment-------------------------------------------------46 4.10.2 Investigation and assessment of the existing environmental quality of Xiaoshan depot---------------------------------------46 4.11 Baseline data of Huzhou ICD----------------------------------------47 4.11.1 Natural environment-------------------------------------------47 4.11.2 Investigation and assessment of the existing environmental - quality of Huzhou ICD----------47 Chapter 5 Environmental impact and mitigation plan-----------------48 5.1 Negative impact-----------------------------------------------------------48 5.1.1 Environmental impact due to construction phase---------------48 5.1.2 Environmental impact due to operational phase----------------50 5.2 Positive Impact-----------------------------------------------------------63 Chapter 6 Analysis of Alternatives-----------------------------------------63 6.1 Alternatives of wastewater treatment of Qinhuangdao ICD----63 6.2 Location alternatives of Baoding ICD-------------------------------63 6.3 Location alternatives of Shijiazhuang ICD ------------------------64 6.4 Location alternative of Handan ICD---------------------------------64 6.5 Location alternatives analysis of Baotou ICD----------------------64 Chapter 7 Analysis of environmental economy cost -benefit ---------66 7.1 Analysis of environmental economy cost-benefit of Tianjin Port ICD and Baotou ICD-------------------------------------------------------66 7.2 Analysis of environmental economy cost -benefit of other ICDs-----------------------------------------------------------------67 Chapter 8 Environmental management and training plan------------68 8.1 Environmental management of Tianjin Port ICD.----------------68 8.1.1 Establishment of environmental management index system--68 8.1.2 Responsibilities of environmental management sectors--------68 8.2 Environmental management of other 10 ICDs---------------------70 8.2.1 Environmental management plan----------------------------------70 8.2.2 Environmental management organizations----------------------70 8.2.3 Responsibilities

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    109 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us