Republic of Rwanda Ministry in Charge of Emergency

Republic of Rwanda Ministry in Charge of Emergency

REPUBLIC OF RWANDA MINISTRY IN CHARGE OF EMERGENCY MANAGEMENT Jya Mbere Project/Socio-Economic Inclusion of Refugees and Host Communities Project (SEIRHCP) Quarter Two Progress Report October - December 2020 March 2021 1 Contents I. Executive Summary of the implementation period (October - December 2021) ................. 6 II. Update on the Implementation of Strategic Plan for Refugee Inclusion 2019-2024 ...........10 III. Implementation Progress by Component .........................................................................11 Component One: Access to Basic services and Socio-economic Investments ........................11 Sub-component 1(a): Access to basic services ..................................................................13 Sub-component 1(b): Socioeconomic Investments ...........................................................22 Component Two: Economic Opportunity .............................................................................24 Subcomponent 2(a): Access to finance ............................................................................24 Subcomponent 2(b): Capacity building for access to finance ............................................24 Component Three: Environmental Management .................................................................26 Component Four: Project Management/M&E......................................................................26 Staffing and provision of equipment ................................................................................26 Monitoring and Evaluation (M&E) ...................................................................................27 Compliance with Safeguards Policies ...............................................................................28 Stakeholder Engagement ................................................................................................30 Technical Team (TT) & Project Steering Committee (PSC) Meetings ..................................31 Grievance Redress Mechanism ........................................................................................31 Strategic communications for raising awareness on refugees right to work ......................32 Capacity building.............................................................................................................33 Financial Management and Disbursements......................................................................33 Procurement implementation progress ...........................................................................33 V. Updates on the implementation of the second implementation support mission conducted from 5th to 9th October 2020 .................................................................................................34 VI. Key Challenges and way forward ........................................................................................37 VI. Key planned activities for Jan-March, 2021 ......................................................................37 VIII. Appendices......................................................................................................................39 Annex 1. Summary of stakeholder Engagement Activities ................................................39 Annex 2: Summary of progress against the results framework..........................................41 2 LIST OF TABLES Table 1: Updates on implementation progress of SPRI .................................................................................................11 Table 2: Status of component one subprojects ..............................................................................................................12 Table 3: Progress of construction works for 40 classrooms in Gisagara District ........................................................13 Table 4: Number of casual labors per site for classrooms under construction in Gisagara District..........................14 Table 5: Summary of progress for ongoing feasibility studies for classrooms construction......................................16 Table 6: Summary of progress for supply of desks in existing schools in Gatsibo District.........................................17 Table 7: Number of students using supplied desks on existing schools in Gatsibo ....................................................17 Table 8: Number of casual workers for supply of desks at existing classrooms in Gatsibo .......................................17 Table 9: Implementation progress of feasibility studies for construction/upgrade of TVETs ...................................19 Table 10: Number of equipment lots supplied to the Ngarama Health Center ..........................................................20 Table 11: Implementation progress of health center subprojects as of Dec 2020......................................................21 Table 12: Implementation progress of water supply system as of Dec 2020 ..............................................................22 Table 13: Implementation progress markets subproject as of Dec 31,2020 ...............................................................23 Table 14: Progress for access to finance as of December 31, 2020 ..............................................................................24 Table 15: Progress of activities for Needs Assessment of beneficiaries of component two .....................................25 Table 16: Progress of activities to support implementation of component two ........................................................25 Table 17: Progress for rehabilitation of ravines and construction of surface or ground water reservoirs ..............26 Table 18: Summary of compliance with safeguards for ongoing construction activities in Gisagara as of December 31,2021 ......................................................................................................................................................................29 Table 19: Summary of grievance redress as of December 31, 2021 .............................................................................31 Table 20: Summary of procurement implementation progress....................................................................................33 3 LIST OF FIGURES Figure 1: Location of refugee camps and Refugee statistics, as of November 30,2020 ............................................... 6 Figure 2: Elevation of bricks masonry works at GS MUGOMBWA block 1 ..................................................................15 Figure 3: Elevation of Bricks masonry works for First floor completed at EP nyabitare ............................................15 Figure 4: Casting concrete columns for first floor at GS MUGOMBWA Block 2 ..........................................................15 Figure 5:First floor slab casted at EP LINDA.....................................................................................................................15 Figure 6: Ongoing construction of Pit latrines.................................................................................................................15 Figure 7: ongoing construction of Pit laytrines at EP NYABITARE.................................................................................15 Figure 8: Sample of Picture for delivered desks under use ...........................................................................................18 Figure 9: Surgical lamp and Lab Fridge.............................................................................................................................20 Figure 10: Radiant warmer and Autoclave ......................................................................................................................21 Figure 11: Temperature and address recording as well as hand washing stations with fences before accessing the site .............................................................................................................................................................................30 Figure 12: Illustration of site visit meeting with workers at GS Mugombwa ..............................................................30 Figure 13: The Director of GS Mugombwa briefing WB country Manager and Minister of MINEMA before site tour ............................................................................................................................................................................32 Figure 14: Different delegates touring construction site ...............................................................................................32 4 Acronyms AEC: African Entrepreneur Collective BPR: Bank Populaire du Rwanda COVID 19: Corona Virus Disease 19 DIA: District Implementation Agreement ESA: Environmental and Social Audit IDA: International Development Association ISM: Implementation Support Mission IT: Information Technology JV: Joint Venture LODA: Local Administrative Entities Development Agency NST1: National Strategy for Transformation One MINEMA: Ministry in Charge of Emergency Management MININFRA: Ministry of Infrastructure MoH: Ministry of Health RBC: Rwanda Biomedical Center RFP: Request for Proposal RPF: Resettlement Policy Framework RTDA: Rwanda Transport Development Agency SEIRHCP: Social Economic Inclusion of Refugee and Host Community Project ToRs: Terms of References TT: Technical Team TVET: Technical and Vocational Education and Training UNHCR: United Nation High Commission of Refugees WASAC: Water and Sanitation Corporation WDA: Workforce Development Agency 5 I.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    45 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us